Action Date |
Action |
Description |
DEC Staff |
3/17/2000 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77866 (Added by System) |
Former Staff |
3/17/2000 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
|
Former Staff |
3/17/2000 |
Site Added to Database |
|
Former Staff |
5/16/2000 |
Update or Other Action |
A letter was sent this date by the CSP to Jalasko Investments in response to review of the North Wind Environmental "Underground Storage Tank (UST) Closure Assessment Review, Tract B1, Spring Brook Vista, Eagle River, Alaska" dated 12/30/99, received on 1/3/00. The report letter outlines work performed during removal of one 1,500 gallon diesel UST and debris of an additional UST of unknown contents and capacity in October 1999. Bedrock was encountered initially at 15' bgs and deepened to 22' bgs with westerly excavation. DRO contamination was 1,000 mg/kg at the south excavation boundary The site assessment report is incomplete. Based on information in the report letter, additional investigation and corrective action will be needed at this location. A more detailed work plan is requested to be submitted by 6/30/00 that incorporates comments from this CSP letter sent including a schedule for the work and reporting dates. The CSP requests that sampling and analysis of the UST include DRO, GRO, BTEX, and PAHs if the DRO sample exceeds 500 ppm. The second UST should be sampled for the previously mentioned analytes and additionally for RRO and HVOs. Neither sampling results nor locations were provided in the report. Excavation and side walls and bottom should be field screened at a minimum rate of one sample for each 100 square feet. UST procedures Manual Sections 4.4.2 and 4.5, and 4.5.1 need to be followed. |
Lynne Bush |
6/22/2000 |
Document, Report, or Work plan Review - other |
Received a copy of the North Wind Environmental "Phase I Site Assessment for Tract B1, Spring Brook Vista Subdivision" dated 6/2/99. The report made several recommendations. These include: that a limited subsurface investigation be performed with a backhoe and metal detector at the location of anomalies to confirm suspected causes of anomalies; the recently located UST should have its contents pumped, characterized by field screening, and disposed of properly before removal from ground; the soil beneath the UST should be visually inspected and field screened for the presence of potential petroleum hydrocarbon contamination; several soil samples should be collected from the bottom of the excavation and sent for analysis, if significant soil contamination is discovered, the soil should be removed for treatment or disposal. |
Lynne Bush |
6/30/2000 |
Leaking Underground Storage Tank Corrective Action Underway |
Reviewed the North Wind Environmental work plan entitled "Underground Storage Tank Corrective Action/Closure Assessment, Spring Brook Vista Subdivision, Eagle River, Alaska" dated June 2000, received on 6/27/00. The work plan was approved as written. |
Lynne Bush |
4/10/2001 |
Update or Other Action |
Received report; left message for Yancey to call me; not complete. |
Lynne Bush |
6/20/2001 |
Update or Other Action |
Sent a letter this date to Joe Ashlock of Jalasko requesting additional information on the stockpile screening and sampling for both the clean and contaminated soil piles as well as a treatment and disposal work plan for the contaminated soil. A response was requested by 8/24/01. |
Lynne Bush |
8/24/2001 |
Update or Other Action |
A reply to the 6/30/01 letter is overdue. |
Lynne Bush |
12/10/2001 |
Update or Other Action |
Sent a letter this date which is the "Second Request for Additional Information and Site Characterization, Springbrook Vacant Property, Tract B1, Springbrook Vista Subd., Eagle River, Alaska" |
Lynne Bush |
12/12/2001 |
Update or Other Action |
On this date the CSP received a copy of the North Wind Environmental "Work Plan, Groundwater Monitoring UST Closure and Corrective Action, Spring Brook Vista Subdivision, Eagle River, Alaska" dated November 2001. |
Lynne Bush |
12/21/2001 |
Update or Other Action |
Site transferred Bush to Sundet. |
Lynne Bush |
6/18/2002 |
Update or Other Action |
Site transferred from Sundet to Dreyer. |
Amanda Dreyer |
6/24/2002 |
Release Investigation |
Contacted Kim Kearney with Northwind Environmental via email regarding the North Wind Environmental "Work Plan, Groundwater Monitoring UST Closure and Corrective Action, Spring Brook Vista Subdivision, Eagle River, Alaska" dated November 2001 and what changes need to be made. The requested changes include: put one monitoring well at location of removed UST and two downgradient of SBV-07 and SBV-13 and their locations plotted on a figure; a work plan for stockpile screaning and sampling and a treatment/disposal plan; and add analytical and screening sample depths be located on separate figures. |
Amanda Dreyer |
10/15/2002 |
Update or Other Action |
The CSP reviewed a copy of the North Wind Environmental "Final Work Plan, Groundwater Monitoring UST Closure and Corrective Action, Spring Brook Vista Subdivision, Eagle River, Alaska" dated October 2002, received 10/4/02, and sent an approval letter. One MW is approved to be installed and sampled. Additoonal MWs may be requested later pending the analytical results of the sampling event. A stockpile sampling plan due 3/1/03 was also requested in the letter as well as the contaminated stockpiles be covered and maintained throughout the year. |
Amanda Dreyer |
2/19/2003 |
Document, Report, or Work plan Review - other |
The CSP reviewed a copy of the North Wind Environmental "Monitoring Well Installation Report, Spring Brook Vista Subdivision, Eagle River, Alaska" dated 11/25/02, received 11/26/02. A review of the report indicated that one MW was installed at the approximate location of the former UST where it hit bedrock at 17' bgs. The well was dry and unable to be sampled. The CSP sent a letter this date that requested periodic inspection of the MW be made on at least a quarterly basis and sampled if water appears in the well. |
Amanda Dreyer |
5/29/2003 |
Document, Report, or Work plan Review - other |
The CSP reviewed a copy of the North Wind Environmental "Results of Groundwater Monitoring Well Monitoring, Tract B-1 Spring Brook Vista Subdivision, Eagle River, Alaska" dated 5/27/03, received 11/26/02. The well was monitored on 5/23/03 and had 0.2" of muddy water in the bottom and based on this information was considered to essentially be dry and unable to be sampled. The conditions have not changed since the last monitoring event was attempted on 2/27/03. This was the third quarterly monitoring event since the well installation. |
Amanda Dreyer |
3/31/2005 |
Update or Other Action |
The CSP received a letter from the Greg Oczkus Law Offices dated 3/30/05 who represents a prospective purchaser of the property. The letter indicates that the prospective purchaser is awaiting the conslusion of the property cleanup and that North Wind Environmental will be attempted to be contacted to ask the status of their remedial plan and future efforts to determine what program exists for finalization of the remediation. |
Eric Henry |
4/1/2005 |
Update or Other Action |
Eric Henry sent a letter to the RP with this date requesting an update on the site status as well as other work and issues. |
Bill Petrik |
4/8/2005 |
Update or Other Action |
Met with attorney of potential purchaser. Drafted letter requesting monitor wells installed that can recover groundwater and sampling of stockpiled soil. The stockpile on the site has overextended the duration a stockpile can remain onsite without a treatment plan. |
Eric Henry |
6/27/2007 |
Exposure Tracking Model Ranking |
Initial ranking. |
Bill Petrik |
6/27/2007 |
Update or Other Action |
Email communication, on this date, between former CS site manager, DOT, and DHI Consulting Engineers regarding stockpiled material in the ROW. DOT requested testing of the ROW after the stockpile had been moved from the ROW. |
Keather McLoone |
9/19/2011 |
Site Visit |
Site visit conducted to observe current site conditions. Difficult to ascertain where and if contaminated stockpiles remain, could not locate any liner material under stockpiled soil. Could not locate former monitoring well. Lots of debris and large piles of soil on uneven terrain. Email communication with DOT regarding their 2007 request for sampling. |
Keather McLoone |
8/29/2012 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77866 2,000 Gallon UST. |
Keather McLoone |
10/1/2012 |
Site Visit |
Site visit conducted to observe current site conditions. Difficult to ascertain where and if contaminated stockpiles remain, could not locate any liner material under stockpiled soil. Could not locate former monitoring well. Lots of debris and large piles of soil on uneven terrain. |
Katrina Chambon |
5/2/2014 |
Update or Other Action |
The CSP spoke with the RP, Jalasko North LLC (JNL) this morning. JNL indicated that pending results of legal action involving the purchase agreement, the RP intends to continue cleanup. CSP requested an update in August 2014. |
Joshua Barsis |
1/14/2015 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77866 2,000 Gallon UST. |
Joshua Barsis |
2/4/2015 |
Document, Report, or Work plan Review - other |
Reviewed the Work Plan for Soil Stockpile and Monitoring Well Installation and Sampling, dated February 2, 2015. The ADEC does not object to the activities outlined in the work plan. Please see file for more information. |
Joshua Barsis |
4/1/2015 |
Document, Report, or Work plan Review - other |
Reviewed the Site Characterization report, dated March 2015. The report documented the collection of soil and groundwater samples from two soil borings that were also completed as groundwater monitoring wells. Soil samples were also collected from the four soil stockpiles on site. All soil and groundwater results were below ADEC cleanup levels. Groundwater monitoring wells still need to be decommissioned. |
Joshua Barsis |
4/2/2015 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77866 2,000 Gallon UST. |
Joshua Barsis |
4/23/2015 |
Document, Report, or Work plan Review - other |
Reviewed the Monitoring Well Decommissioning Report, dated April 22, 2015. All groundwater monitoring wells (3 total) were decommissioned by removed on April 14, 2015. |
Joshua Barsis |
4/30/2015 |
Cleanup Complete Determination Issued |
Cleanup determination |
Joshua Barsis |