Action Date |
Action |
Description |
DEC Staff |
11/7/1991 |
Site Added to Database |
|
Former Staff |
11/7/1991 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77707 ADD; |
Former Staff |
11/8/1991 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; :LCAU Date changed DB conversion |
Former Staff |
6/19/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; Site assessment report indicates that diesel fuel impacted soil and shallow ground water are present. Approximately 350 gallons of free product have been recovered by pumping water from beneath the building into an oil/water separator and discharging the water into the sanitary sewer (with approval from the City of Kodiak). Additional release investigation is work is on-going. Preliminary plans call for construction of a containment cell for bioremediation of the excavated soil. |
Former Staff |
7/2/1992 |
Update or Other Action |
NOR; Notice of Release letter sent on July 2, 1992. Corrective Action plan and report required. |
Former Staff |
11/13/1995 |
Update or Other Action |
A No further Action Request was received from New Horizons for the biovapor cell. Contamination remaining under the buildign was recommended to be left in place until building was demolished or removed. |
Donald Seagren |
1/25/1996 |
Leaking Underground Storage Tank Corrective Action Underway |
LCAR; Departmental staff reviewed a corrective action report and sampling plan for the removal of a regulated UST system. Contaminated soil and possibly GW was encountered. Staff also requested additional information from the consultant, as the file was incomplete. |
Former Staff |
5/9/1996 |
Underground Storage Tank Site Characterization or Assessment |
Additional information received from New Horizons in response to ADEC request for clarification of data in assessment report. |
Donald Seagren |
5/30/1996 |
Underground Storage Tank Site Characterization or Assessment |
Additional information received from New Horizons in responde to ADEC questions related to soil sampling depths and water handling and contaminant levels in the biovapor cell. |
Donald Seagren |
8/22/1996 |
Underground Storage Tank Site Characterization or Assessment |
Further clarification of field sampling drawings and testing and disposal of water form treatment cell received from New Horizons in response to ADEC questions. |
Donald Seagren |
12/13/1996 |
Institutional Control Record Established |
|
Former Staff |
12/13/1996 |
Conditional Closure Approved |
No additional assessment or cleanup activities are required at the former excavation at this time. Contaminated soil remaining under the building, exceeding ADEC cleanup levels, will be assessed and remediated when building is removed or a risk to human health or the environment becomes evident. The soils in the biocell need additional remediation prior to close out of the cell. |
Former Staff |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: ATT-ALASCOM INC ATTN: SAFETY SUPV |
Former Staff |
12/9/1997 |
Update or Other Action |
Thought sites were closed; Steve Hudson; 264-7868 |
Former Staff |
12/1/2004 |
Update or Other Action |
File number 2601.26.006 assigned and entered into the Fileroom Database and Leaking Underground Storage Tank database. |
Alyce Hughey |
12/29/2004 |
Update or Other Action |
Sent letter requesting status of soil bio piles constructed on site to remediate contaminated soil. Sampling plan to be submitted for approval if no sampling has been conducted since 1996. |
Donald Seagren |
2/17/2005 |
Document, Report, or Work plan Review - other |
Reviewed supplemental historic information supplied by consultant that was missing from ADEC files. Provided comments for development of work plan. |
Donald Seagren |
5/3/2005 |
Update or Other Action |
reviewed and commented on stockpile sampling plan |
Donald Seagren |
6/14/2005 |
Underground Storage Tank Site Characterization or Assessment |
Reviewed bio pile sampling report. All samples below applicable ADEC cleanup levels. Approval to decommission stockpile and dispose of liner in Kodiak landfill. Site will remain in NFRAP status due to contamination under building. |
Donald Seagren |
11/18/2005 |
Update or Other Action |
Received verification of the dismantling of the bio-cell and removal of the piping and liner. The piping and liner was disposed of in the Kodiak landfill. |
Donald Seagren |
11/21/2005 |
Update or Other Action |
Received the report on the closure of the biocell. The soil was remediated to levels below ADEC cleanup levels and landspread on site. The liner and piping was disposed of at the Kodiak Landfill. The bio-cell is considered closed. As was stated in the 13 December 96 NFRAP letter, contamination remains under the building exceeding cleanup levels that will require additional assessment &/or cleanup when it becomes accessible. |
Donald Seagren |
3/8/2007 |
Exposure Tracking Model Ranking |
|
Former Staff |
6/13/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
11/10/2011 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77707 UST removal and piping. |
Alyce Hughey |
11/10/2014 |
Update or Other Action |
Staff changed from Paul Horwath to IC Unit. |
Kristin Thompson |
8/14/2015 |
Institutional Control Compliance Review |
IC compliance review conducted. Schedule to send the responsible party an IC reminder letter. |
Evonne Reese |
8/18/2015 |
Institutional Control Update |
An IC reminder letter was issued to the responsible party on this date. |
Kristin Thompson |
7/24/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was e-mailed to the landowner. The next review will be in five years’ time. |
Gaige Robinson |