Site Report: ADOTPF - Chulitna Wayside

Site Name: ADOTPF - Chulitna Wayside
Address: MP 185.5; Parks Hwy, Cantwell, AK 99729
File Number: 150.26.031
Hazard ID: 23334
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 63.151518
Longitude: -149.410605
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Tank ID no. 1 Facility Phone is 768-2612; July 1998 Emcon oversaw the removal of one 500 gallon Diesel UST from this site. No groundwater or permafrost was encountered. The tank was in good condition with no visible holes, or cracks. Soil removed from the excavation was not visibly impacted however, PID reading from the screening samples ranged from 1.0 ppm to 1.7 ppm. Two samples were collected for laboratory analysis. Because no contamination was suspected, the excavated soils were put back in the hole. Analytical results for DRO, GRO, and BTEX were all non-detect.

Action Information

Action Date Action Description DEC Staff
1/11/1999 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 76173 Via Site Assessment 1/11/99 Former Staff
1/11/1999 Site Added to Database Former Staff
3/22/1999 Underground Storage Tank Site Characterization or Assessment Completed by Emcon during bulk tank removal project. Limited removal of soil during 500-gal diesel UST removal. Consultant recommends NFA. Former Staff
11/9/1999 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Review of report indicates that appropriate remedial activities were initiated. However, excavated soil placed into hole without testing - only screening was completed. Need to determine on what basis this decision was made. Former Staff
8/21/2002 Update or Other Action RECKEY has automatically been generated. Cynthia Pring-Ham
1/28/2004 Update or Other Action Transferred DEC staff lead from John Carnahan Cynthia Pring-Ham
4/20/2005 Update or Other Action Review of report does show that analytical samples taken from below the fill and vent ends of the tank were analyzed for DRO, GRO, and BTEX, all sample results were non-detect. Kim DeRuyter
5/16/2005 Site Closure Approved No Further Action status approved. Kim DeRuyter

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.