Action Date |
Action |
Description |
DEC Staff |
7/20/1988 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 78035 ADD; TCE contamination. |
Former Staff |
7/20/1988 |
Site Added to Database |
|
Former Staff |
9/1/1993 |
Update or Other Action |
FS; |
Former Staff |
10/23/2001 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Underground Storage Tank and Pipeline Monitoring Report (draft dated February 1999; ADEC comment letter dated May 14, 1999; review draft dated March 30, 2000; comment resolution meeting on April 11, 2000; final dated April 11, 2001 and received October 23, 2001). |
Gretchen Pikul |
12/18/2002 |
Leaking Underground Storage Tank Corrective Action Underway |
The Record of Decision for Final Remedial Action at Groundwater Zone OT028 (Zone 2), Waste Accumulation Area 3 (SS017), Eskimo Creek Dump (SS022), Refueler Shop (SS021), and Old Power Plant Building (SS020) was signed by ADEC on December 18, 2002. The selected final remedies include: monitored natural attenuation of the TCE, BTEX, and GRO plumes with annual sampling, institutional controls on drinking water wells, and a 5-year review for OT028; site closure for SS017; vegetative soil cap, annual long-term monitoring (LTM), institutional controls on excavations and other subsurface activities, and 5-year review for SS022; and transfer to UST compliance section for continued operation of bioventing systems since contamination is associated with former state-regulated USTs, annual LTM, institutional controls of excavations and other subsurface activities, 5-year review, and confirmation soil samples to obtain site closure for SS021 and SS020. The 350 determination has been granted for the A-Aquifer, with application of the 10x rule for soil and groundwater. This approval has been given for similar facility sites (Zones 1 and 4) in recent years and documented in final, signed RODs. |
Gretchen Pikul |
3/11/2003 |
Long Term Monitoring Established |
Technical Report Remediation Systems 2001 Operation, Monitoring and Maintenance Biovent and AS/SVE Systems at Six Remediation Sites final dated December 20, 2002 and received on March 11, 2003. Also, Remediation System Operation, Monitoring, and Maintenance Manual at Six Remediation Sites; final dated December 23, 2002 and received on March 11, 2003. |
Gretchen Pikul |
3/11/2003 |
Document, Report, or Work plan Review - other |
Remediation System Operation, Monitoring, and Maintenance Manual at Six Remediation Sites - draft dated February 22, 2002 and received March 21, 2002; ADEC comment letter dated April 15, 2002; final dated December 23, 2002 and received March 11, 2003. |
Gretchen Pikul |
3/11/2003 |
Document, Report, or Work plan Review - other |
Remediation System Operation, Monitoring, and Maintenance Manual at Six Remediation Sites - draft dated February 22, 2002 and received March 21, 2002; ADEC comment letter dated April 15, 2002; final dated December 23, 2002 and received March 11, 2003. |
Gretchen Pikul |
3/11/2003 |
Long Term Monitoring Established |
Technical Report – Remediation Systems 2001 Operation, Monitoring and Maintenance Biovent and AS/SVE Systems at Six Remediation Sites final dated December 20, 2002 and received on March 11, 2003. Also, Remediation System Operation, Monitoring, and Maintenance Manual at Six Remediation Sites; final dated December 23, 2002 and received on March 11, 2003. |
Gretchen Pikul |
10/1/2003 |
Long Term Monitoring Established |
Technical Report Remediation Systems 2002 Operation, Monitoring, and Maintenance Bioventing Systems at Six Remediation Sites (draft dated and received in August 2003; ADEC comment letter dated September 11, 2003; final dated and received October 1, 2003). |
Gretchen Pikul |
1/16/2004 |
Document, Report, or Work plan Review - other |
December 2003 Monthly Status Report for Bioventing Systems (electronic version dated and received on January 16, 2004). |
Gretchen Pikul |
2/4/2004 |
Update or Other Action |
Meeting on Air Force compliance projects and actions needed to gain closure, including biovent systems, former marina, and former POL pipeline. |
Gretchen Pikul |
2/27/2004 |
Document, Report, or Work plan Review - other |
February 2004 Monthly Status Report for Bioventing Systems (dated February 17, 2004 and received by ADEC via e-mail on February 27). |
Gretchen Pikul |
3/19/2004 |
Long Term Monitoring Established |
Technical Report Remediation Systems 2002 Operation, Monitoring, and Maintenance Bioventing Systems at Six Remediation Sites (draft dated and received in August 2003; ADEC comment letter dated September 11, 2003; final dated and received October 1, 2003). |
Gretchen Pikul |
4/1/2004 |
Document, Report, or Work plan Review - other |
Remediation Systems 2003 Operation, Monitoring and Maintenance at Six Remediation Sites Work Plan Addendum; 1st draft dated and received in July 2003; ADEC comment letter dated August 8, 2003; ADEC approval letter dated August 19, 2003; 2nd draft dated and received on January 9, 2004; ADEC comment letter dated February 13, 2004; Air Force Comment Response received March 31, 2004; and ADEC approval letter dated April 1, 2004. |
Gretchen Pikul |
6/18/2004 |
Document, Report, or Work plan Review - other |
May and June 2004 Monthly Status Reports for Bioventing Systems (dated and received on June 18, 2004). |
Gretchen Pikul |
8/9/2004 |
Document, Report, or Work plan Review - other |
2004 Work Plan Addendums: 2004 Remediation Systems Operation, Monitoring, and Maintenance at Seven Remediation Sites; draft dated July 30 and received on August 5, 2004; ADEC comment letter/conditional approval letter dated August 9, 2004; Air Force Comment Response received August 26 and ADEC sent e-mail on August 27 stating that Comment Response is acceptable and referred to ADEC conditional approval letter dated August 9, 2004. |
Gretchen Pikul |
2/2/2007 |
Update or Other Action |
File number issued 2569.38.022.05. File number references information post-December 2002. For information pre-December 2002, see 2569.38.016.05 in the CS database. |
Aggie Blandford |
10/17/2016 |
Document, Report, or Work plan Review - other |
ADEC provided comments on the "Closure Report for Nine Compliance Restoration Program Sites (TU/US-C519, TU/US-C517, TU/US-C518, TU/US-C520, TU/US-C522, TU/US-C523, TU/US-C524, TU/US-C589, TU/US-C592) at the King Salmon Divert". Site TU/US-C523 is included in the CS database as two individual sites, an active LUST site (Haz ID: 23354 “King Salmon Air Station SS21 Refueler Shop”) and a closed (Cleanup Complete) CSP site (Haz ID: 506 “King Salmon Air Station SS21”). Based on our research, this site is closed with Institutional Controls (ICs) (bioventing, land use controls, annual inspections, 5-year review) and was inaccurately closed without ICs in the database. Once this report is finalized, ADEC will close (Cleanup Complete) the LUST site and update the CSP site to closed (Cleanup Complete with ICs). IC documentation will be tracked in the CS database CSP site Haz ID: 2629 “King Salmon AS OT028 GW Zone 2”. |
Holly Weiss-Racine |
3/22/2017 |
Cleanup Complete Determination Issued |
Review of Closure Report for Nine Compliance Restoration Program Sites TU/US-C519, TU/US-C517, TU/US-C518, TU/USC520, TU/US-C522, TU/US-C523, TU/US-C524, TU/US-C589, and TU/US-C592 at King Salmon Divert received for review.
Staff commented and agreed that the site warrants cleanup complete without ICs for CS DB Hazard ID 23354 which will be administratively closed out. All follow-up monitoring and necessary remediation will be assigned to CS DB Hazard ID 506 aka King Salmon Air Station SS21. |
Louis Howard |