Site Report: Dresser Atlas-Mile 22.5 North Kenai Road

Site Name: Dresser Atlas-Mile 22.5 North Kenai Road
Address: 49160 Kenai Spur HighwayMile 22.5 North Kenai Rd, Nikiski, AK 99635
File Number: 2323.26.003
Hazard ID: 23436
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 60.691778
Longitude: -151.383102
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Fuel releases from an underground storage tank system probably occurred at he site sometime in the mid-1970s. Contamination associated with the fuel releases was reported in the on-site drinking water well in the mid-1980s. Site investigations confirmed that elevated hydrocarbon constituents were present in the soil and groundwater. Source of contamination was determined to be gasoline.

Action Information

Action Date Action Description DEC Staff
5/20/1986 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 76240 ADD; Former Staff
5/20/1986 Site Added to Database Former Staff
5/21/1986 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; :LCAU Date changed DB conversion Former Staff
7/1/1986 Underground Storage Tank Site Characterization or Assessment PA; Sometime in May 1986, employees of Dresser Atlas complained of a hydrocarbon odor and taste in the water supply. In July 1986, ADEC tested water which contained 2.6 ppb benzene. Former Staff
3/1/1988 Long Term Monitoring Established MS; Sometime in March 1988, ADEC retested Dresser Atlas well. Results showed 5 ppb benzene and 1 ppb xylenes. Former Staff
3/2/1988 Update or Other Action Paul Horwath sent a letter to Art Burdick informing him of the laboratory results from January 28, 1988. Benzene concentrations of 5 ppb and Xylene was detected at 1 ppb. Alyce Hughey
3/31/1988 Update or Other Action Paul Horwath sent a letter to Jesse Wade informing him of the laboratory results from Jan 28, 1988. Benzene concentrations of 5 ppb and Xylene was detected at 1 ppb. Alyce Hughey
11/1/1988 Underground Storage Tank Site Characterization or Assessment SA1R; SA1R Date changed DB conversion 1/11/11 Former Staff
11/1/1988 Site Visit FI; Woodward-Clyde installed two monitoring wells and 14 gas probes. Soil samples were analyzed by EPA 8020 and had total BTEX which ranged from 0.025 to 8.9 ppm. Total BTEX concentrations for the water samples were 1.9 and 52,300 ppb. Woodward-Clyde submitted a report in May 1989. Former Staff
6/15/1989 Update or Other Action Request for Proposal sent to install three additional monitoring wells. Alyce Hughey
7/1/1989 Site Visit FI; In July 1989, ADEC contracted Hart Crowser to further characterize the site. The investigation consisted of subsurface soil sampling, monitoring well installation, well point installation, well development, groundwater sampling, and a survey of well elevations. The report indicated a dissolved BTEX plume extending northwest from the pump island and USTs of the former service station. This was the suspected primary source of contamination. No measurable free product layer was present at the time of field work. Two of the four soil borings showed hydrocarbon contamination. For the soil samples, TPH ranged from 4.6 to 2730 ppm and total BTEX ranged from non-detectable to 90.4 ppm. Two of the six new monitoring wells showed contamination of 6400 and 8465 ppb total BTEX. Former Staff
7/1/1989 Release Investigation RELR; RELR Date changed DB conversion 1/11/11 Former Staff
4/27/1990 Update or Other Action Kevin O'Shea sent a follow up letter from phone conversation with Lanie Hughes, Kenai Peninsula Borough. Alyce Hughey
6/2/1990 Site Visit FI; Three additional monitoring wells were installed by Shannon & Wilson. These wells and previously installed wells were purged and sampled. Trace levels of BTEX were detected in each of the soil borings. Total BTEX ranged from non-detectable to 1.23 ppm. Four of the monitoring wells showed elevated levels of BTEX, which ranged from 655 to 14,472 ppb. Benzene levels ranged from 6.2 to 150 ppb. Two water samples showed 65 and 61 ppb lead. Former Staff
7/1/1991 Long Term Monitoring Established MS; Former Staff
3/23/1992 Update or Other Action Les Buchholz sent a letter to Kenai Peninsula Borough informing them that ADEC is planning to utilize Kenai Special Appropriation funds to initiate soil cleanup at Dresser Atlas. Alyce Hughey
4/1/1992 Update or Other Action PUBP; Former Staff
5/1/1992 Update or Other Action SLC; State Lead Cleanup Former Staff
8/13/1992 Update or Other Action Scott Rose sent a letter to RZA-AGRA with review comments from the Corrective Action Plan that was submitted by RZA AGRA, and requested a revised CAP and a detailed cost estimate. Alyce Hughey
9/8/1992 Leaking Underground Storage Tank Corrective Action Underway Brad Hahn sent a letter to MARTECH USA, Inc. with the OK to move forward with the CAP that was submitted by RZA AGRA, and the approval to order the necessary equipment for both a VES and ASP systems. Alyce Hughey
9/11/1992 Update or Other Action Monica English sent a Corrective Action Plan Review Letter to Martech USA, Inc., and approves the CAP and would like them to proceed with the proposed remedial actions. Alyce Hughey
11/9/1992 Update or Other Action Scott Rose sent a letter of response to MARTECH USA, Inc.'s letter dated November 5, 1992 which stated that Martech plans to have all instrumentation and equipment installed and on site by November 12, 1992 from the CAP. Alyce Hughey
1/6/1993 Update or Other Action Scott Rose sent a letter to Martech USA to have them coordinate the final hookup and installation of electricity at the Dresser Atlas site, and to notify Monica English one day in advance of the scheduled work so she can be on site. Alyce Hughey
6/30/1993 Update or Other Action SLSW; Former Staff
7/15/1993 Leaking Underground Storage Tank Corrective Action Underway LCAR; A monthly corrective action report was submitted for departmental review by a State Term contractor for the operation and effectiveness of a vapor extraction /air injection system. This system was installed to effect remediation of gasoline contamination to the soils and groundwater from a former gas station at this site. Former Staff
8/23/1993 Leaking Underground Storage Tank Corrective Action Underway LCAR; A monthly corrective action report was submitted for departmental review by a State Term contractor for the operation and effectiveness of a vapor extraction/air injection system. This system was installed to effect remediation of gasoline contamination to the soils and groundwater from a former gas station at this site. Former Staff
9/13/1993 Update or Other Action OSLP; Oversite was provided to the term contractor during the weekly measurement readings for the vapor extraction/air injection system. Former Staff
9/20/1993 Site Visit FI; Field inspection performed by ADEC starr to verify that the system was operational. Former Staff
9/20/1993 Leaking Underground Storage Tank Corrective Action Underway LCAR; A monthly corrective action report was submitted for departmental review by a State term contractor for the operation and effectiveness of a vapor extraction/air injection system. This system was installed to effect remediation of gasoline contamination to the soils and groundwater from a former gas station at this site. Former Staff
11/5/1993 Leaking Underground Storage Tank Corrective Action Underway LCAR; A weekly corrective action report was submitted for departmental review by a State term contractor for the operation and effectiveness of a vapor extraction/air injection system. This system was installed to effect remediation of gasoline contamination to the soils and groundwater from a former gas station at this site. Former Staff
11/5/1993 Update or Other Action OSLP; Oversight was provided to the term contractor during weekly measurement readings for the vapor extraction/air injection system. Former Staff
1/19/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The October monthly corrective action report was reviewed by ADEC staff. Comments and recommendations were provided to the consultant. Former Staff
1/20/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The December corrective action report was reviewed by ADEC staff. Comments and recommendations were provided to the consultant. Former Staff
3/16/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The January, February, and March monthly corrective action reports were reviewed by ADEC staff. Comments and recommendations were provided to the consultant. This information is being used to evaluate the feasibility of system shutdown. Former Staff
3/24/1994 Update or Other Action OSLP; Oversight was provided to this project in the form of a funding request for operation of a VE/AIS system. Former Staff
6/7/1994 Update or Other Action SLSW; Scope of work drafted to cover the replacement of one monitor well and one sparge well. Former Staff
6/8/1994 Update or Other Action OSLP; A funding request was generated to address anticipated expenditures for this project in FY 95. Former Staff
6/9/1994 Update or Other Action Brad Hahn sent a letter to Shannon & Wilson after reviewing a June 2, 1994 letter outlining proposed work, and authorized Shannon & Wilson to proceed. Alyce Hughey
6/9/1994 Site Visit RECN; Site recon performed to mark area for the location of replacement monitor and sparge wells. Former Staff
6/16/1994 Site Visit RECN; Recon performed to inspect the replacement of the monitor and sparge wells. Former Staff
7/13/1994 Update or Other Action OSLP; A bid solocitation was drafted for this project for maintenance and operation of the VEAIS system during the FY 95 season. Former Staff
7/14/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The April monthly corrective action report was reviewed by ADEC. This report evaluates the effectiveness of the VEAIS system for purposes of considering a time frame for system shut-down. Former Staff
7/19/1994 Site Visit FI; Field inspection performed by ADEC staff to verify that the VEAIS system was operational and functioning properly, as the system had shutting down on electrical power surges. Former Staff
7/22/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The May monthly corrective action report for the VEAIS system evaluation was reviewed by ADEC staff. Information in this report is being used to evaluate a time frame for system shutdown. Former Staff
8/22/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The June monthly corrective action report for the VEAIS system evaluation was reviewed by DEC staff. Information in the report is being used to evaluate a time frame for system shut down. Former Staff
8/23/1994 Site Visit FI; Inspection performed by DEC staff to verify that the VEAIS system was operational and functioning properly. Upon arrival at the site, it was noted that the system was inoperable. Both the vapor extraction and air injection systems were shut down. Former Staff
8/25/1994 Site Visit FI; FI by staff in an attempt to restart the VEAIS system. After checking the electrical boxes, it was determined that a breaker had been thrown. Breaker was reset and system startup was attempted. Could not get system operational. Will have to contact contractor and electrician to trouble shoot system. Former Staff
9/13/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The July monthly corrective action report for the VEAIS system evaluation was received by ADEC staff. Information in this report is being used to evaluate a time frame for system shutdown. Former Staff
10/3/1994 Leaking Underground Storage Tank Corrective Action Underway LCAR; The August and September corrective action reports for the VEAIS system evaluation were reviewed by staff. Information in these reports is used to evaluate a time frame for system shutdown. Former Staff
11/7/1994 Update or Other Action SLC; Oversight of State Lead Projects. Work invoices were reviewed and approved for the operation, repair, and analytical sampling conducted for this state lead project. Former Staff
2/14/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed the December monthly status report. This report details the groundwater sampling results and vapor extraction operation results. Information from this report is used to determine adequacy and status of remediation efforts. Former Staff
3/17/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed the January and February monthly status reports. These reports detail the groundwater sampling results and vapor extraction operation results. Information from this report is used to determine adequacy and status of remediation efforts. Operation of the VES was modified to increase efficiency of hydrocarbon vapor recovery. Former Staff
3/24/1995 Site Visit FI; Departmental staff travelled to the site to verify whether a power surge had caused the VES blower to shut down. Upon arrival at the site, the staff found that the blower was operational. Former Staff
4/21/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed the March weekly status reports. These reports detail the vapor extraction operation results. Information from this report is used to determine adequacy and status of remediation efforts. Operation of the VES was modified to increase efficiency of hydrocarbon vapor recovery. This project is being reviewed for possible closure (depending on funding availability, the system could operate for another year). Former Staff
5/21/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed the April weekly status reports. These reports detail the vapor extraction operation results. Information from this report is used to determine adequacy and status of remediation efforts. Operation of the VES was modified to increase efficiency of hydrocarbon vapor recovery. This project is being reviewed for possible closure (depending on funding availability, the system could operate for another year). Former Staff
6/8/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed the May monthly status report for the AI/VE system operation. Additional information was requested from the consultant for purposes of planning next fiscal year's budget. Former Staff
6/22/1995 Leaking Underground Storage Tank Emergency Response IA; Departmental staff drafted a funding request for FY96 to obtain funds to continue the cleanup of this site. Soil and groundwater contamination resulted from a former UST system. Former Staff
8/23/1995 Leaking Underground Storage Tank Corrective Action Underway LCAR; Departmental staff reviewed and provided comments on the monthly update for the VE/AI remediation system at this state lead cleanup. Former Staff
12/19/1995 Update or Other Action CAPR; Departmental staff reviewed and provided comments on the monthly update for the VE/AI remediation system at this state lead cleanup (Comments were made regarding the laboratory analysis utilized for the GW samples.). Former Staff
1/10/1996 Long Term Monitoring Established LTM; Departmental staff reviewed and provided comments on the monthly update for the VE/AI remediation system at this state lead cleanup. Departmental staff compared historical GW monitoring results with the latest water sample results. Trends in water quality are being reviewed. Former Staff
11/20/1997 Update or Other Action ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JESSE S. WADE Former Staff
2/12/2004 Update or Other Action Monica English sent a Request to Access Property to the Landowner Alyce Hughey
4/22/2004 Site Visit Staff visited the site to determine the status of the on-site remediation system and attempt to locate former monitor wells. Monica English
5/4/2004 Update or Other Action State's term contractor on-site to locate and sample existing monitor wells. Also evaluate existing remediation system and determine risks posed by remaining contamination. Monica English
7/1/2004 Document, Report, or Work plan Review - other Review and provide comments on Draft Groundwater Assessment report submitted by term contractor. Monica English
8/6/2004 Update or Other Action File number assigned and entered into the Fileroom DB and LUST DB. Alyce Hughey
3/31/2005 Update or Other Action The final version of the Groundwater Assessment Report for NTP 18-7000-21-25 is received. Monica English
7/15/2005 Update or Other Action Draft recommendation document for future plans for this project. Monica English
8/15/2005 Update or Other Action A Request for Proposal for State lead work is drafted for decommissioning the on-site treatment system and to replace two ground water monitoring wells. Monica English
9/26/2005 Update or Other Action Monica English sent a letter requesting access to the property from the Landowner, for purposes of dismantling and removing the on-site treatment system and to install two replacement monitor wells for the collection of ground water samples. Alyce Hughey
10/26/2005 Update or Other Action Decommissioning of the AS/SVE treatment system is conductec by the State's term contractor. Two additional monitoring wells are installed and the first round of water sampling is conducted. Monica English
11/29/2005 Update or Other Action The State's term contractor continues to decommission monitor wells no longer needed, collect the second set of samples for the two newly installed wells and survey all remaining wells in. Monica English
1/4/2006 Update or Other Action Using Figures 1 and 2 from a Soil and Groundwater Assessment Mile 22.5 North Kenai Road, from Shannon & Wilson, Dated September 1990, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerail Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum, NAD83. High degree of confidence in accuracy of location. Alyce Hughey
2/15/2006 Document, Report, or Work plan Review - other The Treatment System Decommissioning and Monitoring Well Installation and Sampling report is received and reviewed. Monica English
3/15/2006 Update or Other Action ADEC draft record of decision for No Further Remedial Action Planned document is generated and submitted for internal review. Monica English
4/5/2006 Conditional Closure Approved A Record of Decision document was issued for No Further Remedial Action Planned. Attached to this decision document was a Notice of Environmental Cleanup and Residual Soil and Groundwater Contamination. Monica English
4/5/2006 Institutional Control Record Established Former Staff
5/12/2006 Update or Other Action Landowner petitions the Division Director for an Informal Review of the department's Record of Decision. Monica English
6/1/2006 Update or Other Action After discussions with the landowner, ADEC issues an Amended Record of Decision to address the landowner's concerns. Monica English
10/9/2006 Update or Other Action Project manager changed from Monica English to Don Fritz, per Paul Horwath. Alyce Hughey
11/16/2011 Update or Other Action Site transferred from Don Fritz to Peter Campbell per Paul Horwath. Alyce Hughey
2/26/2016 Institutional Control Compliance Review IC compliance review conducted. Emailed former project manager, Paul Horwath, to locate a signed version of the amended record of decision. Reminder system set to follow-up with an IC reminder letter once that signed document is available. Kristin Thompson
3/17/2016 Institutional Control Update An IC reminder letter was issued to the responsible party on this date. Kristin Thompson
5/18/2016 Institutional Control Update There has been no response from the property owner with regards to the March 2016 IC reminder letter. Before issuing the letter, the property owner was verified with the Kenai Borough. The reminder system has been scheduled to follow up again in two years time. Evonne Reese
3/22/2017 Institutional Control Compliance Review IC compliance review conducted. Closure/IC Details updated. The reminder system is set to follow-up every two years. Kristin Thompson
3/8/2019 Institutional Control Update An Institutional Controls reminder letter was mailed to the landowner/responsible party on this date. Mossy Mead
10/9/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in two years’ time. Gaige Robinson

Contaminant Information

Name Level Description Media Comments
Benzene Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
Ethylbenzene Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
Benzene > Table C Groundwater
GRO > Table C Groundwater

Control Type

Type Details
CS Database Notation And Letter To Landowner/RP A Record of Decision document (No Further Remedial Action Planned) was issued.
Notice of Environmental Contamination A Notice of Environmental Contamination was issued with the NFRAP document.

Requirements

Description Details
Excavation / Soil Movement Restrictions Excavation activies are to be reported and ADEC approval obtained for areas of residual contamination. ADEC approval required prior to excavating in areas of residual contamiantion.
Advance approval required to transport soil or groundwater off-site. Standard condition.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) Standard condition.
Groundwater Use Restrictions No groundwater wells may be installed on this property without the review and approval of ADEC.
Maintenance / Inspection Of Engineering Controls The owner/operator of this property shall make a good faith effort to preserve the groundwater monitoring wells (MW-2, MW-4, MW-7, MW-9, MW-10, SPG-2, SPG-4, and 22.5-90-3) for future groundwater quality monitoring. In the event any monitoring wells are damaged, the property owner/operator shall, upon knowledge, notify ADEC promptly so that a timely determination can be made on the repair or replacement of any damaged wells.
Periodic Review Every two years.
Other The owner/operator of this property shall allow reasonable access to the property to ADEC (and its contractors) to perform contamination investigation, assessment, monitoring, and/or cleanup operations in response to residual soil and groundwater contamination. ADEC or its agents may periodically conduct groundwater sampling at this site. If ADEC determines that groundwater quality meets the applicable groundwater cleanup levels and no further groundwater monitoring is required, ADEC will decommission the remaining groundwater monitoring wells.