Action Date |
Action |
Description |
DEC Staff |
9/25/1990 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77769 ADD; |
Former Staff |
9/25/1990 |
Site Added to Database |
|
Former Staff |
9/26/1990 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; :Action Date changed DB conversion 1/11/11 |
Former Staff |
9/26/1990 |
Update or Other Action |
NOR; :Action Date changed DB conversion 1/11/11 |
Former Staff |
9/26/1990 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; :LCAU Date changed DB conversion |
Former Staff |
3/18/1992 |
Update or Other Action |
Monica English sent a Notice of Release Letter after reviewing the Phase I December 1991 UST Site Assessment Report, dated December 1991, from Northern Test Labs. |
Alyce Hughey |
8/13/1992 |
Update or Other Action |
Monica Englsih sent a letter requesting a Corrective Action Plan. |
Alyce Hughey |
5/11/1993 |
Document, Report, or Work plan Review - other |
Monica English sent a letter requesting a Corrective Actin Plan, and provided review comments after reviewing the Kenai Airport Fuel Service UST Removal & Site Assessment Work Plan,, from Northern Test Lab, dated September 23, 1992. |
Alyce Hughey |
10/19/1993 |
Leaking Underground Storage Tank Emergency Response |
SC; During the removal of UST's at this facility, free product was encountered on the groundwater and resulted in free product recovery. |
Former Staff |
10/20/1993 |
Site Visit |
RECN; FI conducted during UST removal. |
Former Staff |
11/12/1993 |
Site Visit |
FI; Site inspection conducted to inspect the stockpiling of the contaminated soils removed during the tank excavation. |
Former Staff |
7/18/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
CAPR; CAPR approved for the investigation of contaminated soils that were identified during tank removals at this facility. |
Former Staff |
7/19/1994 |
Update or Other Action |
Monica English sent an approval letter after reviewing the Request to Backfill UST Pit, dated July 18, 1994, from Rozak Engineering. |
Alyce Hughey |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: KENAI AIRPORT FUEL SERVICES INC |
Former Staff |
3/3/1999 |
Update or Other Action |
Colin Basye sent a follow up letter after a phone call with Ron Rozak from Rozak Engineering addressing the needs for the site to meet regulatory requirements. |
Alyce Hughey |
6/4/1999 |
Update or Other Action |
Colin Basye sent a letter after a meeting with Ron Rozak to address the remaining issues from a March 3, 1999 letter. |
Alyce Hughey |
8/31/1999 |
Underground Storage Tank Site Characterization or Assessment |
Interim Remedial Action Report submitted by Rozak Engineering. |
Monica English |
9/14/1999 |
Document, Report, or Work plan Review - other |
Stockpile Remedial Action Report by Rozak Engineering. |
Monica English |
9/28/1999 |
Underground Storage Tank Site Characterization or Assessment |
Interim Remedial Action Report #2 submitted by Rozak Engineering. |
Monica English |
10/25/1999 |
Document, Report, or Work plan Review - other |
Colin Basye sent a letter after reviewing the Stockpile Remedial Action Report and the Interim Remedial Action Report #2, from Rozak Engineering dated Aug 31, 1999 and Sept 14, 1999. |
Alyce Hughey |
12/16/1999 |
Update or Other Action |
Colin Basye sent a letter stating that the stockpiled soils were inadequately tested fro DRO. |
Alyce Hughey |
1/10/2000 |
Update or Other Action |
Colin Basye sent a letter of response after reviewing the Post-Remediation Sampling of Contaminated Soil from Rozak Engineering, dated December 29, 1999. |
Alyce Hughey |
5/5/2000 |
Update or Other Action |
Colin Basye sent an approval letter after reviewing the Porposed Plan fro DRO Sampling of Thermally Remediated soil, from Rozak Engineering, dated May 3, 2000. |
Alyce Hughey |
7/20/2000 |
Update or Other Action |
Colin Basye sent a letter that the Thermaly Processed soil could be closed out and no further action is required, after reviewing the DRO Sampling of Thermally Processed Soil from Rozak Engineering dated July 17, 2000. |
Alyce Hughey |
4/23/2001 |
Underground Storage Tank Site Characterization or Assessment |
Interim Remedial Action Report #3 submitted by Rozak Engineering. |
Monica English |
5/21/2001 |
Update or Other Action |
Met with Dan Pitts and Ron Rozak today regarding latest report. They want to develop a workplan for long term GW monitoring. |
Colin Basye |
5/25/2001 |
Update or Other Action |
Colin Basye sent a letter to follow up on a meeting. |
Alyce Hughey |
2/5/2002 |
Update or Other Action |
ADEC Conditional Approval for Interim Action Plan with Revision #1. |
Monica English |
4/11/2002 |
Update or Other Action |
Monica English sent a letter requesting the implamentation of the Corrective Action Plan and provide for the construction and operation of an Air Sparge trench and installation of a 10th monitor well fro the Interim Remedial Action Plan. |
Alyce Hughey |
5/6/2002 |
Update or Other Action |
Meeting in office with Dan Pitts, Dean Eichholz, Paul Horwath and Monica English. Discuss need for additional assessment and cleanup of soil and groundwater. Also mention FAP grant program. |
Monica English |
5/8/2002 |
Update or Other Action |
ADEC Conditional Approval of Interim Remedial Action Plan Revision #2 from Rozak Engineering, dated May 7, 2002. Approval to install an 11th monitoring well, and to excavate as much as possible below the water table without causing the slopes to slough. |
Monica English |
8/14/2002 |
Site Visit |
ADEC staff inspect evaporation treatment pond during period of heavy rain fall. |
Monica English |
8/23/2002 |
Underground Storage Tank Site Characterization or Assessment |
Interim Remedial Action Report #4 submitted by Rozak Engineering. |
Monica English |
10/4/2002 |
Document, Report, or Work plan Review - other |
Monica English sent a letter of response after reviewing the Kenai Airport Fuel Service Interim Remedial Action Report #4, from Rozak Engineering, dated Aug 23, 2002. The letter requested additional sampling from MW's due to the migration of contamination under the terminal building and to submit a corrective action plan. |
Alyce Hughey |
10/24/2002 |
Update or Other Action |
Monica English sent a letter approving an extention to submit a CAP, but didn't approve the extention of resampling of the monitoring wells. |
Alyce Hughey |
12/12/2002 |
Document, Report, or Work plan Review - other |
Interim Remedial Action Report #5. |
Monica English |
12/18/2002 |
Underground Storage Tank Site Characterization or Assessment |
Submittal of Interim Remedial Action Report #5 by Rozak Engineering. |
Monica English |
12/23/2002 |
Update or Other Action |
Remedial Action Workplan. |
Monica English |
1/23/2003 |
Update or Other Action |
ADEC comments to Remedial Action Workplan |
Monica English |
2/24/2003 |
Update or Other Action |
Consultant submitts additional information for the Remedial Action Workplan. |
Monica English |
3/4/2003 |
Update or Other Action |
ADEC approval for Remedial Action Workplan. |
Monica English |
7/27/2003 |
Update or Other Action |
Detailed Remedial Action Workplan review. |
Monica English |
7/30/2003 |
Update or Other Action |
ADEC approval of Detailed Remedial Action Workplan. |
Monica English |
10/28/2003 |
Update or Other Action |
Remedial Action - Project Status Inquiry by ADEC. |
Monica English |
11/21/2003 |
Document, Report, or Work plan Review - other |
Interim Remedial Action Report #6 for Detailed Work Plan. |
Monica English |
1/21/2004 |
Update or Other Action |
ADEC requests update on status of plan submittal for proposed treatment system. |
Monica English |
2/17/2004 |
Update or Other Action |
Remedial Action Work plan #2 |
Monica English |
3/18/2004 |
Update or Other Action |
Remedial Action Work Plan #2R (Revised) |
Monica English |
4/5/2004 |
Update or Other Action |
Additional information submitted by RP to support work plan. |
Monica English |
4/6/2004 |
Update or Other Action |
ADEC approval for SVE Pilot test study. |
Monica English |
5/6/2004 |
Document, Report, or Work plan Review - other |
Installation and Sampling of Groundwater Monitoring wells 12 and 13 - Interim Remedial Action Report #7 |
Monica English |
5/11/2004 |
Document, Report, or Work plan Review - other |
Soil Vapor Extraction Pilot Test Report. |
Monica English |
5/13/2004 |
Update or Other Action |
Site visit conducted to post Public Notice regarding proposed AS/SVE treatment system. Met with personnel of local business (AFN and Yukon Air) to discuss proposed remediation. |
Monica English |
5/19/2004 |
Update or Other Action |
Conditional Approval of Remedial Action Work Plan #2R(Revised). |
Monica English |
6/14/2004 |
Update or Other Action |
General email correspondence with RP regarding grant funding and cost recovery on site. |
Monica English |
7/7/2004 |
Site Visit |
Drive by site to see if AS/SVE system is operational. Note: discharge stack not at approved height. |
Monica English |
7/9/2004 |
Update or Other Action |
Contact consultant regarding remediaiton system. Request system status update and explanation of any deviations to approved plan. |
Monica English |
7/10/2004 |
Update or Other Action |
Consultant informs dept. that SVE system is running and being optimized. AS wells are plugged and need to be reworked due to lack of air flow. ADEC requests system installation/startup report. |
Monica English |
7/30/2004 |
Update or Other Action |
AS wells pulled and reslotted to attempt to improve air flow. Only the SVE portion of system operating. Exhaust stack adjusted to meet approved plan height. |
Monica English |
9/8/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and LUST DB. |
Alyce Hughey |
9/12/2004 |
Update or Other Action |
Consultant working on AS blower. Blower runs hot and continues to shut off. A timer was installed to get system operational until troubleshooting reveals problem. |
Monica English |
9/14/2004 |
Update or Other Action |
ADEC requests that the system installation and startup report be submitted for review. |
Monica English |
2/3/2005 |
Update or Other Action |
ADEC provides comments for the Remedial Action Report #1. Additional clarification is requested (response due 3-31-05). |
Monica English |
3/8/2005 |
Update or Other Action |
Monica English sent a letter requesting a response from her February 3, 2005 letter. |
Alyce Hughey |
2/14/2006 |
Update or Other Action |
Using Figrue 1-1 and 1-2 from a Remedial Action Work Plan, Kenai Airport Fuel Service, from Rozak Engineering, dated December 2002, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, TopoZone Pro Street Maps, Black and White Aerial Photo, on a Medium Size Map, View Scale 1:10,000, Coordinate Datum NAD83. High degree of confidence in accuracy of locaion. |
Alyce Hughey |
10/9/2006 |
Update or Other Action |
Project manager changed from Monica English to Don Fritz, per Paul Horwath. |
Alyce Hughey |
12/7/2006 |
Update or Other Action |
Letter sent to RP's requesting additional infromation regarding remedial activities. |
Don Fritz |
3/22/2007 |
Exposure Tracking Model Ranking |
Initial Site Ranking using the ETM |
Don Fritz |
7/14/2008 |
Document, Report, or Work plan Review - other |
Remedial action report received, submited by Mark Prieksat. The treatment system operated from April ot November, when it was shut down due to freeze up. |
Don Fritz |
11/16/2011 |
Update or Other Action |
Site transferred from Don Fritz to Peter Campbell per Paul Horwath. |
Alyce Hughey |
6/2/2016 |
Update or Other Action |
Letter to the responsible party requesting a site status report, groundwater monitoring update and work plan. |
Peter Campbell |