Action Date |
Action |
Description |
DEC Staff |
10/2/1990 |
Site Added to Database |
|
Former Staff |
10/2/1990 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77737 ADD; Petroleum contaminated soil. |
Former Staff |
10/2/1990 |
Underground Storage Tank Site Characterization or Assessment |
SA1; |
Former Staff |
11/13/1990 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; Requested additional work plan. |
Former Staff |
6/15/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1A; Reviewed/responded to a tank removal report, a phase 1 site assessment report, and release investigation report. Corrective Action Plan requested. |
Former Staff |
7/15/1992 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; LUST corrective action underway. |
Former Staff |
10/14/1992 |
Release Investigation |
RELR; Release investigation report indicates soil and groundwater contamination are present. Requested submittal of additional details on the assessment work and submittal of a corrective action plan. Additional groundwater monitoring data is needed to define the extent of contamination. |
Former Staff |
2/16/1993 |
Update or Other Action |
CORR; Letter acknowledged receipt of RZA's response to our 12/14/92 letter. It still appears some petroleum contaminated soil may have been used as backfill onsite. Again requested submittal of a corrective action plan by 2/26/93. As a follow-up Jack Mann sent in a letter, which we received on 2/25, requesting an indefinate extension for submittal of a CAP. |
Former Staff |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JACK MANN |
Former Staff |
11/26/1997 |
Update or Other Action |
May have different RP. Has letter saying the RP is Chevron.; Jack Mann; 486-5703 |
Former Staff |
11/14/2002 |
Long Term Monitoring Established |
Reviewed monitoring reports 2001 & 2002; discussed with previous project manager. Sent letter to all involved parties re: change of ADEC PM. |
Donald Seagren |
11/21/2002 |
Update or Other Action |
Review file/reports and develop project sumary/discussion points for upcoming teleconference. |
Donald Seagren |
12/5/2002 |
Update or Other Action |
Teleconference to discuss project status/direction. Chevron will monitor in December 02 and add another MW between MW3 & MW4. In the monitoirng report they will propose a future course of action to reach cleanup for the site. Discussed with sit eowner, Jack Mann. File review in prep for call. |
Donald Seagren |
5/13/2003 |
Long Term Monitoring Established |
Reviewed December 02 monitoring report. Sent e-mail requesting missing items Chevron committed to during 5 December 02 conference call. |
Donald Seagren |
5/20/2003 |
Long Term Monitoring Established |
Reviewed Fourth Quarter 02 monitoring report. Still have not received a response to missing items from action list. |
Donald Seagren |
8/26/2003 |
Long Term Monitoring Established |
Reviewed Long term monitoring report and MW5 installation report |
Donald Seagren |
9/16/2003 |
Update or Other Action |
Meeting with Chevron and consultant. GW monitoring will continue. Data will be analyzed after 4 quarters to determine best approach for site. Will submit request for ACL's under one of the current methodologies. IC's and LTM would be required as part of any ACL determination. |
Donald Seagren |
1/20/2004 |
Document, Report, or Work plan Review - other |
Reviewed 3rd quarter 2003 monitoring report. MW3 submerged due to rains. MW5 not purged and sheen noted. DRO only contaminant exceeding cleanup levels. |
Donald Seagren |
3/1/2004 |
Document, Report, or Work plan Review - other |
Reviewed 4th quarter 03 monitoring report |
Donald Seagren |
5/25/2004 |
Long Term Monitoring Established |
Reviewed March 04 monitoring report. Still have not received notification from Chevron re: change in project management. Sent e-mail to have samplers listed as qualified persons prior to next sampling event. |
Donald Seagren |
8/6/2004 |
Long Term Monitoring Established |
Reviewed monitoring report on 7 June 04 sampling event. MW3 under a large pool of water due to rain. This MW usually exceeds ADEC cleanup levels so missing the data will delay any management decision on the site. |
Donald Seagren |
11/19/2004 |
Long Term Monitoring Established |
Reviewed Third Quarter 04 monitoring report. No spearate phase hydrocarbons presnet in any wells.GW flow direction unchanged. MW3 exceed clenaup levels for DRO. All other wells and parameters (GRO, BTEX and MTBE) are below cleanup levels. Risk to human health and the environment unchanged. |
Donald Seagren |
12/3/2004 |
Update or Other Action |
File number 2601.26.012 assigned and entered into the Fileroom database and Leaking Underground Storage Tank database. |
Alyce Hughey |
1/28/2005 |
Update or Other Action |
Telephon ecall with Maurice Baron, SECOR. Need soil labe data for boring BH-14 to verify conditions in former UST ecxcavation site. Will then NFRAP site with annual LTM until MCLs are met. |
Donald Seagren |
2/4/2005 |
Document, Report, or Work plan Review - other |
Reviewed Fourth Quarter event of December 7, 2004. MW3 not sampled due to ice. MW5 not sampled due to insufficient water. No apparent change to risk to human health or the environment. When a switch is made to annual sampling, it will be suggested that the sampling be conducted during a period of annual high water so that all MWs may be sampled to provide useable data. |
Donald Seagren |
2/8/2005 |
Document, Report, or Work plan Review - other |
Reviewed missing Site Assessment & Well Replacement report dated 1 March 01. A question remained about possible contamination remainning in the former tank area. Soil boring (BH-14) was completed to approximately 12 below ground surface.Two soil samples exceeded ADEC soil cleanup for benzene. All other constituents were below ADEC cleanup levels. It should be noted that the rentacl center personnel use the unpaved area around BH-14 to wash down equipment. |
Donald Seagren |
2/8/2005 |
Conditional Closure Approved |
Reviewed reports and data. No apparent continuing contaminant source. Groundwater not used as a drinking water source. Risk to human health and the environment is low. City ordinance requiring use of City water system will serve as an institutional control. Annual long term monitoroing required until two consecutive sampling events have all contaminats below ADEC Table C cleanup levels. Discussed decision with property owner. |
Donald Seagren |
2/8/2005 |
Institutional Control Record Established |
|
Former Staff |
2/11/2005 |
Update or Other Action |
Telephon ecall with Jack Mann to discuss NFRAP. Mr. Mann will discuss this with his attorney prio r to giving final approval, as the landowner. Either he of his attorney will call back with any further questions. |
Donald Seagren |
10/25/2005 |
Update or Other Action |
Coordination with new project manager Bob Jackson of SECOR on project status. |
Donald Seagren |
3/13/2007 |
Exposure Tracking Model Ranking |
|
Former Staff |
4/4/2007 |
Document, Report, or Work plan Review - other |
Reviewed 06 annual monitoring report. All analytical results were belwo ADEC cleanup levels. No significant change to the risk to human health or the environment. Well re-development and repair to be conducted duirng 2007 |
Donald Seagren |
12/7/2007 |
Institutional Control Record Removed |
cleanup complete and site closure approved |
Donald Seagren |
12/7/2007 |
Long Term Monitoring Complete |
cleanup complete and site closure approved |
Donald Seagren |
12/7/2007 |
Site Closure Approved |
|
Former Staff |
12/7/2007 |
Document, Report, or Work plan Review - other |
Reviewed 07 monitoring report. All contaminants in all MWs were below the cleanup levels. This is the second consecutive event meeting cleanup criteria in all MWS. LTM may be terminated & site closed |
Donald Seagren |
3/6/2008 |
Update or Other Action |
Met with Chevron and consultant. MWs will be removed following ADEC procedures during the sommer of 2008. |
Donald Seagren |
4/15/2008 |
Update or Other Action |
approved monitoring well decommissioning work plan |
Donald Seagren |
6/13/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
6/16/2009 |
Document, Report, or Work plan Review - other |
Reviewed the Well Decommissioning Report, dated May 19, 2008, and received May 27, 2008 at the Soldotna ADEC office, and received from Conestoga-Rovers & Associates (CRA). CRA decommissioned groundwater monitoring wells MW-1, MW-2, MW-3, MW-4, and MW-5 on April 18, 2008 in accordance with ADEC Recommended Practices for Monitoring Well Design, Installation and Decommissioning. |
Paul Horwath |