Site Report: USCG Kodiak Coast Guard Support T2 Bldg
Site Name: | USCG Kodiak Coast Guard Support T2 Bldg |
---|---|
Address: | ; , Kodiak, AK 99619 |
File Number: | 2601.26.057 |
Hazard ID: | 23479 |
Status: | Cleanup Complete - Institutional Controls |
Staff: | Curtis Dunkin, 9072693053 curtis.dunkin@alaska.gov |
Latitude: | 57.789978 |
Longitude: | -152.407105 |
Horizontal Datum: | NAD27 |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Last staff assigned was Patrick-Riley, then Fritz.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
8/31/1991 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 76273 ADD; Site added to database. | Former Staff |
8/31/1991 | Site Added to Database | Former Staff | |
9/1/1991 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | LCAU; LUST corrective action underway. : LCAU date changed DB conversion | Former Staff |
2/28/1994 | Underground Storage Tank Site Characterization or Assessment | Characterization Study for the Nyman's Peninsula & Building T-2 Stockpiles submitted. | Donald Seagren |
12/28/1994 | Release Investigation | Final Report Building T-2 Limited Release Investigation submitted by USCG. | Donald Seagren |
4/21/1995 | Leaking Underground Storage Tank Corrective Action Underway | Corrective Action Plan for the T-2 Buliding Site at the Coast Guard Communications Station, Kodaik, AK submitted by USCG. | Donald Seagren |
8/17/1995 | Site Visit | FI; Site reconnaissance. | Former Staff |
9/17/1996 | Release Investigation | Phase II Release Investigation Report, Communication Station Kodiak submitted by USCG. | Donald Seagren |
12/16/1997 | Long Term Monitoring Established | May 1997 - T2 Annual Site Monitoring USCG Communication Station Kodiak report submitted. | Donald Seagren |
11/23/1998 | Long Term Monitoring Established | May 1998 T-2 Annual Site Monitoring USCG Communications Station Kodiak report submitted. | Donald Seagren |
6/5/2003 | Long Term Monitoring Established | Reviewed 24 April 03 GW monitoring report. Only 2 of 4 MWs sampled due to suspected ice plug and buckled casing. Results ND. MW's will be sampled again in Fall 03. | Donald Seagren |
3/1/2004 | Document, Report, or Work plan Review - other | Reviewed GWand biocell sampling report dated 2 February 04. GW all below Table C. A single soil sample exceed Table B1&B2. Plume is stable and natural attentuation will cleanup remaining contamination. Approval to abandon MW's and associated bioventing system. Site closure upon further soil sampling. | Donald Seagren |
3/1/2004 | Conditional Closure Approved | Plume is stable and no dowgradient GW contamination. Complete site closure upon additioanl soil sampling demonstrating that contaminant levels are below Table B1 & B2 cleanup levels. | Donald Seagren |
3/1/2004 | Institutional Control Record Established | Former Staff | |
12/22/2004 | Update or Other Action | File number 2601.26.057 assigned and entered into the Fileroom database and Leaking Underground Storage Tank database. | Alyce Hughey |
7/22/2020 | Meeting or Teleconference Held | ADEC participated in annual project prioritization meetings on July 21 and 22 with representatives from the US Coast Guard, the Environmental Protection Agency, and respective contracted project technical support and implementation teams. The purpose of the annual meetings are for stakeholders to provide respective site status updates, conduct technical planning and site prioritization, and scheduling for implementation of projects through the current and upcoming fiscal years. | Curtis Dunkin |
7/28/2021 | Document, Report, or Work plan Review - other | ADEC reviewed the draft 2021 Base Kodiak Monitoring Well Decommissioning Work Plan and submitted comments to the USCG. | Curtis Dunkin |
8/3/2021 | Site Visit | ADEC participated in annual project delivery team meetings at the USCG Base Kodiak with representatives from the USCG, EPA, and their respective contracted technical support representatives, and conducted site visits and inspections of the active USCG Kodiak sites. | Curtis Dunkin |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil |
Control Type
Type | Details |
---|---|
CS Database Notation And Letter To Landowner/RP | One area exceeding Method 2 cleanup levels for DRO. |
Requirements
Description | Details |
---|---|
Excavation / Soil Movement Restrictions |
No associated sites were found.