Skip to content Skip to content

Site Report: Palmer Correctional Facility Maintance Building

Site Name: Palmer Correctional Facility Maintance Building
Address: Mile 58 Rd.; Off mi. 57.9 Glenn Hwy., Sutton, AK 99674
File Number: 2245.26.020
Hazard ID: 23634
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 61.711111
Longitude: -148.883333
Horizontal Datum:NAD27

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

During the removal of two regulated underground storage tanks: Tank #2, also refered to as Tank #12, which was removed with approximately 8 cubic yards of contaminated soil was excavated and sent to the gravel pit and treated by landspreading with 2007 samples showing the soils have been remediated to below ADEC cleanup levels. Tank #4, also refered to as Tank #14 which was removed with approximately 10 cubic yards of contaminated soil was excavated and sent to the gravel pit and treated by landspreading with 2007 samples showing the soils have been remediated to below ADEC cleanup levels. Report covering tank removal is filed under the Palmer Correctional Facility Maintance Building, file number 2245.26.020. Report is the Shannon & Wilson Report, Underground Storage Tank Closure and Upgrade Assessment Palmer Correctional Facility , dated October 1996.

Action Information

Action Date Action Description DEC Staff
8/23/1996 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 77973 ADD; Diesel contamination. Former Staff
8/23/1996 Site Added to Database Former Staff
8/24/1996 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; Tank yank. : LCAU date changed DB conversion Former Staff
8/25/1996 Release Investigation Release investigation and cleanup activities take place at the same time. The extent of contaminated soil was removed (by excavation) and stockpiled on site. Eric Henry
3/21/1997 Underground Storage Tank Site Characterization or Assessment SA1A; Reviewed UST Closure Report. Based upon sample results, it appears that the soil contaminated above the acceptable 200kg/mg level for diesel, was excavated from the site. Therefore, no further assessment nor cleanup is required. However, the excavated soils, presently stored in an on-site cell, will still need to be treated. Former Staff
11/19/2004 Update or Other Action File number issued 2245.26.020 Aggie Blandford
10/5/2005 Update or Other Action Project manager changed from Eric Henry to Dave Pikul. Sarah Cunningham
4/15/2008 Exposure Tracking Model Ranking Intitial Ranking Complete for Source Area: 77973 (Autogenerated Action)
4/18/2008 Site Closure Approved Former Staff
6/17/2008 Update or Other Action Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. Alyce Hughey

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close