Skip to content Skip to content

Site Report: Hilcorp NS Pad 3 (East End) (former ARCO) (BPX)

Site Name: Hilcorp NS Pad 3 (East End) (former ARCO) (BPX)
Address: Eastern Operating Area, Prudhoe Bay Unit, Prudhoe Bay, AK 99734
File Number: 300.38.082
Hazard ID: 2367
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 70.239999
Longitude: -148.500923
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Hydrocarbon Contamination was discovered during routine gravel removal on July 31, 1994. Diesel odor was noted on gravel pad and tundra surface. Charter D.2 List. Samples collected by ARCO confirmed diesel range petroleum hydrocarbon contamination of the pad and tundra. A magnetometer survey is scheduled for 1994 field season.

Action Information

Action Date Action Description DEC Staff
10/9/1995 Site Added to Database DRO in gravel pad. Scott Rose
5/23/2005 Meeting or Teleconference Held Meeting to discuss site status & proposed sampling for 2005. Linda Nuechterlein
5/25/2005 Update or Other Action Approved use of "restricted-use" gravel as backfill for excavation on Pad 3,when decommissioning of East Pit. Linda Nuechterlein
3/15/2006 Site Characterization Report Approved BP submitted a combined Phase II SA and Corrective Action Report which describes site conditions discovered during the summer 2005 investigation and proposed activiites to be performed in response to the Phase II. Linda Nuechterlein
4/25/2006 Cleanup Plan Approved CAP approved for gravel pad excavation/removal and for transport of restricted-use gravel. See letter dated 4/25/06 for additional details. Linda Nuechterlein
2/23/2007 Exposure Tracking Model Ranking Baseline ranking completed. Linda Nuechterlein
4/12/2007 Update or Other Action On this date received the Pad 3 East End (Charter Site 16) Site Closure Report dated January 30, 2007. Linda Nuechterlein
4/12/2007 Update or Other Action CSM Scoping Form and CSM graphic completed/appproved. Consultant complete lab checklist which was 3rd party reviewed by ESI. Linda Nuechterlein
4/1/2008 Conditional Closure Approved The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) reviewed the environmental records associated with ARCO Pad 3 (East End). This site had been contaminated by the release of a hazardous substance; however, based on the information provided to date, ADEC has determined that no further remedial action is required, and that ARCO Pad 3 (East End) can be closed subject to the conditions outlined in the Record of Decision. The hazardous substance contamination has been adequately addressed and does not pose an unacceptable risk to human health or the environment. Bill O'Connell
4/1/2008 Institutional Control Record Established There is contamination remaining above established cleanup levels at ARCO Pad 3 (East End) but ADEC has determined there is no unacceptable risk to human health or the environment, and this site will be conditionally closed. This decision is subject to the following conditions: 1. A Notice of Environmental Contamination will be recorded on the ADEC database to document that there is residual contamination remaining on site above the most stringent ADEC cleanup levels; 2. Any proposal to transport soil off site requires ADEC approval in accordance with 18 AAC 75.370 (b) Bill O'Connell
4/3/2012 Institutional Control Compliance Review IC review conducted and staff name changed from Nuechterlein to IC Unit. Evonne Reese
11/5/2014 Update or Other Action Project manager name changed from IC Unit to Keather McLoone. Evonne Reese
9/28/2016 Update or Other Action At this time, the project manager chooses to retain management of this site which has institutional controls. IC Unit
8/5/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. Gaige Robinson

Contaminant Information

Name Level Description Media Comments
DRO > Method 1 (Arctic only) Soil

Control Type

Type Details
CS Database Notation And Letter To Landowner/RP

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close