Action Date |
Action |
Description |
DEC Staff |
6/4/1996 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76446 Petroleum contamination from leaking tanks. Also approved an impacted soil disposition request by Philip Environmental to transport and temporarily stockpile at ASR until DEC permit requirements are met. |
Lynne Bush |
6/4/1996 |
Site Added to Database |
|
Former Staff |
6/28/1996 |
Update or Other Action |
Approved another impacted soil disposition request by Philip Environmental to transport and temporarily stockpile at ASR until DEC permit requirements are met. |
Lynne Bush |
7/9/1996 |
Leaking Underground Storage Tank Corrective Action Underway |
Reviewed and approved a stockpile disposal plan. |
Former Staff |
7/9/1996 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LUST corrective action underway. |
Former Staff |
10/4/1996 |
Underground Storage Tank Site Characterization or Assessment |
Two USTs (1 diesel and 1 gasoline) pulled. Sheen observed on groundwater. 1997- 1 waste oil UST removed from the north side of the building. |
Eric Henry |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: Call Worthington Ford. |
Former Staff |
3/10/1999 |
Update or Other Action |
Courtesy Reminder of Tank(s) Requiring a Post Closure Notice send to Cal Worthington for Tank ID 003, 1,000 gallon Used Oil tank. Our records indicate that the department has not received a Post Closure Notice for the subject UST. |
David Allen |
6/18/1999 |
Update or Other Action |
Tim Stevens received a Philip Services Corp "Used Oil Removal and Closure at the Cal Worthington Ford Facility at 1950 Gambell Street, Anchorage, Alaska" report, dated 6/14/99, signed by Timothy Shaw. A duplicate copy of the same report was dated and received 7/7/99, signed by Heather Hammond. |
Bill Petrik |
10/12/1999 |
Document, Report, or Work plan Review - other |
Lynne Bush reviewed the Philip Services Corp. report "Review of Used Oil UST Removal information, Cal Worthington Ford", dated and received by the department 7/7/99. According to the report, the closure activities were not performed in accordance with regulations. It will be necessary to perform another closure assessment. |
Bill Petrik |
4/26/2001 |
Update or Other Action |
Letter to Stan Petito to ask for release investigations of all three tanks by 5/31/01. |
Lynne Bush |
5/9/2001 |
Update or Other Action |
Stan Petito called Robert Weimer to check on site status. We discussed the 4/26/01 DEC letter about the need for a consulting firm and schedule by 5/31/01. Then a work plan needed by 8/3/01. We also discussed the 10/4/96 Philip Environmental report, "Underground Storage Tank Closure and Site Assessment Report for Cal Worthington Ford Gasoline and Diesel Fuel USTs in Anchorage, Alaska" that indentified benzene soil and ground water contamination at gas/diesel tanks, the need of a release investigation to define the extent of the soil and groundwater (monitoring wells) contamination. Also discussed the fact that the waste oil tank site assessment was incomplete and needs follow up work. |
Bill Petrik |
8/9/2001 |
Update or Other Action |
Letter. |
Lynne Bush |
9/10/2001 |
Update or Other Action |
The department received the AGVIQ Environmental Services "Final Work Plan for Release Investigation of Former UST Locations", dated September 2001 for Cal Worthington Ford. |
Bill Petrik |
10/16/2001 |
Document, Report, or Work plan Review - other |
Lynne Bush approved the "Final Work Plan for Release Investigation of Former UST Locations, September 2001", dated and received by the department 9/16/01. |
Bill Petrik |
11/26/2001 |
Update or Other Action |
Approval to transport 19 drums containing petroleum-contaminated soil to ASR (drummed soil from earlier excavation). ASR received the drums on 11/30/01. On 6/1/02 thermal treatment of the soil was completed at ASR's Ship Creek Facility. |
Lynne Bush |
12/21/2001 |
Update or Other Action |
Project Manager changed from Bush to Sundet. |
Lynne Bush |
1/9/2002 |
Update or Other Action |
The department received the AGVIQ Environmental Services "Draft Release Investigation of Former UST Locations", dated January 2002 for Cal Worthington Ford. |
Bill Petrik |
3/5/2002 |
Update or Other Action |
CS staff provided email comments on the draft Release Investigation of Former UST Locations for the Cal Worthington Site, File L55.227; Event ID 464; Facility ID 1326", dated January 2002, and received by DEC on 1/9/02. |
Rich Sundet |
5/31/2002 |
Update or Other Action |
Site transferred to DEC staff Amanda Dreyer. |
Robert Weimer |
6/6/2002 |
Long Term Monitoring Established |
Sent a letter titled "Request for a Release Investigation Work Plan and Quarterly Monitoring, Cal Worthington Ford, 1950 Gambell Street" for both site 1 and 2. |
Amanda Dreyer |
6/25/2002 |
Update or Other Action |
Meeting on what sampling needs to be performed during release investigation of the site. |
Amanda Dreyer |
6/26/2002 |
Update or Other Action |
Letter sent requesting a Release Investigation Work Plan and quarterly ground water monitoring. The letter mentions what was discussed at the meeting and what sampling should be included in the work plan. Also received an email from Edward Weiss, ADF&G, indicating that Chester Creek is an anadromous stream populated with Coho and Pink Salmon, and Dolly Varden in addition to resident fish. |
Amanda Dreyer |
7/11/2002 |
Update or Other Action |
The department received the AGVIQ Environmental Services "Release Investigation of Former UST Locations, Supplemental Information, Cal Worthington Ford, Anchorage, Alaska", dated 7/9/02. |
Bill Petrik |
8/1/2002 |
Update or Other Action |
The department received the AGVIQ Environmental Services "Draft Release Investigation Work Plan, Cal Worthington Ford, Anchorage, Alaska", dated 7/30/02, on 8/31/02. Amanda Dreyer reviewed the draft workplan and had no comments. She requested submittal of the Final Release Investigation Work Plan. |
Bill Petrik |
8/20/2002 |
Update or Other Action |
The department received the AGVIQ Environmental Services "Final Release Investigation Work Plan" for Cal Worthington Ford, 1950 Gambell Street, Anchorage, Alaska", dated August 2002 on 8/6/02. The department approves the work plan with the stipulation that further SVOC and VOC sampling at Site 2 occurs. |
Amanda Dreyer |
8/26/2002 |
Update or Other Action |
Letter of approval as submitted for the AGVIQ Environmental Services "Final Release Investigation Work Plan" dated 8/20/02, with no further SVOC and VOC sampling needed. |
Amanda Dreyer |
9/4/2002 |
Release Investigation |
Amanda Dreyer reviewed the AGVIQ Environmental Services "Final Release Investigation of Former UST Locations, 1950 Gambell Street, Anchorage, Alaska" dated May 2002. The department sent a letter approving the report. |
Bill Petrik |
12/12/2002 |
Release Investigation |
Amanda Dreyer reviewed the AGVIQ Environmental Services "Subsurface Investigation of Former UST Locations, Cal Worthington Ford, 1950 Gambell Street, Anchorage, Alaska" dated November 2002, received by the department 12/3/02. The department sent a letter approving the report and requested continued quarterly ground water monitoring and surveying of monitoring wells to determine the direction of groundwater flow through triangulation. Sample MW UST Site #1 MW 1, 2, and 3) for BTEX and UST Site #2 (MW1) be sampled for dissolved metals (damium, chromium, and lead). |
Bill Petrik |
2/13/2003 |
Document, Report, or Work plan Review - other |
Reviewed the AGVIQ Environmental Services "Quarterly Groundwater Monitoring Results" report, dated January 2003, received by DEC on 2/13/03. After review, it is unknown if contamination in the groundwater exists during high groundwater levels. DEC requested that the monitoring wells continued to be sampled quarterly until they have been sampled for a full year. |
Amanda Dreyer |
3/7/2003 |
Document, Report, or Work plan Review - other |
Received the AGVIQ Environmental Services "Quarterly Groundwater Monitoring, January 2003" report, dated February 2003. |
Amanda Dreyer |
3/20/2003 |
Update or Other Action |
Reviewed the AGVIQ Environmental Services "Quarterly Groundwater Monitoring Results" report, dated February 2003, received by DEC on 3/7/03. After review, it is unknown if contamination in the groundwater exists during high groundwater levels. DEC requested that the monitoring wells continued to be sampled quarterly until they have been sampled for a full year. DEC also requested that confirmation soil sampling be completed at the two sites to ensure they have reached the department's soil cleanup level.. |
Amanda Dreyer |
7/7/2003 |
Update or Other Action |
Received the AGVIQ Environmental Services "Quarterly Groundwater Monitoring, April 2003" report, dated July 2003. |
Amanda Dreyer |
7/8/2003 |
Update or Other Action |
Reviewed the AGVIQ Environmental Services "Quarterly Groundwater Monitoring, April 2003" report, dated July 2003. Benzene levels are still above cleanup levels for site 1. Site 2 was contaminated during the 11/02 quarterly sampling event. DEC requests continued quarterly sampling for Site 1 and Site 2. |
Amanda Dreyer |
9/3/2003 |
Update or Other Action |
Via a series of emails with Bruce Beck of AGVIQ, Amanda Dreyer suggested placing ORC socks in the monitoring wells this month after the September monitoring event and then sample again in July 2004 in order to allow the socks six months lead time to begin working. |
Bill Petrik |
9/23/2003 |
Update or Other Action |
Notice of Cost Recovery sent to Cal Worthington Ford representative Stan Petitio. |
Bill Petrik |
11/21/2003 |
Update or Other Action |
A copy of a memo from Kay Rawlings of the D.O.T. to Lori Barnett dated 11/20/03 was received by the department indicating that a check was received from the RP for Cost Recovery purposes. |
Bill Petrik |
12/29/2003 |
Update or Other Action |
Received the AGVIQ Environmental Services "Quarterly Groundwater Monitoring, September 2003" report, dated December 2003, received by the department 12/29/03. |
Bill Petrik |
10/11/2004 |
Update or Other Action |
Received the AGVIQ Environmental Services "Quarterly Groundwater Monitoring, August 2004" report, dated October 2004, received by the department 10/25/04. |
Eric Henry |
11/8/2004 |
Institutional Control Record Established |
ADEC recognizes that the source areas of contamination have been removed from the site but there is residual contamination remaining. An institutional control (IC) in the form of a database entry will be placed in the Contaminated Sites database to document that groundwater contamination remains at the site above applicable cleanup levels. |
Eric Henry |
11/8/2004 |
Conditional Closure Approved |
Fall 2004 report verifies a decreasing trend exists for benzene in groundwater (GW) at site #1 and soil is below cleanup levels. Site #2 has metals in soil above cleanup levels but they are consistent with levels that are naturally occurring in this area. Dissolved metals are below cleanup levels at site #2. The information provided to date indicates that soil contamination above 18 AAC 75.341 Method 2 (migration to GW) cleanup levels is still present and there are low levels of benzene detected in the GW above the 18 AAC 75.345 Table C cleanup levels. The benzene (in UST #1) and arsenic and chromium (in UST #2) remain in soil at levels above the established cleanup levels for this site. The arsenic and chromium concentrations are within background levels typically found in the Anchorage region according to the U.S. Geological Survey (1988). The GW data indicates benzene is stable or decreasing in concentration. ADEC recognizes that the source areas of contamination have been removed from the site but there is residual contamination remaining. The migration to GW pathway may be exceeded but the low level impacts to GW are expected to naturally attenuate over time. The shallow GW at this site has been impacted but isn't considered a drinking water source. The no further remedial action decision for this site is subject to the following conditions:
1. The GW shall be monitored on an annual basis from UST Site #1 for BTEX compounds. The sampling shall occur in the fall (e.g. September) and continue until 18 AAC 75.345 Table C cleanup levels are consistently achieved for all compounds. The sampling shall to be performed in accordance to the Final Release Investigation Workplan that was approved by ADEC on August 26, 2002.
2. The transport, treatment and/or disposal of soil and GW from the site requires prior ADEC approval in accordance with 18 AAC 78.600(h).
3. Any proposal to install a groundwater well at this site requires approval from DEC. |
Eric Henry |
10/4/2005 |
Update or Other Action |
Project Manager changed from Eric Henry to Bill Petrik. |
Sarah Cunningham |
1/19/2006 |
Update or Other Action |
Used TopoZone Pro, Anchorage Area Atlas, and site map to update erroneous latitude and longitude. Added legal property description. Used web and file map resources. Coordinates in decimal degrees and degrees, minutes, and seconds obtained using TopoZone Pro Large Map at 1:3,333 Scale, NAD 83, on a Hi-Res Urban Aerial photo. Very high degree of confidence in the accuracy of the coordinates. Coordinates are for UST Site #1. |
Bill Petrik |
3/16/2007 |
Update or Other Action |
Read and filed a copy of a cc'd letter to Lori Barnett from Pam Post, Department of Law (DOL), dated 3/14/07 indicating that the DOL received a cost recovery check from the RP for the cost recovery period of 8/1/03 to 1/31/06. |
Bill Petrik |
8/13/2007 |
Update or Other Action |
On this date the CSP received a letter addressed to Lori Barnett from Pam Post of the D.O.L. dated 8/7/07 indicating that a cost recovery check was received for the time period 4/16/07 to 4/30/07. |
Bill Petrik |
1/4/2008 |
Update or Other Action |
On this date the CSP received a letter addressed to Devra Hayes from Pam Post of the D.O.L. dated 12/31/07 indicating that a cost recovery check was received for the time period 10/1/07 to 10/15/07. |
Bill Petrik |
3/10/2008 |
Update or Other Action |
Sent a reminder letter to the RP regarding the required groundwater monitoring at this site. We have not received any groundwater monitoring reports since the site was conditionally closed in 2004. |
Evonne Reese |
2/16/2012 |
Update or Other Action |
Staff changed from Bill Petrik to IC Unit. |
Kristin Thompson |
7/9/2013 |
Institutional Control Compliance Review |
IC compliance review conducted. Reinvestigate the 2004 closure requirement of additional groundwater monitoring has never been done with the updated 2009 closure policy in mind. Removed groundwater monitoring requirement due to the amount of time since closure and that the contaminant concentrations in the groundwater in 2004 were barely above the Table C Groundwater cleanup levels. |
Evonne Reese |
12/9/2015 |
Institutional Control Compliance Review |
IC compliance review conducted, scheduled to send an IC reminder letter to the current property owner in the near future, and also scheduled periodic reviews every three years. |
Evonne Reese |
12/11/2015 |
Institutional Control Update |
An IC reminder letter was issued to the responsible party on this date. |
Kristin Thompson |
6/21/2018 |
Institutional Control Compliance Review |
IC compliance review conducted. Closure/IC Details updated. ICs Verification letter issued. Reminder system set for next follow-up in 2021. |
Kristin Thompson |
2/23/2023 |
Institutional Control Compliance Review |
IC compliance review conducted on this date and a reminder letter was issued. The next compliance review will be in 2026. |
Jennifer McGrath |