Action Date |
Action |
Description |
DEC Staff |
6/23/1989 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76474 Assessment by owner incomplete. DEC is awaiting a work plan from the owner's consultant to further assess and cleanup the site |
Former Staff |
6/23/1989 |
Site Added to Database |
|
Former Staff |
6/24/1989 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; :Action Date changed DB conversion 1/11/11 |
Former Staff |
6/24/1989 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; :LCAU Date changed DB conversion |
Former Staff |
6/25/1989 |
Release Investigation |
RELR; :Action Date changed DB conversion 1/11/11 |
Former Staff |
8/3/1989 |
Underground Storage Tank Site Characterization or Assessment |
Paul Horwath sent a second letter requesting an assessment of the extent of contamination be submitted to the department for review. |
Alyce Hughey |
8/25/1989 |
Document, Report, or Work plan Review - other |
Paul Horwath sent a review comments letter after reviewing the Inventory of Water Well from Northern Test Lab, and the Work Plan from Chumley's, Inc. |
Alyce Hughey |
9/8/1989 |
Update or Other Action |
Paul Horwath sent a letter of response after receiving the letter of cleanup activities from Colette G. Thompson. |
Alyce Hughey |
9/14/1989 |
Leaking Underground Storage Tank Corrective Action Underway |
RAPR; A sampling plan for sampling adjacent water wells was prepared by NTL and submitted on 9/14/89. Approval given by P. Horwath on 9/14/89. |
Former Staff |
10/9/1989 |
Leaking Underground Storage Tank Corrective Action Underway |
Paul Horwath sent a letter of response after receiving the Oil Spill Corrective Action from Northern Test Lab, dated Oct. 4, 1989 that requested the excavation be filled due to the possibility of structural damage. |
Alyce Hughey |
11/9/1989 |
Update or Other Action |
Paul Horwath sent a Memorandum requesting the site be a State Lead site. |
Alyce Hughey |
3/5/1990 |
Leaking Underground Storage Tank Corrective Action Underway |
RAPR; Draft assessment work plans submitted by D. Johnson Engineering on 3/5/90. |
Former Staff |
10/20/1990 |
Long Term Monitoring Established |
MS; Four soil samples collected from the excavation and submitted for analyses. Two of the four water wells requested to be sampled were sampled. Results faxed to DEC ond 1/5/90 and indicated no contamination in the excavation or adjacent water wells. |
Former Staff |
11/3/1990 |
Site Visit |
FI; Site visit by P. Horwath and M. English disclosed improperly stored stockpiled soils. |
Former Staff |
11/21/1991 |
Leaking Underground Storage Tank Corrective Action Underway |
Don Fritz sent a letter requesting a corrective action plan be submitted for further assessment activities. |
Alyce Hughey |
2/10/1992 |
Leaking Underground Storage Tank Corrective Action Underway |
Don Fritz sent a conditional Work Plan Approval letter after reviewing the Corrective Action Plan from Rozak Engineering dated January 15, 1992. |
Alyce Hughey |
1/1/1993 |
Update or Other Action |
ormerly assigned to Fritz until 7/1/93. Last staff assigned was Fritz. |
David Allen |
6/4/1993 |
Update or Other Action |
CAPR; ADEC issued a letter to the RP's attorney permitting the landspreading of stockpiled contaminated soils. Additional monitor well sampling was also required prior to considering the site for closure. |
Former Staff |
6/18/1993 |
Underground Storage Tank Site Characterization or Assessment |
Don Fritz sent a review comments letter after reviewing the Site Assessment Report, from Rozak Engineering, dated June 3, 1993. |
Alyce Hughey |
1/12/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
LCAR; On September 17, 1993, additional site assessment (post corrective action) information was received. The review of the report was completed on 1/12/94. |
Former Staff |
1/12/1994 |
Update or Other Action |
CAPR; Review of a corrective action plan for additional site activities was completed on 1/12/94. |
Former Staff |
2/14/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
LCAR; Based on information submitted, no further corrective action will be required, absent decommissioning the monitor wells. |
Former Staff |
5/19/1994 |
Long Term Monitoring Complete |
Entered by E. Reese 1/23/06 |
Evonne Reese |
5/19/1994 |
Site Closure Approved |
CLOS; NFA letter sent. |
Former Staff |
10/19/2004 |
Update or Other Action |
File number 2333.26.042 assigned and entered into the Fileroom DB and LUST DB. |
Alyce Hughey |
11/2/2006 |
Update or Other Action |
Using the Vicinity Map from the Site Assessment Report, from Rozak Engineering, dated June 3, 1993, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes No Topo Basemap, Black and White Aerial Photo, TopoZone Pro Street Maps, on a Medium Size Map, View Scale 1:9,840, Coordinate Datum NAD83. High degree of confidence in accuracy of location. |
Alyce Hughey |