Site Report: Peninsula Automotive-Naknek

Site Name: Peninsula Automotive-Naknek
Address: Mi. 1, AK. Peninsula Hwy.; , Naknek, AK 99633
File Number: 2616.26.008
Hazard ID: 23771
Status: Active
Staff: Dawn Wilburn, 9072628200 dawn.wilburn@alaska.gov
Latitude: 58.729081
Longitude: -157.005087
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Contaminated soils were encountered during the removal of 1,000-gallon and 3,000-gallon regulated underground storage tanks (USTs). Approximately 20 cubic yards of contaminated soil was excavated. Analytical results verified that diesel range organics, gasoline range organics, and benzene, toluene, ethylbenzene, and xylenes (BTEX) levels exceeded site cleanup levels for soil. Contaminated soils also remain in place. In 2022, soil borings and monitoring wells were advanced to characterize the soil contamination in the area of the former USTs. Analytical samples results indicated that contamination was not migrating and contaminant concentrations were below cleanup levels in the groundwater. In 2024, an additional soil investigation was conducted in the fuel dispenser area and groundwater was sampled again. Analytical soil samples collected from test pits confirmed contamination was present at approximately 9-10 feet below ground surface, but the contamination plume appeared stable. The groundwater analytical results were below cleanup levels. Petroleum contamination remains in the subsurface soils above the DEC human health, ingestion, and/or inhalations exposure pathway cleanup levels. Groundwater contamination has not been documented above DEC cleanup levels.

Action Information

Action Date Action Description DEC Staff
11/6/1996 Site Added to Database Former Staff
11/6/1996 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Former Staff
11/6/1996 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 77731 ADD; Petroleum contaminated soil. Former Staff
12/11/1996 Update or Other Action RPL3; A Notice of Release letter was sent to the RP of this facility. Contaminated soil was encountered during tank closure activities. Former Staff
12/23/1996 Update or Other Action UPD; Departmental staff requested a Corrective Action plan for contaminated soil encountered during the removal of an underground storage tank system at this facility. Former Staff
12/23/1996 Leaking Underground Storage Tank Corrective Action Underway CAPA; Staff provided comments on the Permanent Closure report. Former Staff
5/22/1997 Update or Other Action ADEC approval granted to landfarm approx. 25 cy of contaminated soil. Review being conducted on proposal for natural attenuation of in-situ contaminated soil. Monica English
11/20/1997 Update or Other Action ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: GARY D. BRADFORD Former Staff
12/10/2004 Update or Other Action File number 2616.26.008 assigned and entered into the Fileroom database and Leaking Underground Storage Tank database. Alyce Hughey
5/11/2005 Update or Other Action Letter sent to RP requesting status update on project and a CAP to further characterize the extent of contamination from the former underground storage tank system. Monica English
10/9/2006 Update or Other Action Project manager changed from Monica English to Don Seagren, per Paul Horwath. Alyce Hughey
11/17/2006 Update or Other Action Reviewed file. Sent letter requesting project status update. Donald Seagren
6/17/2008 Update or Other Action Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. Alyce Hughey
1/23/2020 Workplan Requested Workplan request letter sent to RP. Jessica Hall
1/23/2020 Potentially Responsible Party/State Interest Letter PRP letter sent. Jessica Hall
1/31/2020 Update or Other Action Received a phone call from Matt Bradford (Gray Bradford's son). He is helping his father navigate going forward the process in sending ADEC any past data reports related to this site and is looking at environmental companies to prepare a work plan to start characterizing the site. Jessica Hall
2/3/2020 Update or Other Action Spoke with Regina Woods regarding site history. She will be assisting the RP with creating a work plan. ADEC emailed her a copy of the work plan request letter, date January 23, 2020 and the public contaminated sites website link. Jessica Hall
3/3/2020 Document, Report, or Work plan Review - other Sent ADEC comments on Work Plan dated February 28, 2020 to RP. Jessica Hall
4/23/2020 Document, Report, or Work plan Review - other Sent RP ADEC Comments on the Site Characterization Work Plan dated April 1 2020, prepared by Platt Environmental Inc. Jessica Hall
5/14/2020 Document, Report, or Work plan Review - other Reviewed work plan received on May 4, 2020 and sent comment letter to the RP. Field work planned to start in September 2020. Jessica Hall
5/19/2020 Site Characterization Workplan Approved Sent RP Conditional Approval Letter for Work Plan received by ADEC on May 4, 2020. Jessica Hall
9/26/2020 Update or Other Action Sent Matthew Bradford and Regina Woods a status update request via email. Jessica Hall
9/28/2020 Update or Other Action Field work is postponed per Regina Woods. This has been postponed due to Covid.The Naknek area is still experiencing several positive cases. They are going to wait til the virus blew over. -via email Jessica Hall
9/29/2020 Update or Other Action Matt Bradford(on behalf of Gary Bradford) emailed to notify ADEC, the field work has not been completed or scheduled. Due to the COVID-19 pandemic and the risk associated with infecting the community, the contractors, and Platt Environmental employees during the work, travel, hotel stays, etc., Gary Bradford is requesting an extension until September of 2021. COVID-19 community spread surfaced in Naknek and surrounding areas the first part of this month. Hopefully by the fall of 2021, a COVID-19 vaccine will be available to everyone. ADEC has granted an extension. Jessica Hall
8/2/2021 Update or Other Action Requested site update from the RP. Discovery Drilling and Platt Environmental are scheduled to start field work August 30, 2021. Jessica Hall
8/19/2021 Update or Other Action Discovery Drilling and Platt Environmental field work pushed back to September 30th to early October, 2021. Jessica Hall
9/29/2021 Update or Other Action Per email from Platt Environmental Inc.: There is an outbreak of Covid in Naknek. The project has been postponed once again, this time by the Drillers. They will let ADEC know as soon as they reschedule. Jessica Hall
11/30/2021 Update or Other Action Per email from Platt Environmental Inc. on November 30, 2021, It’s very cold in Naknek (-20 with wind-chill). It has been determined that trying to drill the borings and develop the wells in these cold temperatures is counterproductive. They plan to keep an eye on the weather and re-schedule once an opening for warmer temperature arises. Jessica Hall
3/29/2022 Update or Other Action Release investigation to begin in May 2022. Jessica Hall
4/25/2022 Update or Other Action Drilling and field work to begin this week. Jessica Hall
6/24/2022 Document, Report, or Work plan Review - other ADEC sent comments to the RP on “Site Characterization Report”, dated May 2022. ADEC requested a revised report be submitted for review. Jessica Hall
9/3/2024 Site Characterization Workplan Approved Reviewed and approved the revised Site Characterization Event #2 Work Plan. Additional site characterization around the dispenser is planned for this fall. Dawn Wilburn
6/26/2025 Potentially Responsible Party/State Interest Letter A notice of liability letter was sent to new owners. Dawn Wilburn
7/2/2025 Document, Report, or Work plan Review - other Reviewed the 2024 Groundwater Monitoring and Soil Investigation Report dated June 2, 2025. Sent comments and requested a revised report. Dawn Wilburn
8/11/2025 Site Characterization Report Approved Approved the 2024 Groundwater Monitoring and Soil Investigation Report - Peninsula Automotive - Naknek, dated July 21, 2025. The purpose of the investigation was to determine the extent of soil contamination around the fuel dispenser and collect an additional round of groundwater samples. Contamination was detected above cleanup levels in two locations. Test pit 3, located approximately 20 feet west of the fuel dispenser, had exceedances of gasoline range organics, volatile organic compounds, and polycyclic aromatic hydrocarbons. Test pit 11, located approximately 8 feet south of the dispenser and near the building, had exceedances of volatile organic compounds. There were no detections of contaminants above cleanup levels in the groundwater Dawn Wilburn
9/8/2025 Workplan Requested Sent responsible party a well decommissioning work plan request. Dawn Wilburn

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

No associated sites were found.