Action Date |
Action |
Description |
DEC Staff |
11/4/1993 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 78062 (Added by System) |
Robert Weimer |
11/4/1993 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Excavated 140 cubic yards of contaminated soil. More contamination remains in the ground. |
Robert Weimer |
11/4/1993 |
Underground Storage Tank Site Characterization or Assessment |
Removed two gasoline tanks, contamination remains insitu. |
Robert Weimer |
11/4/1993 |
Site Added to Database |
|
Former Staff |
11/9/1993 |
Release Investigation |
RP's consultant installed 4 borings and did some test pits. Area of contamination at least 45 ft by 70 ft to 9 ft+ depth. Full extent of soil and groundwater contamination not determined. |
Robert Weimer |
11/18/1993 |
Leaking Underground Storage Tank Corrective Action Underway |
RP installed passive soil vapor extraction system and put 140 cubic yard stockpile in lined cell in the excavation of the former tank. |
Robert Weimer |
10/1/1998 |
Site Characterization Report Approved |
In October 1998 Shannon and Wilson conducted an environmental assessment for the Dowling Road upgrade from Old Seward to Lake Otis Parkway. As part of that work one boring/temporary monitoring well (97-17) was installed along the southern edge of the McKinley Fence property. Groundwater was encountered at 13 feet below ground surface. The soil sample collected from the boring was non detect for benzene and GRO, but had detectable tolune and xylenes that were below cleanup levels. The groundwater sample collected had 0.13 mg/l GRO and non detect BTEX. |
Robert Weimer |
10/2/2000 |
Meeting or Teleconference Held |
Talked with RP Rich Lindstrom he will send copy of the site assessment report and post closure notice soon. He had thought that all of the contamination had been dug out and put in a lined cell in the former tank excavation. He said that the 3 vent pipes installed still smelled of fuel. |
Robert Weimer |
10/11/2000 |
Site Characterization Report Approved |
ADEC receives a copy of the UST closure report dated December 1993, for the UST removal and assessment work conducted in November 1993. The report documented up to 150 mg/kg benzene and 12,000 mg/kg GRO in the 140 cubic yards of stockpile soils placed in a lined cell in the former tank excavation. Also up to 9,700 mg/kg GRO and 110 mg/kg benzene was left in the in situ-soils at the edge of the former tank excavation. Groundwater was encountered at 6 to 7 feet below ground surface (bgs) with a silt/clay layer at 9 feet bgs, with additional groundwater is expected at 15 feet bgs. Passive VES lines (running to black pipes along the office building to the north of the excavation) were installed in three trenches running east to west. On November 8, 1993 four soil borings (located about 20 to 25 feet away from the former tanks, one each to north, south, east, and west) had field readings collected but not analytical samples. Based on the high field readings the consultant concluded that the contamination extended beyond those borings. |
Robert Weimer |
2/20/2001 |
Potentially Responsible Party/State Interest Letter |
ADEC letter requesting release investigation plan by 4/2/01 and corrective action plan by 7/1/01. The letter also informed Rich Lindstrom of McKinley Fence Company of ADEC cost recovery. |
Robert Weimer |
2/20/2001 |
Potentially Responsible Party/State Interest Letter |
ADEC letter requesting release investigation plan by 4/2/01 and corrective action plan by 7/1/01. The letter also informed Rich Lindstrom of McKinley Fence Company of ADEC cost recovery. |
Robert Weimer |
2/20/2001 |
Update or Other Action |
ADEC letter requesting release investigation plan by 4/2/01 and corrective action plan by 7/1/01. The letter also informed Rich Lindstrom of McKinley Fence Company of ADEC cost recovery. |
Robert Weimer |
3/22/2001 |
Update or Other Action |
ADEC letter to McKinley Fence company regarding a contaminated site file CS100.234 (2100.38.098). Surface contamination was identified in 2000 the the location of soil boring B3MF. 17.39 tons of contaminated soil was removed and thermally treated at ASR. Confirmation soil samples collected from the base and sidewalls of that excavation were non-detect for BTEX and GRO so a closure letter was issued for that location. The ADEC letter noted that the closure letter did not apply to the soil and groundwater contamination associated with the UST systems. |
Robert Weimer |
4/2/2001 |
Update or Other Action |
ADEC approves request for an extension until 5/15/01 to submit a release investigation work plan for this site. |
Robert Weimer |
1/8/2004 |
Update or Other Action |
Talked with owner/RP Rich Lindstrom, he thought more work had been done by Shannon & Wilson since 4/2/01. He said he will provide the results. |
Robert Weimer |
12/10/2004 |
Update or Other Action |
The submittals discussed with RP on 1/8/2004 have not been submitted to date. |
Robert Weimer |
6/27/2005 |
Update or Other Action |
Discussed site with lender looking at property to the southwest. Left message with Rich Lindstrom of McKinley Fence Company to check on status of requested submittals and site work. |
Robert Weimer |
5/30/2008 |
Exposure Tracking Model Ranking |
Site ranked on the new Exposure Tracking Model (ETM). The ETM is a new site ranking system that looks at, based on available data, the potential exposure pathways for the contamination remaining at the site. |
Robert Weimer |
3/29/2011 |
Update or Other Action |
To date documentation of any additional work done by Shannon & Wilson has not been provided. Nor has the requested release investigation work plan or corrective action plan been provided. |
Robert Weimer |
10/28/2011 |
Update or Other Action |
To date documentation of any additional work done by Shannon & Wilson has not been provided. Nor has the requested release investigation work plan or corrective action plan been provided. |
Robert Weimer |
12/16/2013 |
Update or Other Action |
DEC letter to RP requesting the submittal, by March 31, 2014 of the requested a release investigation work plan, and the requested corrective action plan by July 1, 2014. |
Robert Weimer |
1/31/2014 |
Update or Other Action |
Project manager changed to Amy Dieffenbacher, file transferred to Juneau |
Annie Ariel |
4/3/2014 |
Update or Other Action |
Spoke with RP on the phone and he is aware of ADEC's requests & associated 2014 deadlines. Stated that DOT purchased a portion of their property. Test holes were drilled, soil and water samples were collected by DOT in 2003 or 2004 prior to purchase. RP stated he would submit soil and water sampling data to ADEC via email. |
Amy Rodman |
8/25/2014 |
Update or Other Action |
RP responded to Dieffenbacher's request for information with the 2001 ADEC decision letter concerning the excavated soil, and a Tanknology Corporation International 1992 tank tightness test certificate; no soil or water data. |
Lisa Griswold |
8/10/2015 |
Update or Other Action |
Project Manager changed to Lisa Griswold. File transferred to Anchorage. |
Lisa Griswold |
10/19/2016 |
Update or Other Action |
Request for Release Investigation sent on this date. Release Investigation work plan due by December 19, 2016. |
Lisa Griswold |
12/19/2016 |
Meeting or Teleconference Held |
Discussed site oversight with partner in company. He indicated that he would discuss ADEC October 19, 2016 letter with other partner. |
Lisa Griswold |
5/12/2017 |
Update or Other Action |
Letter sent to RP summarizing December 19, 2016 conversation; site management being transferred to Rodman; and for the site characterization work plan to be submitted as soon as possible as it is now past due. |
Lisa Griswold |
5/12/2017 |
Update or Other Action |
Site transferred to Rodman |
Lisa Griswold |
6/15/2018 |
Workplan Requested |
Site characterization work plan requested to address remaining soil and groundwater contamination at the site. Work plan due August 15, 2018. |
Amy Rodman |
9/14/2018 |
Workplan Requested |
Work plan request letter mailed to RP via USPS First Class. Work plan due November 15, 2018. |
Amy Rodman |
8/3/2021 |
Document, Report, or Work plan Review - other |
"Work Plan for 2021 Site Investigation: Soil and Groundwater Sampling" received from RSE consultants. Comments sent to RP on 8/27/2021. Comments addressed discrepancies on soil and groundwater COPCs and sample analyses, the number of groundwater monitoring wells, the presence of a confining layer, and several other minor clarifications. |
Julie Fix |
4/6/2022 |
Document, Report, or Work plan Review - other |
The “Report for 2021 Site Investigation: Soil and Groundwater Sampling at McKinley Fence Company” was received on this date. Comments on the draft report were sent to the RP and consultant on 5/10/2022. |
Julie Fix |
6/12/2022 |
Document, Report, or Work plan Review - other |
The 2022 "Corrective Actions Workplan" was received on this date. Comments were sent to the RP and consultant on August 16, 2022. Response to comments are pending. |
Julie Fix |
10/13/2022 |
Site Visit |
Site visit with RP on this date. Site is currently being leased and used at an equipment staging and storage operation. Continuing with site work is currently not feasible due to the current site operations and the financial situation of the RP. Field notes and photos have been saved to the site file. |
Julie Fix |