Site Report: Sunrise Bakery
Site Name: | Sunrise Bakery |
---|---|
Address: | 2248 Spenard Rd.; , Anchorage, AK 99503 |
File Number: | 2100.26.495 |
Hazard ID: | 23869 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 61.199918 |
Longitude: | -149.907916 |
Horizontal Datum: | NAD83 |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Scott Bailey PM
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
5/30/1990 | Long Term Monitoring Established | MS; America North Inc.: Two 6000 gallon diesel underground storage tanks with a loose elbow that possibly contributed to soil contamintion in excavation pit. Gas underground storage tank has total petroleum hydrocarbon reading of 87-2600ppm, source of contamination unclear at this time. | Former Staff |
6/1/1990 | Update or Other Action | REM; 500-700 tons contaminated soil removed & 100-200 tons of "clean" soil excavated stockpiled across Spenard Rd on CBCI property. Stockpiled soil thats uncovered needs to be covered. | Former Staff |
6/4/1990 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 76563 ADD; Diesel contamination. | Former Staff |
6/4/1990 | Site Added to Database | Former Staff | |
6/5/1990 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | LCAU; :LCAU Date changed DB conversion | Former Staff |
6/22/1990 | Release Investigation | SI; America North sent proposed workplan. 7/5/90 DEC: workplan doesnt meet work defined for identifying vertical/horizontal extent of contamination. Need 3 day notification prior to initiatng field work, details on "modified" 8015 & continuous soil profile from 1 soil boring. | Former Staff |
8/8/1990 | Release Investigation | SI; J. Halverson sent letter stating workplan was received/reviewed 8-7 & is approved for implementation as proposed. Based on results of this work, additional assessment &/or remedial actions may be requested at a later date. | Former Staff |
8/21/1990 | Update or Other Action | REM; Received plan for disposal of soils at Anchorage Sand & Gravel & plan not approved since ASG not accepting soils at this time. Letter sent requesting contaminated soils be completely contained until alternative treatment or disposal plan is approved. | Former Staff |
9/21/1990 | Update or Other Action | REM; Written approval granted to America North Inc. to dispose of soil from Sunrise Bakery at Anchorage Municipal Landfill. Request that receipt copies from disposal be sent to DEC. Terry Belka sent receipt copies from landfill showing delivery of contaminated soils by Nielson Bros. Excavating. | Former Staff |
12/4/1990 | Release Investigation | SI; America North sends contamination assessment report for site. Monitoring well #3 had benzene 443 ug/l, 105 ug/l toluene, 604 ug/l xylene. They recommend on site monitoring wells & proposed off site wells be sampled on quarterly basis to monitor presence of contamination in groundwater. | Former Staff |
12/26/1990 | Long Term Monitoring Established | MS; Not requesting additional cleanup if additional monitoring well is installed as recommended by America North, quarterly groundwater measurements/water quality samples are obtained from all monitroing wells associated with site, interim reports be submitted detailing monitoring efforts. | Former Staff |
4/23/1991 | Long Term Monitoring Established | MS; America North quarterly groundwater results received. MW-3 had 116 ppb VPH gas, 110 ppm EPH diesel, 79 ppb benzene. MW-5 suggested as the location of the furthest extent of dissolved phase petroleum hydrocarbon migration. MW-1, MW-2, MW-4, were below MRLs for parameters tested. | Former Staff |
8/24/1992 | Site Closure Approved | CLOS; Closeout letter reminded RP that ROMIG Park had a water well supply downgradient from site. Current test results on file with MOA water staff showed no VOCs in well at this time. | Former Staff |
8/24/1992 | Long Term Monitoring Complete | Entered by E. Reese 1/23/06 | Evonne Reese |
1/29/1998 | Update or Other Action | NFA letter mailed 26 Jan 98 Additional release was discovered after initial work | Former Staff |
4/21/2008 | Update or Other Action | File number changed from L55.74 to 2100.26.495. | Nicole Hurt |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |