Skip to content Skip to content

Site Report: Pizza Hut Administrative Offices

Site Name: Pizza Hut Administrative Offices
Address: 210 Center Court, Anchorage, AK 99518
File Number: 2100.26.205
Hazard ID: 23882
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 61.168424
Longitude: -149.883235
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Residual soil contamination. F.K.A. L55.26.

Action Information

Action Date Action Description DEC Staff
10/22/1990 Update or Other Action Received a copy of the "Alaska UST Decommissioning Notice" dated 10/22/90 via fax from Environmental Services Ltd. for a 1,000 gallon gasoline UST. John Halverson
11/7/1990 Site Added to Database Former Staff
11/7/1990 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 77576 ADD; Spill report from Ric Davidge of Environmental Services Ltd. Submitted to the department this date. Unleaded gasoline contamination. Former Staff
11/9/1990 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; :LCAU Date changed DB conversion Former Staff
3/18/1991 Release Investigation Sent a letter in response to review of the Environmental Services Ltd. UST closure report dated 1/17/91 for a 1,000 gallon underground tank. 12/19/90 sample results confirmed the necessity of additional site assessment/cleanup which will be done in spring. Upper range of EPH test results were from middle of excavation 1470 ppm (gas) & 687 ppm (diesel). However, the lab indicated that the data were not valid due to quality control issues. Soil samples taken from stockpiles: north 157 ppm & south 125 ppm total petroleum hydrocarbon contamination. Suggested that contamination is result of overfill spills. Spring '91 will excavate all contaminated soils & retest soil for contaminants. Requested a work plan to define the extent and magnitude of contamination as well as a corrective action plan by 4/19/91. John Halverson
4/19/1991 Update or Other Action In a conversation with Don Burrows, indicated that the regs required a groundwater sample be submitted for lab analysis. John Halverson
5/15/1991 Update or Other Action Received a copy of the Environmental Services Ltd. "Post Closure Report" dated 4/12/91. John Halverson
6/3/1991 Document, Report, or Work plan Review - other A letter was sent this date after review of the Environmental Services Ltd. "Corrective Action Plan" dated 4/18/91 and received by the department on 5/15/91. The matrix score of 26 was recalculated by the department to be 38 or Matrix Level B unless >25 cy of contaminated soil are found and then it will be Matrix Level A instead. Approval by ADEC required before transport and disposal of contaminated media. Contaminated soil stockpiles need to be placed on and covered by liners. Discrete soil stockpile samples requested. Depth to groundwater and whether it is contaminated needs to be determined by a soil boring and groundwater sampling and lab analysis. Bill Petrik
3/5/1993 Underground Storage Tank Site Characterization or Assessment SA1R; Former Staff
1/9/1998 Update or Other Action A letter was sent on this date requesting a response to the last letter sent by the department dated 6/3/91 requesting completion of a release investigation or a copy of the report if it has been completed. If the work has not been completed the department requests submittal of a new release investigation work plan by 3/6/98. Please supply information as to the status of the two cy contaminated soil stockpile that was on site, as well. Robert Weimer
10/24/2000 Update or Other Action Sent letter requesting a Release Investigation & Stockpile report. Due 12/1/00. The letter included a section on the department's cost recovery policy. Mike Mooney
12/12/2000 Update or Other Action Left word for Release Investigation work plan Due 12/1/00. No response received. Mike Mooney
1/29/2001 Update or Other Action Called Mr. Voss of Kurani, Inc., and left word with receptionist, she said she would give the message to Mr. Voss. No response. 1/16/01 - left word on voice mail, no response. 1/11/01- left word on voice mail, no response. Mike Mooney
2/26/2001 Update or Other Action Left word for owner on 2/23/01. On 2/26/01 Mr. Kurani returned call. I faxed him a copy of the letter of 10/24/00. No response. Mike Mooney
3/15/2001 Update or Other Action Call Manager Mr. Voss. He promised the Release Investigation and Report on stockpile. No response. Mike Mooney
3/26/2001 Update or Other Action Left word for Owner - Mr. Kurani. Mike Mooney
5/11/2001 Update or Other Action Wrote letter to owner. Stating that Release Investigation and Cleanup is needed before a NFA is issued. Received a letter from Voss asking what is the process. Mike Mooney
5/29/2001 Update or Other Action Received a letter from Vincent Voss stating that the contaminated soil stockpile is no longer on the property and it is Mr. Voss' belief that "it has been removed to the landfill in that its contamination level may be very small. I do not however have any documentation confirming this." Mr. Voss inquired about what the process that needs to be followed from here. Mike Mooney
5/31/2001 Update or Other Action A letter was sent to Voss this date restating required actions and sending him a list of environmental consultants to help them. Mike Mooney
5/31/2002 Update or Other Action Site transferred to DEC staff Amanda Dreyer. Lynne Bush
6/17/2002 Update or Other Action Spoke with Vincent Voss about getting a release investigation performed. Amanda Dreyer
2/19/2004 Update or Other Action Invitation to apply for Streamlined Cleanup Program sent by letter t the RP/owner. Bruce Wanstall
12/19/2006 Exposure Tracking Model Ranking Baseline ETM Ranking completed 12/11/06. Low potential exposure or incomplete pathways for all routes except GW ingestion. This route has a high potential exposure ranking due to soil samples above cleanup level, no data on GW and the presence of one well in the B Street Industrial Center and two others within 1000' of the site. Status of wells as a drinking water source unknown but should be determined. Daniel Fremgen
5/9/2011 Site Visit Site visit/meeting today with Kurani Inc. Bill O'Connell
10/25/2011 Meeting or Teleconference Held Meeting today with counsel for Kurani Inc to discuss proposed investigation at former UST site. Bill O'Connell
8/22/2012 Document, Report, or Work plan Review - other Reviewed work plan for release investigation at Pizza Hut Admin Offices, 210 Center Court. One borehole will be advanced at the source area and screened with a PID at 2.5 foot intervals. Up to two soil samples will be collected. Two additional boreholes will be advanced and sampled if contamination is suspected of being present in the first borehole. One wellpoint will be installed in the first borehole and a screening level water sample collected to evaluate the potential migration of contaminants to groundwater. Wellpoints may also be installed and sampled at the two additional boreholes. Bill O'Connell
9/25/2012 Site Visit Site visit today Bill O'Connell
11/29/2012 Document, Report, or Work plan Review - other Reviewed Release Investigation Report for 210 Center Court, Pizza Hut Administrative office. One soil boring was advanced and sampled at the location of the former gasoline UST and a groundwater sample was collected from a temporary well point. A fuel dispenser was formerly located immediately adjacent to the UST. Soil samples were collected from 5-7.5 feet bgs near the bottom of the former UST excavation, at 7.5-10 feet bgs and at 10-13 feet bgs. Moist soil was encountered above a silt layer near the former tank bottom at 6.5 feet bgs and groundwater was encountered at approximately 13 feet bgs, but rose to approximately 10 feet bgs in the well point after installation. Benzene was detected in soil up to 0.0414 mg/kg at 7.5 to 10 feet bgs but was not detected in the sample from 10-13 feet bgs. GRO and DRO were not detected in any sample. Contaminants were not detected above cleanup levels in the groundwater sample. Bill O'Connell
11/29/2012 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 77576 1,000 Gallon UST. Bill O'Connell
12/18/2012 Cleanup Complete Determination Issued The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with the Pizza Hut Administrative Offices located at 210 Center Court in Anchorage, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and this site will be closed. Bill O'Connell

Contaminant Information

Name Level Description Media Comments
TPH Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.