Site Report: FDIC - Formerly known as Jones Tool Rental
Site Name: | FDIC - Formerly known as Jones Tool Rental |
---|---|
Address: | 17141 N. Eagle R. Loop Rd; , Eagle River, AK 99577 |
File Number: | 2107.26.015 |
Hazard ID: | 24137 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 61.328886 |
Longitude: | -149.562852 |
Horizontal Datum: | NAD83 |
![]() | ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Contact: FDIC Charmaine DeGrazea 786-6452. FDIC has a security interest in property. Current tenant is A&R Auto Repair. Last staff assigned was Sundet. Prior to that was Bailey then Bush. FKA L74.09
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
12/19/1991 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 76775 Lab tests confirmed soil contamination near USTs. 7310 ppm of TPH at 2 1/2 foot depth in test hole 4 S2. | Robert Weimer |
12/19/1991 | Underground Storage Tank Site Characterization or Assessment | PA; FDIC submitted assessment prepared by High Phukan Consulting Engineers. Lab tests confirmed soil contamination near USTs. 7310 ppm of TPH at 2 1/2 foot depth in test hole 4 S2. Also found on site were numerous drums containing waste oil which present a potential hazard for release into subsurface soils. | Former Staff |
12/19/1991 | Site Added to Database | Former Staff | |
1/29/1992 | Update or Other Action | NOR; DEC issued new Notice of Release letter to Mr. Paul Jones. Mr. Jones responsed that FDIC now owned the property. | Former Staff |
2/25/1992 | Update or Other Action | CORR; Letter from Marianne See to Charmaine DeGrazia (FDIC) requesting ownership status of subject property. | Former Staff |
3/3/1992 | Update or Other Action | CORR; Received copy of demand letter from FDIC (owner) to A.R. Poston Auto Service (leasee) informing them that they are Potentially Responsible Party. Contamination report based on Dec. 1991 Phase II Environmental Assessment by High Phukan Consulting Engineers, Inc. under contract to FDIC. | Former Staff |
3/10/1992 | Update or Other Action | NOR; DEC issued new Notice of Release to A.R. Poston Auto Service. | Former Staff |
5/26/1992 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | In a Phase IIIC report by Phutan dated 6/3/1992 it noted that on 5/26/92 about 45 - 50 cy of contaminated soil was removed from around the LUST and that soil with elevated levels of EPH, VPH, TPH and benzene were stockpiled on site. Groundwater while at only 3.5 ft. bgs was not contaminated because of a layer of silt that provided a barrier to the contamination to migrate. | Rich Sundet |
5/26/1992 | Release Investigation | Samples were taken after about 45- 50 cy of contaminated soil was removed from around the LUST. | Rich Sundet |
12/30/1992 | Underground Storage Tank Site Characterization or Assessment | SA1R; DEC issued FDIC a letter to FDIC that provided comments to Phukan's "Permanent UST Closure" report dated 7/27/92; "Field Screening and Excavation of Contaminated Soils" dated 8/7/92; and "Phase II Environmental Assessment" dated 12/11/91. The DEC letter requested several documents/data so that a final review could occur. | Former Staff |
2/22/1993 | Update or Other Action | LCAU; Drum on site needs to have contents identified, receipts for thermal treatment, LCAR approved. | Former Staff |
3/22/1993 | Update or Other Action | On 3/22/93 DEC issued a letter to FDIC that it had reviewed documents provided to it on 2/26/93 from Phukan noting that the documents meet the requirements of the 18 AAC 78 regs. But that during a 3/19/93 inspections one drum was observed and DEC requested identification of its contents and disposla. In addition DEC noted that it required a receipt ofrom Clean Soils for the treatment of45 cy yds of contaminated soil prior to issuance of a NFRAP or Closure letter. | Rich Sundet |
8/2/1993 | Update or Other Action | CAPR; On 8/2/1993 DEC approved Phukan Consulting 6/10/93 dated workplan to bioremediate about 50 cy of contaminated soil on site. While DEC approved the plan, CSP's letter also provided comments on the plan and outlined was is needed | Former Staff |
9/2/1993 | Update or Other Action | In a 9/2/03 submittal, Phukan responded to CSPs 8/2/93 letter that asked questions on the leachate and othe issues surrounding the cell. | Rich Sundet |
11/20/1997 | Update or Other Action | ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JONES TOOL RENTAL & HARDWARE INC | Former Staff |
12/21/2001 | Update or Other Action | Site transferred from Bush to Sundet | Lynne Bush |
10/8/2004 | Update or Other Action | On 10/7/04, CSP contacted the MOA who verified the present owners of the property as Ronald and Mary Klassen. On 10/8/04, CSP issued a letter to the Klassen's that information is requested on the 45 cy stockpile and possible drums of wastewater that were on site as of at least March 1993. DEC also informed the Klassen's that if these issues are successfully addressed, the site can be closed. | Rich Sundet |
10/27/2004 | Update or Other Action | On 10/27/04, DEC issued a letter in followup to a meeting with Don Dougherty who met w/Sundet on 10/26 and presented data on soil tested on the lot. Based on the data, on 10/27 DEC issued a letter on nonobjection to transport of the tested 20-25 cy of soil on Block 4 to Tract 3A Hilghland Hills S/D on Hiland Rd. which is owned by Dougherty's client Mr. Dan Janke. It was unknown whether the subject soil was part of the 45 cy of soil that had been stockpiled in 1992 at the site. | Rich Sundet |
11/30/2004 | Site Closure Approved | Based upon info provided by Ron Klassen that the stockpiled soil was moved to the adjacent lot and no drums of wastewater was generated during the bioremediation, and remaining soil after excavation met regulatory Level C cleanup levels at that time (1993), on 11/30/04 CSP closed this site. | Rich Sundet |
3/19/2007 | Update or Other Action | File number issued 2107.26.015 (FKA L74.09). | Aggie Blandford |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
There are no documents for this site report.
No associated sites were found.