Site Report: Tesoro - Tsesyu -Parks Hwy.
Site Name: | Tesoro - Tsesyu -Parks Hwy. |
---|---|
Address: | Mile 210 Parks Hwy; Denali Hwy, Cantwell, AK 99729 |
File Number: | 150.26.007 |
Hazard ID: | 24249 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 63.389897 |
Longitude: | -148.903642 |
Horizontal Datum: | NAD83 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Groundwater in the area moves to the northwest.(rpltr5) Hung was lead.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/28/1990 | Update or Other Action | REM; During the excavation of two USTs (10,000 gallon unleaded and 5,000 gallon diesel) 50 - 60 cubic yards of contaminated soil was removed and the hole filled with clean fill. One single groundwater sample revealed high levels of contamination: benzene 1700 ppb, toluene 29,000 ppb, ethyl benzene 2300 ppb, xylene 30,000 ppm. Groundwater in the area moves to the north and therefore it is unlikely that any wells in the area will be effected. Possibility that the plume extends under the Parks Highway and towards the Nenana River. | Former Staff |
9/29/1990 | Underground Storage Tank Site Characterization or Assessment | SA1; | Former Staff |
2/22/1991 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 76863 ADD; Petroleum contamination in groundwater. | Former Staff |
2/22/1991 | Site Added to Database | Former Staff | |
4/4/1991 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | LCAU; HUNG: 5,000 gals. leaded gasoline UST system excavated '89. (1)10,000 gals. unleaded gasoline and (1)5,000 gals. diesel UST systems excavated 9/29/90. Soil and ground water impacted. Approx. 50-60 cubic yards contaminated soil stockpiled on-site. CAP pending FA. : LCAU date changed DB conversion | Former Staff |
4/12/1991 | Release Investigation | SA2; | Former Staff |
9/10/1991 | Leaking Underground Storage Tank Corrective Action Underway | CAPR; Basketfield reviewed workplan by FPE/Roen for site assessment. Verbal approval granted. | Former Staff |
9/17/1991 | Leaking Underground Storage Tank Corrective Action Underway | RAPR; Basketfield approved the use of a prezometer upgradient rather than a monitoring well, but still requested 3 monitoring well down gradient: 1 within leading edge; 1 outside of the leading edge; and 1 interval to lang axis and with the plume. | Former Staff |
4/30/1992 | Release Investigation | SA2; HUNG: Received final report and request for NFA. | Former Staff |
9/22/1992 | Update or Other Action | UPD; Hung reviewed. | Former Staff |
1/14/1994 | Update or Other Action | RPL2; Peterson sent PRP-CS Database Noitification Letter to RP requesting update and more environmental information concerning the contaminated site. As of this "complete date" no response has been received. | Former Staff |
5/6/1994 | Update or Other Action | TA; HUNG: For FAP - research status on cleanup grant issued 9/24/91. So far no activity since 5/92 and encumbrance to lapse 6/30/94. File review indicates 50-60 cu. yds contam. soil stockpiled on-site. Soil and grd. water impacted. No NFA letter issued. Consultant changed firms, unable to obtain rept. that he was involved with. Stockpiled soil needs to be dealt with, MWs installed grd. water contam. is small. Request extension beyond 6/30/94 deadline. FAP grants extention. | Former Staff |
6/6/1994 | Update or Other Action | CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. | Former Staff |
2/6/1995 | Release Investigation | SA2R; 12 SBs & 3 MWs indicate contam. plume 450-550 sq.'. Pit clean, MWs & site well contain low levels contam., stockpile contain low levels contam. | Former Staff |
2/13/1995 | Leaking Underground Storage Tank Corrective Action Underway | LCAR; RPCON did not analyze drinking water w/502.2, used 602. MWs not sampled long enough. RPCON sampled 9/26/91 & 3/15/92. Should have sampled quarterly for a yr. No lab results for '91 stockpile samples & no result for DW-2 sample taken 4/30/92 submitted. DRPH not analyzed for in area of heavy contam. | Former Staff |
2/28/1995 | Update or Other Action | CORR; Denied NFA request pending work plan re- resampling of most downgradient MW & analyze w/method 602. Resample site drinking well & analyze w/method 502.2. Submit missing lab reports on drinking water 4/30/92 and stockpile sampling. Response by 3/31/95. | Former Staff |
5/10/1995 | Leaking Underground Storage Tank Corrective Action Underway | CAPR; Brief work plan submitted 4/24/95 by RPCON in response to ADEC 3/2/95 ltr. Plan approved for resampling most downgradient MW, on-site (former) drinking water well and new drinking water well. EPA methods will be 602 and 502.2 respectively. | Former Staff |
2/11/1997 | Site Closure Approved | CLOS; Closure letter written to RP. All requirements for 18 AAC 78.240 have been completed for the USTs problems encountered 1990. | Former Staff |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
For more information about this site, contact DEC at (907) 465-5390. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
There are no documents for this site report.
No associated sites were found.