Site Report: Mat-Su Trainor Gate Rd. Bus Barn
Site Name: | Mat-Su Trainor Gate Rd. Bus Barn |
---|---|
Address: | 375 Trainor Gate Road; , Fairbanks, AK 99701 |
File Number: | 102.26.035 |
Hazard ID: | 24291 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 64.855540 |
Longitude: | -147.699070 |
Horizontal Datum: |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Staff change from Timmons. Blackards dba/Mat-Su Inc. dba/Aurora North Fuel Sales Inc. Previous file# 100.26.032 (rpltr)
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/25/1991 | Long Term Monitoring Established | MS; RP submitted sampling results from tank closure which were collected by VRCA Consultants. | Former Staff |
9/25/1991 | Update or Other Action | REM; Awaiting closure report. | Former Staff |
9/25/1991 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 77739 ADD; | Former Staff |
9/25/1991 | Site Added to Database | Former Staff | |
10/1/1991 | Leaking Underground Storage Tank Corrective Action Underway | RAPR; Timmons sent letter requesting site assessment. | Former Staff |
3/3/1992 | Update or Other Action | RPL2; ADEC/Peterson sent PRP-CS Database Notification letter requesting PRP update and provide additional environmental information concerning the site. As of "complete date" no response was ever rec'd. | Former Staff |
5/20/1992 | Update or Other Action | UPD; No response to Timmons letter of 10/1/91. Samples (6)taken by RPCON 7/24/91 completed. 9/26/91 PR results TPH ranged 592-29,727. Two gas tanks & one diesel sampled at fill and center. Request letter sent by DEC/Peterson 3/3/92 rec'd no response. | Former Staff |
2/17/1993 | Underground Storage Tank Site Characterization or Assessment | SA1R; Kalu: Site assessment was completed on April 30. Further action in form of corrective action is required. | Former Staff |
5/2/1993 | Update or Other Action | CORR; Kalu sent letter to RP requesting response by 5/20/93 with proposed line of action. | Former Staff |
9/1/1993 | Underground Storage Tank Site Characterization or Assessment | SA1; Kalu rec'd doc. and under review. | Former Staff |
9/4/1993 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | LCAU; Kalu- Tanks are closed. Awaiting submittal of CAP for contaminated GW. | Former Staff |
6/6/1994 | Update or Other Action | CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. | Former Staff |
1/13/1995 | Update or Other Action | TECH; Reviewed file for FAP request. (RP eligible for phase I cleanup grant). Found no compliance problems and DEC notified of release 9/25/91. | Former Staff |
11/20/1997 | Update or Other Action | ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JOE & MARY BLACKARD | Former Staff |
1/28/2004 | Update or Other Action | Transferred DEC staff lead from John Carnahan | Cynthia Pring-Ham |
3/13/2007 | Update or Other Action | Performed file review, laboratory data QA/QC review, and ETM ranking | Douglas Bauer |
3/24/2008 | Exposure Tracking Model Ranking | Initial ranking completed. | Tamara Cardona-Marek |
4/7/2008 | Update or Other Action | Spoke with consultant (Molly Green) at Rockwell Engineering and agreed on sampling wells MW-1 through MW-4 to determine the current status of the contamination on site. | Tamara Cardona-Marek |
12/5/2008 | Update or Other Action | ADEC received the August 2008 Groundwater Monitoring Report from Rockwell Engineering for the Trainor Gate Bus Barn. Three wells were sampled and a fourth one was dry. Benzene on well MW-3 was 16.6 ppb. All other analytes in all other wells were below cleanup levels or below detection. ADEC requested a CSM to evaluate a cleanup complete decision. | Tamara Cardona-Marek |
1/12/2009 | Meeting or Teleconference Held | Met with consultant. Discuss additional sampling and actions needed on site. Requested sampling of well MW-3 and stockpile (7 samples needed) to confirm that the soil is clean. CSM will also be completed. | Tamara Cardona-Marek |
9/22/2009 | Institutional Control Record Established | Institutional Controls established and entered into the database. | Tamara Cardona-Marek |
9/22/2009 | Cleanup Complete Determination Issued | Rockwell Engineering submitted groundwater sampling report for this site. Contaminant levels in well located within source area are below cleanup levels. Samples collected from landspread soil are also below cleanup levels. | Tamara Cardona-Marek |
9/22/2009 | Institutional Control Record Removed | Institutional Controls have been removed. | Tamara Cardona-Marek |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
GRO | < Table C | Groundwater | |
DRO | < Table C | Groundwater | |
Benzene | < Table C | Groundwater | |
DRO | < Method 2 Most Stringent | Soil | |
GRO | < Method 2 Most Stringent | Soil |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. |
No associated sites were found.