Site Report: Mat-Su Trainor Gate Rd. Bus Barn

Site Name: Mat-Su Trainor Gate Rd. Bus Barn
Address: 375 Trainor Gate Road; , Fairbanks, AK 99701
File Number: 102.26.035
Hazard ID: 24291
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 64.855540
Longitude: -147.699070
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Staff change from Timmons. Blackards dba/Mat-Su Inc. dba/Aurora North Fuel Sales Inc. Previous file# 100.26.032 (rpltr)

Action Information

Action Date Action Description DEC Staff
9/25/1991 Long Term Monitoring Established MS; RP submitted sampling results from tank closure which were collected by VRCA Consultants. Former Staff
9/25/1991 Update or Other Action REM; Awaiting closure report. Former Staff
9/25/1991 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 77739 ADD; Former Staff
9/25/1991 Site Added to Database Former Staff
10/1/1991 Leaking Underground Storage Tank Corrective Action Underway RAPR; Timmons sent letter requesting site assessment. Former Staff
3/3/1992 Update or Other Action RPL2; ADEC/Peterson sent PRP-CS Database Notification letter requesting PRP update and provide additional environmental information concerning the site. As of "complete date" no response was ever rec'd. Former Staff
5/20/1992 Update or Other Action UPD; No response to Timmons letter of 10/1/91. Samples (6)taken by RPCON 7/24/91 completed. 9/26/91 PR results TPH ranged 592-29,727. Two gas tanks & one diesel sampled at fill and center. Request letter sent by DEC/Peterson 3/3/92 rec'd no response. Former Staff
2/17/1993 Underground Storage Tank Site Characterization or Assessment SA1R; Kalu: Site assessment was completed on April 30. Further action in form of corrective action is required. Former Staff
5/2/1993 Update or Other Action CORR; Kalu sent letter to RP requesting response by 5/20/93 with proposed line of action. Former Staff
9/1/1993 Underground Storage Tank Site Characterization or Assessment SA1; Kalu rec'd doc. and under review. Former Staff
9/4/1993 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; Kalu- Tanks are closed. Awaiting submittal of CAP for contaminated GW. Former Staff
6/6/1994 Update or Other Action CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. Former Staff
1/13/1995 Update or Other Action TECH; Reviewed file for FAP request. (RP eligible for phase I cleanup grant). Found no compliance problems and DEC notified of release 9/25/91. Former Staff
11/20/1997 Update or Other Action ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: JOE & MARY BLACKARD Former Staff
1/28/2004 Update or Other Action Transferred DEC staff lead from John Carnahan Cynthia Pring-Ham
3/13/2007 Update or Other Action Performed file review, laboratory data QA/QC review, and ETM ranking Douglas Bauer
3/24/2008 Exposure Tracking Model Ranking Initial ranking completed. Tamara Cardona-Marek
4/7/2008 Update or Other Action Spoke with consultant (Molly Green) at Rockwell Engineering and agreed on sampling wells MW-1 through MW-4 to determine the current status of the contamination on site. Tamara Cardona-Marek
12/5/2008 Update or Other Action ADEC received the August 2008 Groundwater Monitoring Report from Rockwell Engineering for the Trainor Gate Bus Barn. Three wells were sampled and a fourth one was dry. Benzene on well MW-3 was 16.6 ppb. All other analytes in all other wells were below cleanup levels or below detection. ADEC requested a CSM to evaluate a cleanup complete decision. Tamara Cardona-Marek
1/12/2009 Meeting or Teleconference Held Met with consultant. Discuss additional sampling and actions needed on site. Requested sampling of well MW-3 and stockpile (7 samples needed) to confirm that the soil is clean. CSM will also be completed. Tamara Cardona-Marek
9/22/2009 Institutional Control Record Established Institutional Controls established and entered into the database. Tamara Cardona-Marek
9/22/2009 Cleanup Complete Determination Issued Rockwell Engineering submitted groundwater sampling report for this site. Contaminant levels in well located within source area are below cleanup levels. Samples collected from landspread soil are also below cleanup levels. Tamara Cardona-Marek
9/22/2009 Institutional Control Record Removed Institutional Controls have been removed. Tamara Cardona-Marek

Contaminant Information

Name Level Description Media Comments
GRO < Table C Groundwater
DRO < Table C Groundwater
Benzene < Table C Groundwater
DRO < Method 2 Most Stringent Soil
GRO < Method 2 Most Stringent Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.