Action Date |
Action |
Description |
DEC Staff |
1/7/1991 |
Site Visit |
RECN; Field inspection w/o sampling |
Former Staff |
10/7/1991 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77930 ADD; Suspected LUST site. |
Former Staff |
10/7/1991 |
Site Added to Database |
|
Former Staff |
1/7/1992 |
Leaking Underground Storage Tank Corrective Action Underway |
RAPR; Response letter 1-8-92 summarizing meeting. |
Former Staff |
6/12/1992 |
Update or Other Action |
CORR; Request for status of Site. MarkAir has not retained contractor. Stressed importance of initiating release investigation soon & w/ADEC approval. |
Former Staff |
8/24/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1; MarkAir delivered proposed SA to Thomas/ADEC. |
Former Staff |
8/26/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1; Thomas rec'd Phase I SA, dated 08/26/92. ADEC never rec'd this report and it was delivered at the MarkAir meeting after request from Thomas. Will review and respond. Thomas reviewed. Primarily a site conditions summary with no analytical data. 1,000 cu. yds. soil at this site has been excavated and remediated. Some GW flow info. of use. Closure is contingent on clean sampling for GRPH, DRPH, BTEX and lead of GW sample collected close to and downgradient of excavation limits. Response convered in SA2R letter. |
Former Staff |
8/26/1992 |
Update or Other Action |
CORR; Thomas sent ltr to MarkAir- acknowledged SA, requested final SA version when complete. |
Former Staff |
9/1/1992 |
Release Investigation |
SA2; Thomas rec'd from DOT/FAI report "Phase II Site Assessment", describing tank closure and initial site assessment findings for 17 removed USTs. MarkAir has not yet delivered official version due to a number on errors. |
Former Staff |
9/1/1992 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; Thomas reports: 4300 yards of diesel, gas and waste oil contaminated soils removed and stockpiled in respective waste-types on site, awaiting treatment option selection. Stockpile intergrity has reportedly been poor, and MarkAir has been asks to re-fit stockpile cover. |
Former Staff |
10/16/1992 |
Leaking Underground Storage Tank Emergency Response |
IA; Hung - Letter written re: approval of design and liners for stockpiling contaminated soils on-site. |
Former Staff |
2/25/1993 |
Update or Other Action |
CORR; Thomas request letter to Crowley for coordinated GW investigation effort between MarkAir, USPS, Crowley, and MAPCO. Outlined GW investigation parameters, and schedule. Requested response in 45 days, and meeting April 30, 1993. |
Former Staff |
3/21/1993 |
Release Investigation |
RELR; Thomas reviewed tank closure report for 17 USTs at MarkAir. 4 clean and 13 will require additional investigation. Waste oil, diesel gas contamination. Insitu, GW possibly impacted. Extent unknown, but widespread. 4,300 uds. soil excavated last year, stockpiled, and is pending sampling/treatment plan. Sent ltr requesting release investigation. |
Former Staff |
3/23/1993 |
Update or Other Action |
MEET; Thomas met w/MarkAir, DOT/FAI, and AK Dev. Auth. to discuss compliance status of MarkAir site where 17 USTs were removed. ADEC stated that MarkAir has already been tardy in responding, but is in good compliance as of this date. DOT and ADA questioned costs and time schedule for investigation and cleanup. |
Former Staff |
6/4/1993 |
Update or Other Action |
MEET; Thomas met with Markair & EMI and approved general placement locations of 9 MWs within the Markair properties. Wells will be installed & sampled by 6-30-93. These wells will tie into area-wide GW investigation. Final well placement and sampling results will be submitted later. |
Former Staff |
6/21/1993 |
Release Investigation |
SA2; Thomas reports: EMI submitted SA/Monitoring Well Report summarizing site assessment activities at two MarkAir facilities. A total of nine wells were installed. Hydrocarbons in all wells, above MCL for benzene in 3 wells, above MCL for PCE, DCE, TCE in one well. Gradient for ground water calculated. Will continue with long term monitoring for one year. |
Former Staff |
6/25/1993 |
Release Investigation |
SA2; Thomas received SA report authored by EMI summarizing Phase II investigation findings and results. Nine MWs installed on two Mark Air properties. Sampling event coincided with first Airport Land Users Group sample period. |
Former Staff |
11/11/1993 |
Release Investigation |
RELR; Thomas reviewed. One well at Weaver Bros (MW-3) showed benzene at 10 times the MCL. Other Weaver Brother wells showed varying levels of VOCs. One well at Main Hangar (MW-1) showed elevated Benzene, while MW-2 showed a number of Halogenated compounds above MCLs. ADEC will review next sampling round before offering further comments. |
Former Staff |
1/14/1994 |
Update or Other Action |
RPL2; Peterson sent PRP-CS Database Noitification Letter to RP requesting update and more environmental information concerning the contaminated site. As of this "complete date" no response has been received. |
Former Staff |
6/6/1994 |
Update or Other Action |
CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. |
Former Staff |
6/9/1994 |
Update or Other Action |
TA; HUNG: For FAP- RP indicated NFA which doesn't coincide w/11/11/93 RI review. Site not ready for NFA as only w.o. portion completed. Diesel/gasoline portion not addressed, need CAP by RPCON. |
Former Staff |
7/7/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
LCAR; Thomas reviewed biocell treatment plan by ESI for remaining 4000 yards of diesel and gas contaminated soils. Plan needs a number of clarifications. Requested response in 45 days. |
Former Staff |
7/13/1994 |
Update or Other Action |
CORR; Thomas approved ESI's revised CAP. |
Former Staff |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: MARKAIR, INC./William Barstow Bankruptcy Trustee |
Former Staff |
7/29/2003 |
Update or Other Action |
Met with DOT to discuss monitoring requirements. DOT will conduct a realease investigation to characterize soil and groundwater contamination remaining after UST removals. Six groundwater monitoring wells have been place at the site but plume delineation has not been completed. (MW-2 can no longer be found). |
Janice Wiegers |
12/30/2004 |
Update or Other Action |
ADEC sends letter to FIA requiring no further action on UST #1, UST #5, and UST#14. A groundwater monitoring point was required to determine if groundwater contamination remains near UST #6 and 7. The site remains open due to contamination from other USTs. |
Janice Wiegers |
12/22/2005 |
Underground Storage Tank Site Characterization or Assessment |
Received Site Characterization Report and a groundwater monitoring report for the site dated December 7, 2005. The report request NFA or NFRAP status for all but one of the remaining open tanks associated with this facility. Further work is required for soil and groundwater contamination associated with former tank #9. |
Kim DeRuyter |
2/17/2006 |
Update or Other Action |
Issued a no further action letter for USTs #6, #7, and 10. Contamination associated with these tanks is now below migration to groundwater cleanup levels. |
Kim DeRuyter |
2/21/2008 |
Update or Other Action |
Reviewed GW sampling report from Dec 2006. Consultant did not implement any of recommendations from Soil Gas Survey of June/july 2006. Sent letter to FIA requesting status of work and requesting implacement of wells along western property boundary (Warehouse site) and other recommendations be implemented. |
Neal Everson |
3/4/2008 |
Exposure Tracking Model Ranking |
|
Former Staff |
1/28/2009 |
Update or Other Action |
Workplan was approved for warehouse site. Work did not include sampling/characterization activities for Hangar site. |
Neal Everson |
6/26/2009 |
Update or Other Action |
A 400-gallon gasoline spill occurred in Jan 2009 South of the Hangar building and just south of the former UST #6 and #7 and WP10. ARES performed the cleanup and the project was managed by PERP. GW was likely not impacted. Status of cleanup is unknown. Has not come through site intake from PERP. |
Neal Everson |
5/26/2016 |
Meeting or Teleconference Held |
DEC met with the airport environmental manager to discuss several sites at the Fairbanks Airport. The environmental manager indicated that other sites take priority, per DEC's ranking, and a lack of funding may prevent work at this site during this field season. The current leaseholder at the site may also have some responsibility for some contamination and airport staff may approach them to conduct work at the site. |
Robert Burgess |
5/26/2016 |
Meeting or Teleconference Held |
DEC met with the airport environmental manager to discuss several sites at the Fairbanks Airport. The environmental manager indicated that FIA plans to contract a consultant to continue work at the MarkAir site. |
Robert Burgess |
3/12/2019 |
Meeting or Teleconference Held |
DEC staff and the DOT/FIA Environmental Manager to discuss airport priorities regarding contaminated sites located at the airport. For the MarkAir - FIA Main Facility (Hangar)site, additional site characterization was discussed and the need for additional work. The Environmental Manager indicated they have retained environmental consultants and would prepare a work plan. |
Megan Roberts |
5/1/2020 |
Meeting or Teleconference Held |
DEC staff met with the FIA Environmental Manager (ADOT&PF FIA is landowner & RP for this site) to provide site summaries of contaminated sites located on airport property, to discuss closure with institutional controls on airport property, and plan for future work on airport lead sites. |
Rebekah Reams |
7/29/2022 |
Document, Report, or Work plan Review - other |
DEC approved the MarkAir Hanger Site Characterization Work Plan following comment resolution. This work plan proposes to advance soil borings, install permanent and temporary monitoring wells, and collect analytical soil and groundwater samples at the site. |
Rebekah Reams |
5/5/2023 |
Offsite Soil or Groundwater Disposal Approved |
ADEC approved transport of 9.82 cubic feet of soil and 155 gallons of purge water generated in August 2022. |
Rebekah Reams |
12/7/2023 |
Document, Report, or Work plan Review - other |
ADEC provided comments on the MarkAir Hangar Site Characterization Report which documents the advancement of soil borings, installation of groundwater monitoring wells and temporary well points, the collection of analytical soil and groundwater samples, and provides conclusions and recommendations based on the findings of this investigation. |
Rebekah Reams |
12/11/2023 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77930 UST 9 and 13. |
Rebekah Reams |