Action Date |
Action |
Description |
DEC Staff |
8/26/1991 |
Underground Storage Tank Site Characterization or Assessment |
SA1; 30 cu yds. of contaminated soil frompossible overfilss of gasoline. Test results below detection limits. |
Former Staff |
9/19/1991 |
Update or Other Action |
NOR; Timmons |
Former Staff |
10/11/1991 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 76898 ADD; |
Former Staff |
10/11/1991 |
Site Added to Database |
|
Former Staff |
5/29/1992 |
Update or Other Action |
PUBP; Thomas wrote public notification bulletin for residents near Wescott pool to circulate during well search & sampling program. |
Former Staff |
7/6/1992 |
Release Investigation |
SA2; Gibler rec'd report by Shannon & Wilson: assessment of extent of contamination- soil probes, boring samples and monitor well have delineated extent of contamination. BTEX in GW- DRPH and GRPH present. Cover ltr, dated 8-3-92. |
Former Staff |
8/3/1992 |
Update or Other Action |
CORR; Cover letter for report of 7-6-92. |
Former Staff |
8/25/1992 |
Release Investigation |
RELR; By Thomas. Permission to excavate & thermally remediate granted- soil sampling plan recommended. |
Former Staff |
8/27/1992 |
Release Investigation |
RELR; Thomas reviewed. |
Former Staff |
8/27/1992 |
Leaking Underground Storage Tank Corrective Action Underway |
CAPR; Gibler reviewed. S&W recommended action of excavating and thermally remediating about 200 cu. yds. of soil approved. Sampling of soils left in place requested. |
Former Staff |
9/8/1992 |
Update or Other Action |
RPL2; ADEC/Peterson sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning the contaminated site. As of this "complete date" I have not rec'd response. |
Former Staff |
5/18/1993 |
Leaking Underground Storage Tank Corrective Action Underway |
CAPR; Gibler report excavation followed by thermal remediation at site. Sampling plan suggested by ADEC in letter of 8-27-93 accepted. Samples will be collected from bottom of excavation at tank center, bottom near faulty fitting, one per 16 ft. sq., and at 15 ft. intervals along excavation sides in zone of water table flucuation. |
Former Staff |
6/1/1993 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; HUNG: 500 gals. gasoline UST excavated 10/91. HOT discovered leaking from improperly connected piping. Soil and ground water impacted. 28 tons contaminated soil thermally treated 10/91. HOT piping repaired. Additional 200 cubic yards contaminated soil excavated and thermally treated 6/93. Monitor well installed and quarterly sampling continues. |
Former Staff |
5/27/1994 |
Update or Other Action |
TA; HUNG: HOT and gasoline UST probs. Both contributed to grd water contamination and lay side by side. 7/14/93 report re-cleanup. HOT excavated and replaced with new UST and Tiger Loop fuel system installed for boiler to eliminate pressurized return line. This will prevent recontamination of area in the future. Grd. water monitoring quarterly for at least a year. No NFA will be issued at this time. |
Former Staff |
6/6/1994 |
Update or Other Action |
CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. |
Former Staff |
9/15/1994 |
Update or Other Action |
UPD; DUPEE reviewed file. |
Former Staff |
9/16/1994 |
Update or Other Action |
CORR; DUPEE: Wrote ltr. to George Feree, FNSB, requesting quarterly monitoring well reports for the past year, as per ltr. written by Mike Taylor to Dan Basketfield on 7/13/93 outlining sampling plan and submittal of quarterly rpts. |
Former Staff |
9/26/1994 |
Update or Other Action |
CORR; DUPEE: Received ltr. from FNSB regarding quarterly m-w sampling in response to DEC ltr. dated 09/16/94. |
Former Staff |
10/4/1994 |
Update or Other Action |
CORR; DUPEE: Received response from FNSB 9/23/94 re: quarterly m-w sampling. States they will contract with S&W for sampling that will begin immediately. Will forward test results as soon as received. |
Former Staff |
11/27/1995 |
Update or Other Action |
UST Well Monitoring Report (Fourth Quarterly Report) received. Monitoring of MW-3 occurred on 1/31/95 and 8/1/95. Samples were analyzed for BTEX and all were below ADEC cleanup levels. |
Deborah Williams |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: FAIRBANKS NORTH STAR BOROUGH |
Former Staff |
1/28/2004 |
Update or Other Action |
Transferred DEC staff lead from John Carnahan |
Cynthia Pring-Ham |
5/3/2006 |
Update or Other Action |
Updated information in database to reflect file. |
Shannon Oelkers |
5/11/2006 |
Conditional Closure Approved |
Based on the information provided to date, ADEC has determined that the cleanup actions employed at the Wescott Pool have been effective in removing the majority of the contamination at the site. The contamination remaining beneath the former USTs does not pose a risk to human health or the environment provided site specific conditions and/or controls are attached to the property. |
Shannon Oelkers |
5/11/2006 |
Institutional Control Record Established |
A Notice of Environmental Contamination will be added to the ADEC Contaminated Sites Database identifying the nature and extent of contamination remaining on site.
In accordance with 18 AAC 78.274(b), ADEC approval must be obtained prior to removal and/or disposal of soil or groundwater from this site to an off-site location.
The groundwater on site shall not be used for any purpose without the prior approval of ADEC. |
Shannon Oelkers |
3/6/2007 |
Update or Other Action |
Contacted by consultant doing renovations to Wecott Pool. FNSB has a GW well on site that is more than 200 feet from the former UST site. The well is located within the pool building and is used yearly to draw down the water table so that they can empty the pool. The deep end of the pool extends to 12 feet, below the 9'6" water table. The water drawn down is discharged into the slough behind the building. Pool water is drained to the municipal sewer system. |
Shannon Oelkers |
4/4/2007 |
Update or Other Action |
Analytical results from groundwater well used for annual pool maintenance received. Review of data shows no detection of BTEX or PAH's. |
Shannon Oelkers |
3/30/2011 |
Institutional Control Compliance Review |
IC review conducted, tickler updated, and periodic reporting requirement added. |
Evonne Reese |
9/1/2016 |
Institutional Control Compliance Review |
Staff changed from Will Boger to IC Unit. IC compliance review conducted. Scheduled to send an IC reminder letter in the near future. |
Kristin Thompson |
9/6/2016 |
Institutional Control Update |
IC reminder letter sent to the responsible party on this date. |
Nathan Maxwell |
12/20/2021 |
Institutional Control Compliance Review |
An IC compliance review conducted on December 13 and a reminder letter of the current site conditions was issued to the responsible party on record. The next compliance review will occur in 2026. |
Elizabeth Bishop |