| Action Date |
Action |
Description |
DEC Staff |
| 9/11/1985 |
Preliminary Assessment Approved |
Woodward-Clyde conducted a site inventory 9/11/85 for the Army Corps of Engineers and produced a report, date unknown. The site has been a military site beginning in 1942 and is slated for cleanup under DERA funding. |
Former Staff |
| 7/13/1986 |
Update or Other Action |
(Old R:Base Action Code = MS - Monitoring/Sampling). Sampling apparently conducted without any QA/AC information and sampling methods and materials is not discussed. Tested for PCBs, metals, semi-volatile organic compounds and volatile organic compounds. High levels of toluene, acetone and ethylbenzene were found in a sample taken near underground storage tanks. Depth of sample not reported. |
Former Staff |
| 3/24/1990 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). U.S. Fish and Wildlife Service proposal to do additional sampling of fish and wildlife populations for DDT/DDE residue concentrations. Proposes collecting and analyzing 16 soil samples, 20 fish tissue samples and 10 eagle and osprey eggs. Also proposes to evaluate the need and/or feasibility of a cleanup of the asphalt barrel dump site. |
Former Staff |
| 10/23/1990 |
Site Added to Database |
Pesticide and suspected petroleum hydrocarbon contamination. |
Former Staff |
| 3/26/1991 |
Site Ranked Using the AHRM |
Attempted ranking but all three exposure indices are unknown at this time and additional sampling information is needed. |
Former Staff |
| 5/15/1991 |
Site Ranked Using the AHRM |
Used ranking from Reckey 199033X931701 after it was combined with this Reckey. Changed Toxicity Value from 2 to 4; SW Exposure Index Value from 0 to 0.4; SW Usage Value from 0.2 to 1; SW Exposure Index Value from 0 to 1; SW Environments from 2 to 3; and Environmental/Recreation Area from 2 to 3. Former score was 33. |
Katarina Rutkowski |
| 8/23/1991 |
Update or Other Action |
(Old R:Base Action Codes = RECN - Site Reconnaissance (CS) and MS - Monitoring/Sampling). Kalu and Noland conducted a site inspection to document number of potential sites along Northway Road. Wooden barrel dump near Moose Creek not sampled due to need for level C or B protection. Lorraine Titus yard tested for Pesticides/PCBs and waste dump at Enna Albert's house was also sampled for Pesticides/PCBs. An underground storage tank near basketball court at the airstrip. May possibly be on state land. RP appears to be Federal Aviation Administration. |
Kalu Kalu |
| 3/27/1992 |
Preliminary Assessment Approved |
ADEC received PA for Northway Staging Area which was completed by Ecology and Environment for the FAA. Report discusses other sites in the Northway area. Petroleum contamination found in soil and groundwater in housing area. Levels unknown. Pipeline breaks, spills and several USTs also may be sources of contamination. Electrical equipment needs testing for PCBs. |
Former Staff |
| 3/31/1993 |
Preliminary Assessment Approved |
(Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). PA/SI conducted for the village of Northway by D&M last October and submitted to the department in February 1993. Further investigation and assessment work is required at this site. |
Former Staff |
| 1/9/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). ADEC sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. RP received letter, but as of this "complete date" no response. |
Jeff Peterson |
| 2/23/1994 |
Update or Other Action |
(Old R:Base Action Code = RPL2 - Site Information Request Letter). ADEC sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. As of this "complete date" no response has been received. |
Jeff Peterson |
| 4/18/1994 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Received Volume 2 Draft Field Work Plans. |
Bob Couch |
| 8/24/1994 |
Meeting or Teleconference Held |
A Public Meeting was called by Dames and Moore to outline the field sampling and introduce the field personnel. Field work is scheduled to last six weeks. The sampling will be completed sometime in October at which time another Public Meeting will be held to go over the results. |
Bill Smyth |
| 8/24/1994 |
Update or Other Action |
(Old R:Base Action Code = SI - Site Investigation). Dames and Moore completed an extensive field sampling and site investigation at the Northway FUDS sites (10/3/94). A report summarizing the results will be prepared and submitted sometime before the first of the year. |
Bill Smyth |
| 10/14/1994 |
Update or Other Action |
Reviewed and updated file. Site is part of bigger, designated contamination area, i.e., Northway Contamination. Remediation of this site appears to be inclusive with extensive remediation efforts in both this site and the Former Military Staging Field (DERP) and Airstrip Dump. These sites have a bit of everything, from batteries to tar to pesticides. |
Jackie Dupee |
| 4/15/1995 |
Update or Other Action |
(Old R:Base Action Code = RAPR - Remedial Action Plan Review (CS)). Received: Draft Project Plan; Draft Community Relations/Public Involvement and Response Plan; Draft Site Safety and Health Plan. |
Bob Couch |
| 2/9/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Received from Dames and Moore, Draft Report Phase II Remedial Investigation Report / Feasibility Study (1995 Focused Remedial Investigation). |
Clint Adler |
| 3/29/1996 |
Update or Other Action |
Received "Final Physical hazard Evaluation Report" for the Northway Staging Filed Site and Comments attached. |
Clint Adler |
| 4/4/1996 |
Update or Other Action |
(Old R:Base Action Code = RARR - Remedial Action Report Review (CS)). Received "Draft Remedial Action Report", Volumes 1 and 2. |
Clint Adler |
| 5/22/1996 |
Interim Removal Action Approved |
Work Plan, Northway Staging Area, Interim Removal Action Draft received, June 4, 1996. |
Clint Adler |
| 6/4/1996 |
Site Characterization Report Approved |
(Old R:Base Action Code = FS - Feasibility Study (General)). Community Relations Summaries Report; Remedial Investigation / Feasibility Study; Phase II RI/FS (1995 Focused Remedial Investigation), Volume 1 of 2: Final Report and Volume 2 of 2: Appendices A through M; review Comments to Draft Report (January 1996) with Dames and Moore's Responses and Annotations. |
Clint Adler |
| 6/4/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Draft Work Plan, Phase III, Release Investigation, Volume 1 of 2: Project Plan, Sampling and Analysis Plan, Monitoring Well Decommissioning Plan and Investigative-Derived Waste Plan; and Volume 2 of 2: Project Health and Safety Plan. |
Clint Adler |
| 6/30/1996 |
Update or Other Action |
Final Report, Background Sample Data Evaluation, Northway Staging Field Site, Northway, Alaska, Contract Number DACA85-93-D-0008 (DO 0011), D and M Job Number 03221-042-160, received two (2) final reports, June 20, 1996. |
Clint Adler |
| 7/1/1996 |
Update or Other Action |
Technical Memorandum #1, Draft, Ham Lake (Area 43), Northway Staging Field Site, Northway, Alaska, received August 19, 1996. |
Clint Adler |
| 7/1/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Final Work Plan, Phase III Remedial Investigation, Northway Staging Field Site, Northway, Alaska, Volume 2 of 2: Project Health and Safety Plan, received August 16, 1996. |
Clint Adler |
| 7/1/1996 |
Update or Other Action |
(Old R:Base Action Code = RI - Remedial Investigation). Final Work Plan, Phase III Remedial Investigation, Northway Staging Field Site, Northway, Alaska, Volume 1 of 2: Project Plan, Sampling and Analysis Plan, Monitoring Well Decommissioning Plan, Investigative Derived Waste Plan, received August 16, 1996. |
Clint Adler |
| 3/1/1997 |
Proposed Plan |
Grouping of OU1. |
Katarina Rutkowski |
| 3/20/1997 |
Update or Other Action |
Site updated by Shannon and Wilson, based on the FUDS Site Summary dated 2/21/96. |
S&W |
| 4/1/1997 |
Update or Other Action |
Section 6 of Phase III investigation. Contract to E&E for Risk Assessment review. |
Katarina Rutkowski |
| 4/1/1997 |
Site Characterization Report Approved |
Phase III RI. |
Katarina Rutkowski |
| 11/10/1997 |
Site Number Identifier Changed |
Duplicate sites. Combined redundant data from Reckey 199033X931701 in to this site. |
Katarina Rutkowski |
| 6/1/1998 |
Site Characterization Report Approved |
Site Characterization Report Approved this date. |
Katarina Rutkowski |
| 7/1/1998 |
Interim Removal Action Approved |
WP for Ham Lake and POL Grease Pits. |
Katarina Rutkowski |
| 9/22/1999 |
Interim Removal Action Approved |
Further investigation at Ham Lake (area 43 and TACAN (area 8). |
Jeff Brownlee |
| 10/15/1999 |
Update or Other Action |
Site separated into two Operable Units (1 and 2). OU1 consists of 32 areas that were recommended for NFA in the March 1997 Proposed Plan. |
Jeff Brownlee |
| 4/18/2000 |
Update or Other Action |
Reviewed draft addendum site characterization report. Installation of three monitoring wells at the TACAN site. DRO at about 3.5 mg/L in two wells. Ham Lake - free product found in HL-2, which is a monitoring well within the 1998 excavation footprint. DRO soil contamination found between the limits of this excavation and Ham Lake, 30,000 - 100,000 mg/kg. Also Benzene soil contamination found at the southeast boundary of 1998 excavation up to 23 mg/kg adjacent to a concrete pad. DRO impacts to GW at the TACAN site show a decreasing concentration trend. |
Jeff Brownlee |
| 1/30/2001 |
Update or Other Action |
Draft No Further Action Report received for OU1. |
Debra Caillouet |
| 3/5/2001 |
Update or Other Action |
File number updated from 170.02.011 to 170.38.028. |
Mitzi Read |
| 12/23/2002 |
Site Closure Approved |
Decision Document for OU1, comprising 31 sites of which 21were of military origin, has been signed closing all of the sites. |
Debra Caillouet |
| 12/29/2009 |
Update or Other Action |
A revised Inventory Project Report (INPR) was received for the Northway Staging Field. The US Army Corps of Engineers has divided the staging field into four projects so that closures of the individual sites within the staging field can be counted. One project consists of the OU1 and OU3 sites that have already been closed by DEC, the next contains OU4 and OU5 sites that are ready for closure. The third project is the Ham Lake site that requires a Feasibility Study, Proposed Plan and Decision Document. The last project includes four areas that have data gaps that need to be resolved, Areas 4, 24, 26 and 48. |
Debra Caillouet |