Skip to content Skip to content

Site Report: Fairbanks Motors

Site Name: Fairbanks Motors
Address: 3775 South Cushman; , Fairbanks, AK 99701
File Number: 102.26.044
Hazard ID: 24306
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 64.812100
Longitude: -147.707090
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

(rpltr10)(scp)

Action Information

Action Date Action Description DEC Staff
1/30/1992 Site Added to Database Former Staff
1/30/1992 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 76904 ADD; Former Staff
1/30/1992 Underground Storage Tank Site Characterization or Assessment PA; Tanks emptied and removed from excavation. Further assessmant awaits spring thaw. Former Staff
1/31/1992 Underground Storage Tank Site Characterization or Assessment SA1R; Gibler reviewed. Former Staff
2/1/1992 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; HUNG: 500 gals. waste oil and 500 gals. unleaded gasoline USTs excavated 9/27/91. Further info. on contaminated soils pending. : LCAU date changed DB conversion Former Staff
6/6/1994 Update or Other Action CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. Former Staff
6/29/1994 Update or Other Action RPL2; Peterson sent PRP-CS Database Notification letter to RP requesting update and more environmental information concerning contaminated site. John(476-7586) from RZA responded by calling for RP confirming that indeed tanks were pulled in '91, but that perhaps because of late season final work was never completed. RZA has now been contracted to do over-excavation and has contacted Kalu for ADEC staff to approve work. RPCON responded with completed info. form. Former Staff
8/11/1994 Release Investigation RELR; HUNG: RPCON submits final report, entitled summary report/additional site assessment. Requests NFA. Former Staff
1/6/1995 Site Closure Approved CLOS; Reviewed entire file in conjunction w/EPA closure of class 5 injection well for NFA request. Commented that based on depth @ which slightly high Lead levels obtained, would have been appropriate to excavate 6" more and sampled interface. Would have confirmed whether Lead had/had not migrated to grd. water in levels that may cause future concern. Also use of UST not suitable as AST. NFA granted. Former Staff

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.