Skip to content Skip to content

Site Report: Carlile Enterprises, Inc.

Site Name: Carlile Enterprises, Inc.
Address: Aurora Drive; 900 Aurora Drive, Fairbanks, AK 99707
File Number: 102.26.056
Hazard ID: 24340
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 64.852970
Longitude: -147.760540
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Site and adjacent parcels were used as a portion of Sealand's Fbk's facility for tractor-trailer storage, transfer & maintenance fueling. Carlile and Sealand are 150 ft. apart. Three USTs excavated 9-15-92 along with all piping and dispensing islands. See also file# 102.38.020 (Former Sealand Terminal).(rpltr5) Hung was staff assigned.

Action Information

Action Date Action Description DEC Staff
5/2/1990 Site Visit LFI; RPCON submitted 5/29/90 "Report On Studies Of Potential Hydrocarbon Contamination, Fuel Facility And Tractor Shed, Former Sea-Land Property, Aurora Drive Fairbanks, Alaska" by Shannon & Wilson, Inc. for Sourdough Express, Inc. Former Staff
7/19/1992 Underground Storage Tank Site Characterization or Assessment SA1; Gibler rec'd rpt by Nortech. DRPH contamination present Former Staff
8/24/1992 Update or Other Action NOR; Gibler sent NORL. Former Staff
8/26/1992 Underground Storage Tank Site Characterization or Assessment SA1R; Basketfield reviewed. Former Staff
8/26/1992 Update or Other Action CORR; Basketfield sent ltr requesting corrective action plan. Former Staff
8/29/1992 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 76928 ADD; File# 102.26.056. Former Staff
8/29/1992 Site Added to Database Former Staff
9/22/1992 Update or Other Action UPD; Hung reviewed. Former Staff
12/15/1992 Update or Other Action UPD; The 7/31/92 "Underground Storage Tank Assessment" contains error in date of field soil borings & sampling. Field work & sampling for in-place closure conducted 6/19/92 NOT 7/19/92. Diesel detected @ 12.5'bgs-410 & 390 ppm. At 2.5'bgs 970 ppm diesel detected. Rept. confirms soil & grd. water contam. by diesel above ADEC cleanup levels. Recommends RI in order to define extent soil & grd. water contam. Three USTs excavated 9/25/92. No SA1 conducted. Same RPCON removed USTs & remediated soil. DEC gave verbal approval only for design of CCBC. No prior approval given for sampling of CCBC and final disposal of treated soils. Former Staff
12/25/1993 Leaking Underground Storage Tank Cleanup Initiated - Petroleum LCAU; RPCON submitted "Closure Report For Closed Cycle Bioremediation Cells" (CCBC) Former Staff
1/14/1994 Update or Other Action RPL2; Peterson sent PRP-CS Database Noitification Letter to RP requesting update and more environmental information concerning the contaminated site. As of this "complete date" no response has been received. Former Staff
3/13/1994 Update or Other Action CORR; HUNG: review for requested NFA letter indicated lack of approved CAP. Wrote letter with list of questions and request of documents in order to complete review. Former Staff
3/23/1994 Leaking Underground Storage Tank Corrective Action Underway CAPR; RPCON submitted "Clarification Of Closure Report, ADEC Letter 3/13/94" in response to CP request. Former Staff
3/25/1994 Update or Other Action MEET; HUNG: RPCON met w/Kalu and Hung in response to DEC 3/13/94 letter. RPCON indicated bioremediation CAP was verbally approved by Basketfield and Kalu. However, DEC was unaware nor approved of final disposal of soil by spreading around the site. Former Staff
4/11/1994 Update or Other Action MEET; HUNG: RPCON meets request by submitting more documents for review. Former Staff
6/6/1994 Update or Other Action CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. Former Staff
7/6/1994 Underground Storage Tank Site Characterization or Assessment SA1R; Reviewed 5/29/90 S&W, Inc. rept. 5/2/90 findings indicated SB 2 west of pumps detected presence of soil contam. slightly above detection limits @ water table. SB 1 east of pumps detected no hydrocarbons, however, headspace gas conc. suggest some level of volatile compds. Former Staff
7/13/1994 Update or Other Action CORR; HUNG: Informed RPCON that NFA denied as grd water quality unknown. NFA only for soils remediated. No record of MW installation(s),sampling/analyses of grd. water. Letter to follow. Former Staff
10/17/1994 Update or Other Action CP; RPCON submits "Closure Report" an after action summary with historical attachments. Former Staff
12/15/1994 Update or Other Action TBIO; 1,066 cu. yds. contam. soils from Carlile & Sea-Land sites were mixed and remediated ex-situ in CCBC together. Process operated 9/92-12/12/93. TPH levels 34-170 ppm from 12 sampling points. Soils spread over site(s) without prior DEC approval. Former Staff
12/19/1994 Update or Other Action UPD; Reviewed entire file for NFA request by RPCON. NFA denied based on not addressing grd. water contam. RPCON only addressed soil contam. RP given 30 days to respond upon receipt of ltr. Former Staff
1/6/1995 Leaking Underground Storage Tank Corrective Action Underway CAPR; RPCON submits one page written plan and schematic of where Hydropunches will be made. DEC requests more information and better schematic showing Hydropunch locations. Former Staff
1/10/1995 Leaking Underground Storage Tank Corrective Action Underway CAPR; RPCON submits another schematic of where three Hydropunches will be made. DEC awaiting information on Hydropunch drilling depth prior to final approval. Former Staff
2/1/1995 Leaking Underground Storage Tank Corrective Action Underway CAPR; Reviewed HydroPunch sampling plans submitted 1/6 & 1/10/95. Made requests to stagger and conduct multi-level sampling of ground water at various depths. RP agrees w/DEC revisions. DEC to be notified when HydroPunch sampling begins. DEC plans to be on-site to monitor activities. Former Staff
7/18/1995 Site Visit FI; RP notifies DEC that RPCON plans to drill 3 well pts. 7/21/95. DEC on-site w/RPCON to monitor correct placement of well points. Former Staff
7/26/1995 Site Visit FI; Oversee & assist RPCON in purging/sampling/field QC for BTEX method 602 from three well points drilled 7/21/95. Took photos. Former Staff
11/20/1997 Update or Other Action ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: CARLILE ENTERPRISES INC. Former Staff
11/25/1998 Site Closure Approved Former Staff
11/9/2000 Update or Other Action Receive letter of this date confirming the closure of monioring wells as requested by the DEC. John Carnahan

Contaminant Information

Name Level Description Media Comments
For more information about this site, contact DEC at (907) 465-5390.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.