Action Date |
Action |
Description |
DEC Staff |
10/1/1992 |
Site Added to Database |
|
Former Staff |
10/1/1992 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77743 ADD; |
Former Staff |
10/1/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1; Gibler: Excavation of 720 cu yds of contaminated soil failed to delineate the extent of contamination. Harding & Lawson are conducting a release investigation and will propose a corrective action plan when the RI is complete. |
Former Staff |
10/2/1992 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; HUNG: (4)20,000 gals. diesel fuel bulk storage systems excavated 9/29/92. Soil and ground water impacted. Approx. 1,420 cubic yards contaminated soil replaced in 4 areas of the excavation. RI and CAP in progress. : LCAU date changed DB conversion |
Former Staff |
10/6/1992 |
Update or Other Action |
NOR; Gibler sent NOR letter to FAA. |
Former Staff |
1/20/1993 |
Underground Storage Tank Site Characterization or Assessment |
SA1R; Gibler: The site assessment received on 1/19/93 was reviewed by Gibler. It appears that a layer of sand at the 5 ft. level is the most heavily contaminated portion of soil on the site. |
Former Staff |
2/23/1993 |
Update or Other Action |
RPL2; Peterson sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning the contaminated site. RP responded with corrections on ADEC site report. |
Former Staff |
6/6/1994 |
Update or Other Action |
CORR; Wingerter sent letter informing RP of their financial liability under new ADEC cost recovery policy. State is authorized, under Section 9003(h) of the Resource Conservation and Recovery Act to take action on this LUST facility. |
Former Staff |
9/29/1994 |
Update or Other Action |
TECH; DUPEE: Consulted with Larry Acomb, consultant for Northway LUST project, regarding CAP. He stated permafrost will not affect air sparging, soils are not as fine as initially thought; they will adjust blower to force more air through soils. Mounding not a problem, product is old with low solubility. VOCs are estimated to be low, probably won't do fertilizer and no studies are planned for microbes. Stated project will begin next May 1995. Subsequently sent letter further addressing DEC concerns over this remediation plan. |
Former Staff |
10/5/1994 |
Update or Other Action |
UPD; DUPEE: Reviewed and updated file. |
Former Staff |
10/17/1994 |
Release Investigation |
RELR; DUPEE: Reviewed Harding Lawson Associates Release Investigation dated 05/20/93. Extensive groundwater and soil contamination. Addressed contamination in letter dated 10/17/94 concerning RI and CAP. |
Former Staff |
10/17/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
CAPR; DUPEE: Reviewed Corrective Action Plan dated 04/20/94. Sent ltr. dated 10/17/94 requesting additional information on proposed remediation plan not contained in CAP. |
Former Staff |
3/13/2007 |
Exposure Tracking Model Ranking |
Initial Ranking Complete. |
Jill Taylor |
11/4/2015 |
Update or Other Action |
Site management reassigned to Carnahan. |
John Carnahan |
4/18/2017 |
Update or Other Action |
Letter sent to FAA requesting information on status of the investigations at these sites. |
John Carnahan |
5/3/2017 |
Site Characterization Workplan Approved |
Provide approval for FINAL WP FAA RI Northway Field FAA Sta, April 2017. |
John Carnahan |
6/10/2021 |
Document, Report, or Work plan Review - other |
DEC sent comments on the draft 2021 RI and GWM WP. The Radio Range Tower, Power Plant Building, Water Treatment Building, and CAA Former Garage building will have work done at their locations.
Surface soils and surface water will be sampled for lead and PCBs at the Radio Range Tower. Existing groundwater wells will be sampled for GRO, DRO, VOCs, PAHs at the PPB and WTB AOCs. At the Garage AOC, soil borings and groundwater monitoring wells will be installed and sampled and run for all POL CoCs, with the addition of EPH and VPH for use in HRC calculations. |
Tim Sharp |
8/30/2021 |
Site Characterization Workplan Approved |
ADEC approved the Final RI and GWM WP for the FAA Northway sites. Soil borings and monitoring wells will be installed and sampled at the CAA Garage AOC, and the HRC will be used to assess if the contaminants exceed risk criteria. Surface soils and surface water will be sampled for lead and PCBs at the Former Radio Range Tower and other groundwater wells will be sampled at other AOCs for GRO, DRO, VOCs, and PAHs. |
Tim Sharp |
5/5/2022 |
Document, Report, or Work plan Review - other |
ADEC sent comments on the 2021 Draft RI and Groundwater Monitoring Report for FAA Northway Station. The report details efforts to characterize and monitor contamination at several areas of concern (AOCs). Soil borings and monitoring wells were installed and sampled at the Former Civil Aeronautics Administration (CAA) Garage AOC, also known as the Basketball Court site. The Hydrocarbon Risk Calculator (HRC) was used to assess remaining risk criteria.
Surface soils were sampled for lead and polychlorinated biphenyls (PCBs) at the Former Radio Range Tower AOC. Groundwater monitoring was conducted at five other AOCs. |
Tim Sharp |
10/24/2022 |
Update or Other Action |
On October 21, 2022 ADEC approved the Final Remedial Investigation and Groundwater Monitoring Report |
Alyssa Wood |