Action Date |
Action |
Description |
DEC Staff |
10/28/1998 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77642 (Added by System) |
Robert Weimer |
10/28/1998 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
|
Former Staff |
10/28/1998 |
Site Added to Database |
|
Former Staff |
12/4/1998 |
Underground Storage Tank Site Characterization or Assessment |
Site assessment report identified soil contamination remaining. |
Robert Weimer |
5/28/1999 |
Document, Report, or Work plan Review - other |
May 28, 1999 groundwater monitoring event. Up to 250 ug/l benzene and 7.3 mg/l GRO in the groundwater. |
Robert Weimer |
7/1/1999 |
Release Investigation |
Release investigation report identified groundwater contamination. |
Robert Weimer |
9/22/1999 |
Leaking Underground Storage Tank Corrective Action Underway |
DEC letter approving corrective action plan for the groundwater. |
Robert Weimer |
6/20/2000 |
Document, Report, or Work plan Review - other |
June 20, 2000 groundwater monitoring event. Up to 5.08 ug/l benzene in the groundwater. Depth to groundwater is 3 to 25 feet below ground surface. Groundwater appears to flow to the southwest. |
Robert Weimer |
10/24/2000 |
Update or Other Action |
DEC letter approving reducing frequency of groundwater monitoring |
Robert Weimer |
10/5/2001 |
Document, Report, or Work plan Review - other |
October 5, 2001 groundwater monitoring. All groundwater samples meet cleanup levels for GRO and BTEX. Depth to groundwater is 5 to 27 feet below ground surface and appears to flow in the southwest direction. |
Robert Weimer |
12/2/2005 |
Update or Other Action |
The three site monitoring wells were decommissioned. Some soil contamination remains on the south side of the property in the utilities. |
Robert Weimer |
2/15/2007 |
Exposure Tracking Model Ranking |
Site ranked on the new Exposure Tracking Model (ETM). The ETM is a new site ranking system that looks at, based on available data, the potential exposure pathways for the contamination remaining at the site. |
Robert Weimer |
11/23/2011 |
Update or Other Action |
Evaluate site for corrective action complete or corrective action complete with IC's status. |
Robert Weimer |
4/1/2014 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 77642 Tank #1 Gasoline. |
Joshua Barsis |
6/19/2014 |
Cleanup Complete Determination Issued |
Cleanup complete with ICs issued on this day. |
Joshua Barsis |
6/19/2014 |
Institutional Control Record Established |
Institutional Controls established and entered into the database. |
Joshua Barsis |
10/6/2014 |
Institutional Control Update |
Current project manager chooses to retain management of the site at this time. |
Kristin Thompson |
9/30/2016 |
Institutional Control Compliance Review |
IC compliance review conducted. Staff changed from Joshua Barsis to IC Unit. IC/Closure Details updated. IC reminder letter issued requesting the signed ICs Agreement and Signature Page. Reminder system set to follow-up on the ICs Agreement in one month, and on land use conditions every five years. |
Kristin Thompson |
10/20/2016 |
Institutional Control Update |
Received the signed ICs Agreement Page today. |
Kristin Thompson |
6/21/2019 |
Institutional Control Update |
An Institutional Controls reminder letter e-mailed to the landowner/responsible party on this date. |
Mossy Mead |
9/25/2019 |
Institutional Control Compliance Review |
An Institutional Controls reminder letter mailed to the new owner (as of Aug 2019) of the property on this date. |
Mossy Mead |
9/25/2024 |
Institutional Control Compliance Review |
IC compliance review completed on this date. An IC reminder letter was issued to the landowner. The next review will be in five years’ time. |
Gaige Robinson |