Skip to content Skip to content

Site Report: USCG Cape Saint Elias Lighthouse

Site Name: USCG Cape Saint Elias Lighthouse
Address: Kayak Island, Cape Saint Elias, Cordova, AK 99574
File Number: 2207.38.001
Hazard ID: 2438
Status: Active
Staff: Sophia Bracio, 9074511682 sophia.bracio@alaska.gov
Latitude: 60.542214
Longitude: -145.759431
Horizontal Datum:NAD83

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Analytical results indicate that diesel has spilled or leaked at 3 locations. Observed DRO collected at 1' below land surface at tank 7 are 45,000 and 110,000 mg/kg. Diesel contamination exceeded cleanup level B at tank 6 and five other AST locations. Petroleum contamination appears to be limited to areas near the ASTs. Areas of staining at the spill areas appear to be relatively small. However, vertical extent of contamination is unknown, making volume estimation uncertain. Last staff assigned was Olson.

Action Information

Action Date Action Description DEC Staff
4/20/1995 Site Added to Database Site added to database. Mike Krieber
4/27/1995 Update or Other Action (Old R:Base Action Code = SA1R - Phase I SA Review (CS/LUST)). Analyses show that unacceptable levels of diesel range contamination was detected at 12" below ground surface. No samples were collected at greater depths. Immediate action is needed to stop the leak at tank #7 where soil contamination was reported to be 110,000 ppm. Cleanup action is needed this summer to prevent GW contamination if that has not already occurred. A site assessment/cleanup plan needs to be submitted to the Department for review and approval no later than 6/5/95. Mike Krieber
11/5/1996 Site Ranked Using the AHRM Site ranked by Shannon and Wilson personnel. S&W
5/25/2005 Update or Other Action File number updated 2207.38.001 (FKA 2215.38.026) Aggie Blandford
7/5/2006 Site Characterization Workplan Approved Interim Remedial Action workplan approved this date. Work plan (dated 6/06) also has sampling for lead and POL at the lighthouse. Work plan details how a site-wide average for lead in lead-based paint will be calculated. Anne Marie Palmieri
9/24/2007 Exposure Tracking Model Ranking ETM ranking Anne Marie Palmieri
11/15/2007 Site Characterization Report Approved Site characterization report approved this date. Site-wide average for lead is below alternative cleanup level of 1064. DRO is present in soils at the tank farm and under other aboveground tanks. Removal/remedial action required at the tanks. Anne Marie Palmieri
11/15/2007 Cleanup Level(s) Approved Alternative cleanup levels approved this date for lead: 1064 mg/kg and DRO: 8250 mg/kg. Lead level requires a future institutional control limiting the duration of stay to 210 days per year. Anne Marie Palmieri

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

There are no documents for this site report.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.