Action Date |
Action |
Description |
DEC Staff |
5/20/1992 |
Update or Other Action |
UST closure notice for removal of 4 unregistered USTs (3 JP-5 and one Gasoline). |
Donald Seagren |
5/27/1992 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77876 ADD; Remediation in progress |
Former Staff |
5/27/1992 |
Update or Other Action |
NOR; JP-5 Fuel release. 100 cy of contaminated soil removed and 150 gallons of affected groundwater was pumped. |
Former Staff |
5/27/1992 |
Site Added to Database |
|
Former Staff |
5/28/1992 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; 100 CY of contaminated soil removed and 150 gallons of affected groundwater pumped. : LCAU date changed DB conversion |
Former Staff |
6/1/1992 |
Underground Storage Tank Site Characterization or Assessment |
SA1; |
Former Staff |
6/23/1992 |
Leaking Underground Storage Tank Corrective Action Underway |
CAPR; Outlines specifications for a long term storage cell on-site. |
Former Staff |
7/21/1992 |
Release Investigation |
RELR; Removal of seven remaining UST's, additional 500cy contaminated soil removed. |
Former Staff |
11/6/1992 |
Underground Storage Tank Site Characterization or Assessment |
UST Site Assessment Work Plan and Ammendments approved by Randy Rice. |
Donald Seagren |
1/11/1993 |
Update or Other Action |
Decommissioning Report for JP-5 Tank Removal Project Air Station Sitka, dated November 92 received. Significant soil & GW contamination found during removal of the 7 USTs. |
Donald Seagren |
4/6/1993 |
Release Investigation |
Final Draft Report Underground Storage Tank Release Investigation for Air Station Sitka. |
Donald Seagren |
4/7/1993 |
Site Visit |
FI; SERO staff Randy Rice investigated site and cleanup operations. Photographs of monitoring wells and remediation piles were taken. |
Former Staff |
6/3/1993 |
Update or Other Action |
Randy Rice provides review comments of UST Release Investigation report. High levles of DRO contamiantion still exist. Further information/assessment required before proposed preferred remedition methods are approved. |
Donald Seagren |
4/14/1994 |
Update or Other Action |
Level C cleanup level (1,000 ppm DRO) approved for soil at this site. |
Donald Seagren |
5/25/1994 |
Underground Storage Tank Site Characterization or Assessment |
USCG proposal for sampling & dealing with oversized material approved by Randy Rice. |
Donald Seagren |
6/2/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
Proposed Corrective Action Plan submitted by MWW for USCG. |
Former Staff |
6/10/1994 |
Leaking Underground Storage Tank Corrective Action Underway |
Remediation Process Air Station Sitka submitted 2 June 94 by MWW for USCG approved by Randy Rice. |
Former Staff |
11/20/1996 |
Long Term Monitoring Established |
Fifth round of sampling reported by USCG. Soil gas and GW samples appear to be decreasing, but still above applicable cleanup levels. |
Donald Seagren |
6/23/1997 |
Long Term Monitoring Established |
Sixth round of soil gas monitoring and GW sampling submitted. Decreasing trend in soil and GW continues, although it is unclear whether this is due to bioremediatin or seasonl factors. Passive air blower assemblies installed on all wells. |
Donald Seagren |
1/28/1998 |
Long Term Monitoring Established |
DRO contamination still exists at the site exceeding ADEC cleanup levels. Hydrocarbon odor and sheen present in purge water from MW 3,14,& 20. Sheen present on surface of pond adjacent ot MW3. Strong hydrocarbon odor present in area. |
Donald Seagren |
5/18/1998 |
Long Term Monitoring Established |
Seasonal fluctuations in sampling results. No significant changes in contaminant levels. |
Donald Seagren |
8/10/1998 |
Update or Other Action |
UST closure notification submitted for in-ground closure of 12,000 gallon diesel fuel tanks. |
Donald Seagren |
1/22/1999 |
Long Term Monitoring Established |
30 November 98 semi-annual GW monitoring report submitted. Desreasing contaminant trend . Hydrocarbon odor and sheen on purge water from MW3. No sheen on pond, contaminant levels about same as previous sampling event Soil gas monitoring terminated by request of CEU Juneau.. |
Donald Seagren |
10/2/2001 |
Update or Other Action |
Changed Project Manager from Paul Horwath to Bill Janes |
Cynthia Pring-Ham |
1/25/2002 |
Update or Other Action |
Changed project manager back to Horwath. Was assigned to Janes by mistake. |
Bill Janes |
2/24/2003 |
Update or Other Action |
After file review, sent e-amil to Mark Ridgway, USCG-CEU-Juneau, requesting project status update. |
Donald Seagren |
5/26/2004 |
Update or Other Action |
File number assigned and entered into the Fileroom DB and LUST DB. |
Alyce Hughey |
6/5/2006 |
Cleanup Level(s) Approved |
Groundwater determination (18 AAC 75.350) made this date and groundwater cleanup levels of 10x Table C (DRO = 15 mg/L) approved. Soil cleanup levels are also 10x, specifically DRO = 2300 mg/kg. |
Anne Marie Palmieri |
9/27/2006 |
Leaking Underground Storage Tank Corrective Action Underway |
A corrective action plan was approved this date. Plan calls for the excavation of contaminated soil and disposal off-site. |
Anne Marie Palmieri |
9/24/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 77876 (Autogenerated Action) |
|
12/10/2007 |
Document, Report, or Work plan Review - other |
Cleanup report reviewed. Letter sent to USCG this date stating that the site can be conditionally closed when the USCG implements institutional controls. |
Anne Marie Palmieri |
12/17/2009 |
Cleanup Complete Determination Issued |
Cleanup complete determination issued this date in accordance with new closure policy. The USCG remains responsible for the appropriate future management of the remaining soil which contains concentrations of DRO below the ACLs but above the default method 2 level of 230 mg/kg. |
Anne Marie Palmieri |
12/17/2009 |
Long Term Monitoring Complete |
Administrative action on 5/1/2013. |
Kristin Thompson |