Action Date |
Action |
Description |
DEC Staff |
11/15/1993 |
Site Added to Database |
|
Former Staff |
11/15/1993 |
Underground Storage Tank Site Characterization or Assessment |
SA1; DUPEE: Site assessment undertaken by RZA AGRA for Evert's Fuel. Six soil samples collected from base of excavation pit at 10 to 12 feet. Petroleum levels were observed at concentrations up to 6,700 mg/kg for DRPH, 17,000 mg/kg for GRPH, and 4 mg/kg for benzene.. A test pit was advance to 17 feet, where contaminants levels appeared to be decreasing. 50 cubic yards of soil stockpiled onsite. Unknown whether groundwater impacted. |
Former Staff |
11/15/1993 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77858 ADD; Thomas: File# 100.26.100 Everts Air Fuel |
Former Staff |
11/16/1993 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
LCAU; Thomas reports 50 cu. yds. contaminated soil was removed from excavation pit and stockpiled on-site. Treatment planned for summer 1994. : LCAU date changed DB conversion |
Former Staff |
2/1/1994 |
Update or Other Action |
NOR; Thomas reports NORL sent to Evert's Air to initiate investigation/cleanup sequence. File# 100.26.100 |
Former Staff |
6/9/1994 |
Update or Other Action |
TA; HUNG: For FAP - requested SA and RI. Contacted RPCON for reports, copied reports and mailed to FAP 6/10/94. |
Former Staff |
6/9/1994 |
Document, Report, or Work plan Review - other |
Groundwater investigation report submitted. One monitoring well was installed approximately 30 feet northwest of the former USTs. Groundwater was encountered at approximately 17 to 18 feet. The groundwater sample contained 0.6 mg/L of DRPH, but no detectable BTEX or GRPH. Consultant recommended monitoring for one year. |
Janice Wiegers |
6/20/1994 |
Update or Other Action |
RPL2; Peterson sent PRP-CS Database Notification Letter to RP requesting update and more environmental information concerning contaminated site. Contractor AGRA responded on behalf of RP by returning completed information form. |
Former Staff |
8/22/1994 |
Update or Other Action |
UPD; DUPEE: Thoroughly reviewed and updated file to determine status of site. Informed case officers of any outstanding actions or possible follow up that needs to be completed. Emailed case officers the results of my review. |
Former Staff |
10/6/1994 |
Site Visit |
RECN; Thomas & Jackie D. conducted inspection of tank pull at Block 3, Lot 11 (also see 100.26.141). Two 15,000 gallon tanks out 10/5/94, and one 20,000 gallon tank pending. 20K tank is old RR tanker. Contaminated soils encountered, stockpiled. |
Former Staff |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: EVERTS AIR FUEL |
Former Staff |
5/9/2000 |
Update or Other Action |
ADEC notified through FIA building permit that Everts plans to install two permanent monitoring wells and two soil borings on Block 3, Lot 1. |
Janice Wiegers |
2/7/2006 |
Update or Other Action |
Letter sent requesting further site characterization. |
Kim DeRuyter |
2/7/2006 |
Potentially Responsible Party/State Interest Letter |
ADEC mailed potentially responsible party(PRP)letter to PRP informing of potential liability and are potentially subject to cost recovery of ADEC expense for response to soil and groundwater contamination at the 5472 Mail Trail site and the Block 3, Lots 1 and 11 Fairbanks International Airport sites. |
Kim DeRuyter |
3/24/2006 |
Update or Other Action |
Received reply to information request from Cook, Schuhmann & Groseclose on behalf of Everts. Everts is willing to sample MW's on Block 3 lots 1&11 not on the old crowley property. Attached a copy of the purchase agreement which states that CMS is responsible for further remediation at the site. |
Kim DeRuyter |
9/13/2006 |
Document, Report, or Work plan Review - other |
July 2006 Groundwater Monitoring Report received. MW-1 was sampled and all analytes were below detection limits. No analytes were detected in MW-1 when it was last sampled in 2000. MW-2 did contain DRO and GRO above the cleanup levels in 2000, but was not viable in 2006. This well should be replaced. |
Kim DeRuyter |
12/14/2006 |
Update or Other Action |
Rockwell Engineering called to say they had been contracted by Everts to replace broken monitoring wells at the site next spring, as requested in my letter to the RP. |
Kim DeRuyter |
5/30/2007 |
Exposure Tracking Model Ranking |
Initial ranking completed |
Evonne Reese |
2/11/2008 |
Update or Other Action |
Sent letter to EAF requiring additional work with their planned UST decommissioning activities in summer 2008. EAF needs to replace/repair three MWs, address soil contamination left after tank excavations, and give update on stockpile at mailtrail rd. |
Former Staff |
3/1/2016 |
Update or Other Action |
DEC requested soil and groundwater investigation to continue so the degree and extent of contamination can be adequately delineated. In addition, vapor intrusion potential for on-site buildings should also be evaluated. Monitoring wells at the site need to be inspected and either re-developed or properly abandoned. Response to the letter is requested by the RP within 30 days of receipt. |
Shawn Tisdell |
6/9/2016 |
Update or Other Action |
On May 26, 2016 the DEC contacted the RP after missing the 30 Day April 1 deadline. The RP had contacted the consultant in March, but neither the RP or consultant notified the DEC of the intent to move forward. This notification was provided via email on June 3rd. The consultant requested additional time to complete the workplan until the following week (until June 17th). This request was approved. |
Shawn Tisdell |
7/26/2016 |
Site Visit |
DEC staff and a consultant from ARES visited the site. One well was observed to be missing a cap and cover and needs repair. We discussed preparing a work plan this fall to prepare for site work next summer season. |
Shawn Tisdell |
4/5/2017 |
Meeting or Teleconference Held |
Meeting was held with DOT environmental staff to discuss Fairbanks International Airport contaminated site status. |
Shawn Tisdell |
1/23/2018 |
Meeting or Teleconference Held |
DEC staff met with DOT staff to discuss general coordination of contaminated site issues regarding leased properties at the Fairbanks International Airport and specific site information including cleanup activity status and upcoming work or proposed state action. |
Shawn Tisdell |
2/1/2018 |
Meeting or Teleconference Held |
DEC staff talked with consultant to discuss upcoming work plan submittal. |
Shawn Tisdell |
3/12/2019 |
Meeting or Teleconference Held |
DEC and DOT staff met to discuss progress and potential future cleanup action at this site. |
Shawn Tisdell |
5/25/2021 |
Meeting or Teleconference Held |
ADEC staff met with Everts Air representative and discussed management of stock piles and prioritizing response action for contaminated sites that Everts Air is managing. Both parties will meet again in a couple weeks to discuss more specific site cleanup action. |
Shawn Tisdell |
8/13/2021 |
Workplan Requested |
ADEC letter sent to RP requesting characterization of the former soil stockpile area located at 5472 Mail Trail Road and comprised of contaminated soil from the FIA-Everts Air Fuel Block 3, Lot 1 and Lot 11 sites. A workplan was requested with a 30 day timeline from this date. |
Shawn Tisdell |
10/1/2021 |
Document, Report, or Work plan Review - other |
ADEC project manager reviewed a Corrective Action Work Plan proposing soil sampling to document final site conditions within the footprint of the former soil stockpiles that were located at the 5472 Mail Trail Road Evert storage yard property in Fairbanks. These stockpiles resulted from contaminated soil that had been excavated from the former FAI Block 3 Lot 1 and Lot 11 that had been leased by Everts. |
Shawn Tisdell |
10/5/2021 |
Site Characterization Workplan Approved |
Corrective Action workplan for soil sampling the footprint of the former stockpile locations approved. Sampling expected during October, 2021. |
Shawn Tisdell |
6/21/2023 |
Meeting or Teleconference Held |
DEC project manager met with Everts Air Ground Operations manager to discuss four active contaminated sites including this one, which Everts is the responsible party. The general site cleanup process and site closure decision milestones were discussed. Contaminated soil stockpile management was discussed. A request was made by the DEC to determine current conditions of monitoring wells at each site and to develop a work plan for each site that leads towards site closure milestones. |
Shawn Tisdell |