Action Date |
Action |
Description |
DEC Staff |
3/28/1999 |
Site Added to Database |
|
Former Staff |
3/28/1999 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 77044 (Added by System) |
Former Staff |
3/29/1999 |
Underground Storage Tank Site Characterization or Assessment |
DRO in soil under dispenser @ 13,000 mg/kg and in footprint of 250 gallon generator UST @310 mg/Kg. All other soil confirmation samples for the UST closures by removal are below applicable cleanup levels for all analytes. No indication of soil contamination associated with the 5,500 gallon UST piping closed in place due to electrical and communication lines. |
Bruce Wanstall |
4/1/1999 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Two cubic yards DRO contaminated soil transported to lined and covered stockpile in the airport rock pit. Soil was land spread on-site. |
Bruce Wanstall |
10/2/2001 |
Update or Other Action |
Changed Project Manager from Paul Horwath to Mike Jaynes |
Cynthia Pring-Ham |
9/4/2002 |
Update or Other Action |
Project manager change from Jaynes to Wanstall. File review, database update. |
Bruce Wanstall |
1/30/2004 |
Update or Other Action |
Discussion with consultant TCI Environmental to discover fate of contaminated soil stockpile. |
Bruce Wanstall |
1/30/2004 |
Update or Other Action |
File review for Streamlined Cleanup Program. |
Bruce Wanstall |
2/4/2004 |
Update or Other Action |
Invitation letter to apply for Streamlined Cleanup Program sent to owner/responsible party. |
Bruce Wanstall |
4/14/2004 |
Streamlined Cleanup Program |
Site accepted into the Streamlined Cleanup Program. |
Bruce Wanstall |
4/29/2004 |
Site Closure Approved |
Closure includes waiver for formal release investigation requirement and confirmation soil sampling following remediation of contaminated soil incorporated into asphalt. Investigation of low level residual DRO in footprint of 250 gallon diesel UST (310ppm) waived under SCP as very low exposure risk to human receptors at the site. |
Bruce Wanstall |
9/25/2015 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST site created in CSP database for source area UST #7 2015 Release, 79826 |
Mitzi Read |
9/25/2015 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79826 name: UST #7 2015 Release |
Mitzi Read |
9/30/2015 |
Site Reopened |
The 2015 Nortech ARFF Building Hazardous Materials Survey Report soil sample KS-5 collected from surface soil at the fuel dispenser island had a diesel range (DRO) organics concentration of 4,820 milligrams per kilogram (mg/kg) and sample KS-4 collected in surface soil at the hazardous materials storage shed in the ARFF building had DRO concentration of 609 mg/kg and residual range (RRO) hydrocarbons of 5,930 mg/kg. As a result the site is reopened to track cleanup oversight of this release event. The Report is a product of an ADOT&PF project, as owner to provide upgrades to the building structure but not to the USTs and dispenser. |
Bruce Wanstall |
9/30/2015 |
Potentially Responsible Party/State Interest Letter |
Responsible Party Notification provided verbally on Tuesday September 22, 2015 and by letter sent certified mail today to Ketchikan International Airport Manager Mike Carney. |
Bruce Wanstall |
10/16/2015 |
Update or Other Action |
DEC letter sent by regular and electronic mail today requests that the Airport Director authorize an environmental professional to prepare a scheduled plan to perform a release investigation for soil and groundwater contamination associated with regulated UST system release and submit the plan for DEC approval before beginning any site activity. |
Bruce Wanstall |
3/24/2016 |
Site Visit |
Site inspection of the ARFF Building UST site |
Bruce Wanstall |
7/14/2016 |
Document, Report, or Work plan Review - other |
DEC evaluated and approved the Ketchikan Airport Maintenance Bldg USTs Report on release investigation and corrective actions completed by contractor R&M Engineering-Ketchikan Inc. The Report concluded that confirmation soil sample results indicate the limits of release at the KS-7 area of the Site has been removed. The contaminated soil is stored in a bio-remediation cell on airport grounds and will be tested in approximately one year’s time. DEC concurs with the Report conclusion and requested the Ketchikan Gateway Borough submit a management plan with the quantity and location of the bioremediation cell on airport grounds.
|
Bruce Wanstall |
10/26/2016 |
Document, Report, or Work plan Review - other |
DEC received a Report from R&M Engineering-Ketchikan Inc. on the bioremediation cell of contaminated soil removed from the UST site located at the Ketchikan Airport. The four cubic yard volume is located inside on the floor of the Maintenance Hanger on a liner bordered by pressure treated timbers. Nitrogen and phosphorus fertilizer was mixed into the soil as it was placed. R&M will collect analytical samples of the soil in about one year to find if the levels are below the threshold for land spread application on airport grounds. |
Bruce Wanstall |
10/10/2017 |
Update or Other Action |
Staff assigned changed from Bruce Wanstall to Robert Weimer. |
Kathryne Roldan |
7/19/2021 |
Update or Other Action |
Updated Affiliate contact information.
Per RP email dated July 19,2021, approximately one year ago the the four cubic yard volume of soils located inside on the floor of the Maintenance Hanger on a liner bordered by pressure treated timbers, was removed from the bioremediation cell and spread out and graded in the same covered warehouse area in which it was originally stored. This warehouse has a gravel floor and is used for storing surplus runway maintenance equipment.
|
Jessica Hall |
10/13/2021 |
Document, Report, or Work plan Review - other |
Sent RP comments on Ketchikan Airport Maintenance Building USTs. Requested an updated work plan be submitted. |
Jessica Hall |
11/5/2021 |
Site Characterization Workplan Approved |
Sent RP approval letter for the Site Characterization Report Proposed Work Plan, dated October 27, 2021.
Sampling will include 6 soils samples for DRO analysis, from the shop floor. If all samples are below MTG cleanup levels, this site will be eligible for closure. |
Jessica Hall |
4/4/2022 |
Update or Other Action |
Phone call with RM Engineering to discuss number of needed samples from the spread soils. |
Jessica Hall |