Action Date |
Action |
Description |
DEC Staff |
1/13/2000 |
Site Characterization Report Approved |
Phase II Site Investigation Report Received. The report documented soil and groundwater contamination exceeding ADEC cleanup standards for Diesel Range Organics and petroleum hydrocarbons. No PCBs were found in the soil above detection limits. The contaminants of concern at this site are petroleum hydrocarbons, specifically DRO. Additional remediation will be required to address the soil and groundwater contamination. |
Donald Seagren |
6/23/2000 |
Site Added to Database |
DRO and possible PCBs. |
Bruce Wanstall |
10/2/2000 |
Site Ranked Using the AHRM |
GW impacted but not an area DW source. |
Bruce Wanstall |
2/27/2003 |
Update or Other Action |
Responsible Party field changed based on new information from PacificCorp Environmental Remediation Company. |
Elizabeth Stergiou |
1/3/2005 |
Update or Other Action |
The file for this site was apparently lost in transferring between project managers and offices. A letter was sent to AT&T requesting copies of their entire file for this site. If it has not been done, additional site assessment &/or remediation is required to address petroleum contamination to soil and groundwater at the site. |
Donald Seagren |
1/3/2005 |
Site Number Identifier Changed |
The site was originally thought to have possible PCB soil contamination when the site was initially entered into the CS DB, hence the 09 Workplan in the reckey number. A Phase II Site Investigation Report shows that no PCBs above detection limits were found. DRO/petroleum hydrocarbons are the only COC. The Workplan was changed from 09 to 01 because after review of site characterization reports, there are no hazardous substances reported at this site above cleanup levels. |
Donald Seagren |
1/3/2005 |
Update or Other Action |
File number 2601.38.077 assigned and entered into the Fileroom database and Contaminated Sites database. |
Alyce Hughey |
1/3/2005 |
Site Number Identifier Changed |
Changed the Spill Date from 1/13/2000 to 3/11/1995. |
Donald Seagren |
2/17/2005 |
Update or Other Action |
Reviewed supplemental historic information missing from ADEC files that was supplied by consultant. Provided comments for development of work plan. |
Donald Seagren |
4/26/2005 |
Cleanup Plan Approved |
|
Paul Horwath |
7/27/2005 |
GIS Position Updated |
Using Figure 1.2 from a Phase II Site Investigation, Kodiak Earth Station, from Woodward-Clyde, dated December 29, 1997, in conjunction with TopoZone Pro, entered the coordinates for this site. Metadata include USGS Topo Map 1:63K, TopoZone Pro Street Map, on a Medium Size Map, View Scale 1:48,000, Coordinate Datum NAD83. Medium degree of confidence in accuracy of location. |
Alyce Hughey |
9/12/2005 |
Cleanup Plan Approved |
Approved the Cleanup Plan. Informed AT&T Consultant on the status of approval for the soil remediation facility on Kodiak Island. |
Donald Seagren |
4/9/2007 |
Spill Transferred from Prevention Preparedness and Response Program |
|
Donald Seagren |
4/9/2007 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 73428 (Autogenerated Action) |
|
9/14/2007 |
Update or Other Action |
Telephone call from Alex Tula. Due to changes in scheduling for USCG soils, the Kodiak soils will not be shipped off island this year. He will conduct an inspection and and make sure the stockpile is still covered. He will make any necessary repairs to the cover/liner. ALTA will request a variance until the summer of 08 for removal of the soils off the island for treatment. |
Donald Seagren |
12/11/2007 |
Update or Other Action |
Approved request for a one year extension for transporting the 250 yds3 contaminated soil stockpile off the island for disposal. The shipment of thses soils is being coordinated with a similar shipment from the USCG Kodiak base as a cost savings measure. The stockpile remains covered and in good shape. There are no concers to human health or the environment by leaving this stockpile on-site until the summer of 2008. |
Donald Seagren |
6/12/2008 |
Update or Other Action |
Site transferred from Don Seagren to Paul Horwath per Linda Nuechterlein. |
Alyce Hughey |
9/2/2008 |
Offsite Soil or Groundwater Disposal Approved |
450 cubic yards of soil was transported to Columbia Ridge Landfill in Washington State. |
Paul Horwath |
5/11/2010 |
Meeting or Teleconference Held |
Meeting with AT&T Inc., ALTA Geosciences and ADEC staff (Paul Horwath and Alyce Hughey) to discuss the Work Plans for the 2010 field season and any project updates. |
Alyce Hughey |
5/11/2011 |
Meeting or Teleconference Held |
Meeting with AT&T Inc., ALTA Geosciences, Iberdrola Renewables Holdings, Inc. and ADEC staff (Paul Horwath and Alyce Hughey) to discuss the Work Plans for the 2011 field season and any project updates. |
Alyce Hughey |
5/18/2012 |
Meeting or Teleconference Held |
Meeting with Paul Horwath, Alex Tula with ALTA GeoSciences and Larry Bamberger with AT&T to discuss the additional information needed for issuance of a Cleanup Complete Determination with Institutional Controls. |
Alyce Hughey |
4/10/2013 |
Document, Report, or Work plan Review - other |
|
Paul Horwath |
4/10/2013 |
Final Cleanup Report Reviewed |
|
Paul Horwath |
4/11/2013 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 73428 AST tanks. |
Alyce Hughey |
4/26/2013 |
Cleanup Complete Determination Issued |
Cleanup Complete letter issued 4/26/2013 to Mr. Lawrence Bamberger. |
Paul Horwath |
4/26/2013 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 73428 AST tanks. |
Paul Horwath |