Site Report: Tesoro Northstore #206
| Site Name: | Tesoro Northstore #206 |
|---|---|
| Address: | 11120 Kenai Spur Highway, Kenai, AK 99611 |
| File Number: | 2320.26.028 |
| Hazard ID: | 24539 |
| Status: | Cleanup Complete |
| Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
| Latitude: | 60.555256 |
| Longitude: | -151.250365 |
| Horizontal Datum: | WGS84 |
| ![]() |
![]() | ![]() |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Gas and Diesel contaminated soil was detected in 1997 and 1998 in the immediate vicinity of the UST systems. Some soil was excavated in 1997 and hauled to an ADEC approved soil treatment facility in Anchorage. An in-situ soil vapor extraction treatment system was installed and operated. Groundwater contamination was not detected above ADEC cleanup levels. In 2005, the UST systems were decommissioned and replaced with new UST systems. Additional soil contamination was excavated and transferred to an ADEC approved soil treatment facility in Anchorage. In August 2006, ADEC received the 2005 September Underground Storage Tank Closure Site Assessment Final (Revised) report, and based on the information provided in that report, the site was determined to be eligible for site closure. (Updated 9/6/06, Paul Horwath)
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 2/4/1997 | Site Added to Database | Former Staff | |
| 2/4/1997 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 77075 | Former Staff |
| 2/4/1997 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | Former Staff | |
| 2/10/1997 | Update or Other Action | Monica English sent a Notice of Release Letter after receiving the telephone notification of a petroleum release on February 4, 1997 | Alyce Hughey |
| 11/20/1997 | Update or Other Action | ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: TESORO ALASKA PETROLEUM CO | Former Staff |
| 1/5/1998 | Release Investigation | Paul Horwath sent a review comments letter after reviewing the Phase II Release Investigation from Gilfilian Engineering, dated November 12, 1997. | Alyce Hughey |
| 11/6/2003 | Streamlined Cleanup Program | Site meets criteria for Program acceptance | Bruce Wanstall |
| 11/21/2003 | Conditional Closure Approved | No Further Remedial Action Letter sent by Monica English. | Alyce Hughey |
| 10/14/2004 | Update or Other Action | File number 2320.26.028 assigned and entered into the Fileroom DB and LUST DB. | Alyce Hughey |
| 1/10/2006 | Institutional Control Record Established | The institutional control consists of this data base notation that residual soil contamination remains at this site, as well as the ADEC NFRAP determination letter which requires additional release investigation and cleanup work at the time the UST systems are removed. (The UST systems were replaced in 2005, so ADEC is currently awaiting the required report covering additional assessment and cleanup work.) | Paul Horwath |
| 4/10/2006 | Document, Report, or Work plan Review - other | Reviewed the January 2006 MWH UST closure site assessment report. Errors in the data tables need to be corrected and the soils that were treated at ASR in Anchorage weren't tested for GRO & BTEX. Awaiting a new submittal that will address these deficiencies prior to further processing of the project. PDH | Paul Horwath |
| 9/6/2006 | Institutional Control Record Removed | Additional site assessment and cleanup work performed at the time of UST system removal from August 23 to September 6, 2005, and the MWH report covering this work indicate that the soil and groundwater at this site meet the applicable ADEC soil cleanup levels. No institutional control is necessary at this time. | Paul Horwath |
| 9/6/2006 | Site Closure Approved | Review of the August 2006, MWH report titled 2005 September Underground Storage Tank Closure Site Assessment Final (Revised), supports the issuance of a Site Closure determination. Additional soil contamination was removed from this site, and post-cleanup confirmation soil sampling at the site was sufficient to conclude that the applicable ADEC soil cleanup levels have been attained. Therefore the site meets the requirements for final, unconditional closure. | Paul Horwath |
| 10/25/2006 | Update or Other Action | Using Figures 1 and 2 from the 2005 September Underground Storage Tank Closure Site Assessment, Final, from Montgomery Watson Harza, dated August 2006, in conjunction with TopoZone Pro and the KPB Parcel Lookup, entered the coordinates for this site. Metadata includes, No Topo Basemap, Black and White Aerial Photo, TopoZone Pro Street Maps, on a Medium Size Map, View Scale 1:9,840, Coordinate Datum NAD83. High degree of confidence in accuracy of location. | Alyce Hughey |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|---|---|---|
| Benzene | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | |
| DRO | Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation | Soil | |
| For more information about this site, contact DEC at (907) 465-5390. |
Control Type
| Type | Details |
|---|---|
| CS Database Notation And Letter To Landowner/RP | The institutional control consists of a notation in the CS Program database that residual soil contamination remains at this site, as well as the ADEC NFRAP determination letter which requires additional release investigation and cleanup work at the time the UST systems are removed. |
| No ICs Required |
Requirements
| Description | Details |
|---|---|
| When Contaminated Soil is Accessible, Remediation Should Occur | Additional release investigation and corrective action are required when the UST systems are removed. A report covering the release investigation and corrective action measures taken at the time of UST system removal. |