Site Report: AKARNG Akiak FSA

Site Name: AKARNG Akiak FSA
Address: Mukluk Street, USS 2243, Akiak, AK 99552
File Number: 2402.38.002
Hazard ID: 2456
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 60.912128
Longitude: -161.217485
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The 2013 investigation defined the areas of the site with soil contamination from diesel range organics (DRO) and gasoline range organics (GRO) remaining. Groundwater has been impacted with DRO and benzene above cleanup levels. A Record of Decision (ROD) for the Akiak FSRC was approved by ADEC in 2013. The ADEC-approved site-specific cleanup levels for soil listed in the ROD were 11,555 mg/kg for total DRO, 1,400 for total GRO, and 0.06 mg/kg for benzene. Cleanup levels for groundwater were 1.5 mg/L for DRO and 0.005 mg/L for benzene. In June 2015, a total of 132 yds3 of soil with DRO, GRO, and benzene concentrations greater than the ADEC-approved site-specific cleanup levels was removed from the Akiak FSRC. Analytical results for confirmation samples collected at the final excavation limits indicated that all soil with DRO, GRO, and benzene concentrations greater than the ADEC-approved site-specific cleanup levels was removed. The site is now under a long-term groundwater monitoring plan. Cleanup levels for soil and groundwater were established in September 2013 and are documented in the Akiak Federal Scout Readiness Center Record of Decision for Petroleum Contamination (ROD) with the same date. The cleanup levels for groundwater are 1.5 mg/L for DRO and 0.005 mg/L for benzene. For soil, the ADEC-approved site-specific cleanup levels are 11,555 mg/kg for total diesel range organics (DRO), 1,400 for total gasoline range organics (GRO), and 0.06 mg/kg for benzene.

Action Information

Action Date Action Description DEC Staff
5/7/1981 Site Added to Database Fuel oil contaminant. Former Staff
8/9/1991 Site Number Identifier Changed Old# 81220912702 New# 8125X912702 Western district, regular CS now. Bill Petrik
6/15/1995 Site Ranked Using the AHRM Initial ranking. Action code added because it wasn't when site was originally ranked. Too many unknowns, score is 0. John Halverson
2/22/1996 Site Ranked Using the AHRM Site ranked. Bill Wright
2/23/1996 Preliminary Assessment Approved (Old R:Base Action Code = SA1A - Phase I Site Assessment Approval). Phase 1 site assessment report reviewed and approved. Bill Wright
3/27/1996 Update or Other Action Letter sent with request for additional characterization of extent of contamination. Bill Wright
7/31/1996 Site Number Identifier Changed Combined Reckey 198125X912702 into this Reckey. Bill Petrik
9/9/1997 Site Ranked Using the AHRM Site reranked. Changed Population Density Value from 3 to 5; GW Usage Value from 0.1 to 0.8; GW Exposure Index Value from 0.4 to 1; SW Usage Value from 0.5 to 1; and SW Environments from 0 to 2. Former score was 8. Scott Pexton
9/15/1998 Site Characterization Workplan Approved Letter sent with approval of Final Site Sampling Plan for Remedial Investigation prepared by CH2MHILL. Scott Pexton
1/8/1999 Update or Other Action Draft Remedial Investigation Report received. Prepared by CH2MHILL. Scott Pexton
3/11/1999 Update or Other Action Letter sent with comments on draft Remedial Investigation Report. Scott Pexton
6/23/1999 Update or Other Action Received Final Remedial Investigation Report (dated May 1999), prepared by CH2MHILL. Scott Pexton
10/11/1999 Site Ranked Using the AHRM Site reranked based on May 1999 Akiak Remedial Investigation Report prepared by CH2MHILL. Scott Pexton
3/12/2004 Update or Other Action File number assigned: 2402.38.002. Sarah Cunningham
6/2/2004 Update or Other Action ADEC received Final Interim Removal Action Plan. Beatrice Egbejimba
7/2/2004 Update or Other Action DEC issued a letter stating the following: DEC has completed review of the document titled: Final Interim Removal Action Plan, Federal Scout Armory, Akiak, Alaska dated March 2004 and offers the following comments. DEC concurs with the general approach of the plan however, can not provide approval to the plan as written. The plan provides a general approach for the excavation, and handling of impacted petroleum contaminated soil but lacks site specific detail for DEC approval under 18 AAC 75. DEC understands that the AKARNG is performing this action to reduce risk to human health and the environment under 18 AAC 75.330, to provide for a partial cleanup at the site and not achieve cleanup levels. It is presumed that information gathered during this interim action will provide data to be used in determining any future actions required for site clean up. In conclusion, DEC has no objection to the interim removal approach provided and will defer any further regulatory decisions until review of the data collected from the site work. David Pikul
3/15/2005 Update or Other Action Legal description added per 5/1999 RI Debra Caillouet
3/16/2005 Update or Other Action Staff reviewed the Akiak Federal Scout Amory Installation Action Plan. The plan contains a summary of the actions to date and proposed cleanup strategy. The summary of the actions fairly depicts the results of the site investigation, but the removal action report documenting work conducted last year has not been received yet, little information on the removal action that occurred last year is described in the IAP. DEC will need to review the removal action report prior to concurring with a clean up strategy. If you could identify when the current structure will be removed that would help to understand the overall time period to complete cleanup. Debra Caillouet
3/13/2008 Exposure Tracking Model Ranking Initial ranking with ETM completed. Debra Caillouet
6/25/2008 Update or Other Action Staff provided comment on the draft characteriation/delineation work plan Debra Caillouet
8/13/2008 Update or Other Action Staff reviewed the site characterization work plan and provided comment to the AKARNG. Debra Caillouet
12/4/2008 Document, Report, or Work plan Review - other The Secondary Site Characterization report was reviewed and comments sent to the Guard. Debra Caillouet
2/19/2009 Document, Report, or Work plan Review - other Final Secondary Site Characterization, Federal Scout Armory, Akiak. The report provides additional characterization of the nature and extent of the contamination remaining at the Armory. It generally meets the requirements of 18 AAC 75 although a qualifed person did not perform the sampling. Debra Caillouet
2/3/2010 Meeting or Teleconference Held Staff participated in the Installation Action Plan meeting. Debra Caillouet
11/30/2010 Document, Report, or Work plan Review - other Staff reviewed and sent comment to the Alaska Army National Guard on the Draft Work Plan for Site Characterization at 21 Alaska Federal Scout Readiness Centers, November 2010, including the Site Specific Plans for Akiak, St. Mary’s and Tuntutuliak. Debra Caillouet
1/26/2011 Site Characterization Workplan Approved Final Work Plan for Site Characterization at 21 Alaska Federal Scout Readiness Centers, January 2011 and the Site Specific Plans for Akiak, St. Mary’s and Tuntutuliak. Debra Caillouet
5/23/2011 Site Characterization Workplan Approved Final Work Plan for Site Characterization at 21 Alaska Federal Scout Readiness Centers, April 2011 approved. Debra Caillouet
2/24/2012 Document, Report, or Work plan Review - other Comment sent on the draft data gap investigation report. Debra Caillouet
2/4/2013 Site Characterization Report Approved Akiak Federal Scout Readiness Center, Data Gap Investigation Report, January 2013 The investigation defined the areas of the site with soil contamination from diesel range organics (DRO) and gasoline range organics (GRO) remaining. Groundwater has been impacted with DRO and benzene above cleanup levels. The hydrocarbon risk calculator was used to calculate proposed alternative cleanup levels of 11,555 mg/kg DRO, 1400mg/kg GRO, and 0.06 mg/kg benzene. ADEC has no objection to the use of these soil cleanup levels. Groundwater monitoring is recommended in the report and ADEC concurs. Debra Caillouet
6/10/2013 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 73433 AST. Debra Caillouet
10/28/2013 Cleanup Level(s) Approved Record of Decision Debra Caillouet
1/9/2015 Cleanup Plan Approved Draft Akiak Remedial Action Plan, Federal Scout Readiness Center, December 18, 2014 Debra Caillouet
2/24/2015 Cleanup Plan Approved Final Akiak Remedial Action Plan, Federal Scout Readiness Center, February 12, 2015 - approved and letter sent. Debra Caillouet
12/16/2015 Document, Report, or Work plan Review - other Rec'd draft Akiak Remedial Action Report this date. Danielle Duncan
12/17/2015 Update or Other Action Staff changed to Danielle Duncan and hard file transferred to the Juneau office. Kristin Thompson
1/13/2016 Document, Report, or Work plan Review - other Sent approval letter for the Draft Akiak Remedial Action Report. A total of 132 yd3 of petroleum contaminated soil was removed from the site. The FSRC was moved to access contaminated soil underneath the building; it was replaced post-excavation. Field screening and confirmation analytical samples indicate that the remaining contamination is at levels below cleanup levels. No groundwater samples were collected on either attempts due to lack of groundwater. I have reviewed the draft report and have no comments. Danielle Duncan
2/29/2016 Long Term Monitoring Established Rec'd the Final Akiak Remedial Action Report this date. The first of the 5 year groundwater monitoring/sampling was not completed due to lack of groundwater. Sent approval letter. Danielle Duncan
4/27/2017 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 73433 AST. Danielle Duncan
8/30/2017 Update or Other Action Rec'd a letter requesting a Cleanup Complete Determination due to a data transcription error. After researching the groundwater value in question using the original data sheets, it was determined that the high level of DRO (27 mg/L) was detected in the past and was not actually 0.027 mg/L. I relayed this information to the AKARNG via telephone and sent the corresponding laboratory data. The plan now is to see if groundwater can be found - it has been of low volume or non-existent in the past. Danielle Duncan
10/4/2017 Update or Other Action Groundwater wells were dry the week of Sept. 5-7. Danielle Duncan
10/6/2017 Update or Other Action Reviewed the groundwater well log and notes provided by the AKARNG - some data indicates frozen soil, other data says no frozen soil. Their contractor is going to try and sample the wells again. Danielle Duncan
10/24/2017 Update or Other Action The contractor tried to send a team to Akiak last week, but they got weathered in in Bethel for two days. The contractor will try again next year. Danielle Duncan
12/20/2017 Document, Report, or Work plan Review - other Reviewed the draft LTM report and had 1 minor comment. Also emailed the AKARNG re: the depth of the previous well was 13 ft. and the current wells are 10 ft. belowground. Perhaps the current wells are too shallow? I am waiting for a final report before I send the approval letter. Danielle Duncan
4/12/2018 Site Characterization Report Approved Approved the Final Akiak 2017 Long-Term Monitoring Report this date. There has been insufficient groundwater for sampling for sampling years 2015 (2 attempts), 2016 (1 attempt), and 2017 (2 attempts, but 1 was thwarted due to poor weather/aviation conditions). The report concludes that Eagle Eye will continue to attempt annual groundwater sampling. The first 3 years of the 5 years of LTM have been completed, however, insufficient groundwater for sampling or no groundwater at all has been found during field expeditions. As discussed, possible options to acquire groundwater data are submitting low volume samples and/or drilling the wells deeper. As also discussed, more information is needed on the status of groundwater in Akiak and whether the 1998 documentation of polluted groundwater is factual or perhaps represented an active permafrost layer. Danielle Duncan
8/30/2018 Update or Other Action Per the consultant, the wells are still dry. Hopefully, the AKARNG will get funding to dig deeper wells in Federal FY19. Danielle Duncan
2/11/2019 Site Characterization Report Approved Approved the Draft Akiak 2018 Long-Term Monitoring Report this date. The report documented the results of the 2018 field season and fourth year of LTM. No measureable groundwater was observed in the wells and no samples were collected. Danielle Duncan
5/7/2019 Site Characterization Workplan Approved Reviewed and approved the Remedial Action Work Plan Addendum, Akiak Federal Scout Readiness Center this date. There has been insufficient groundwater for sampling for sampling years 2015 through 2018. As a result, the Alaska Army National Guard has contracted with Eagle Eye Electric, LLC to either drill the existing wells deeper or decommission the existing wells and install new ones using a GeoProbe drill. The existing wells are at 10 feet (ft.) belowground. If new wells are installed, they will be installed at a minimum depth of 13 ft. and/or the depth to permafrost and/or water. The presence/absence of permafrost and other characteristics will be noted. New wells, if installed will be constructed with GeoProbe 2.0 inch Slim prepack wells. Once water is located, the five year long-term monitoring will begin again. Danielle Duncan
7/12/2019 Update or Other Action Per the AKARNG, re-drilling the wells has been authorized and a final work plan should be received soon. Danielle Duncan
8/6/2019 Update or Other Action New deeper groundwater monitoring wells are being installed currently. Danielle Duncan
11/27/2019 Document, Report, or Work plan Review - other On this date, ADEC reviewed the Akiak 2019 Long-Term Monitoring Report submitted by Eagle Eye and dated November 2019. On August 26, 2019, Eagle Eye decommissioned the three existing wells and installed three new wells. During installation of the new monitoring wells, the existing boreholes from the decommissioned wells were advanced to 20 feet bgs. The predominant soil type from 10 to 20 feet bgs was silty sand. Sand was slightly damp at a depth of approximately 12 feet bgs in each, and was wet around 17 feet bgs. Permafrost was not encountered. Wells were set with the top of the screen between 13.7 and 14.6 feet bgs. New wells were developed by bailer and were sampled with a peristaltic pump. A groundwater sample collected from each well (plus a duplicate) contained detectable concentrations of DRO below ADEC Table C groundwater cleanup levels. Benzene and GRO were not detected in any groundwater sample. Groundwater flow was to the east-southeast. Grant Lidren
4/17/2020 Meeting or Teleconference Held On April 17, 2020 new ADEC PM and AKARNG PM held a meeting to discuss site status and plans for field season 2020 and future work. Rachael Petraeus
9/15/2020 Document, Report, or Work plan Review - other On September 15, 2020 ADEC received "AKARNG’s Long-Term Monitoring Work Plan Addendum for the Akiak FSRC" dated September 2020. The work plan includes preparation and production continual groundwater long term monitoring activities and analyzing for diesel range organics and benzene. Rachael Petraeus
10/7/2020 Site Characterization Workplan Approved On October 05, 2020 ADEC approved "AKARNG’s Long-Term Monitoring Work Plan Addendum for the Akiak FSRC" work plan dated October 2020. Rachael Petraeus
12/8/2020 Document, Report, or Work plan Review - other On December 08, 2020 ADEC received an updated and revised workplan. The work plan addition requests for additional LTM for spring and fall 2021. Rachael Petraeus
12/11/2020 Site Characterization Workplan Approved On December 11, 2020 ADEC approved the “Amended FINAL Akiak 2021 Long-Term Monitoring Work Plan Addendum Federal Scout Readiness Center Alaska Army National Guard” dated December 2020. The work plan includes additional sampling during the spring of 2021 Rachael Petraeus
8/20/2021 Document, Report, or Work plan Review - other On August 20, 2021 ADEC received "DRAFT AKIAK 2021 LONG-TERM MONITORING REPORT FEDERAL SCOUT READINESS CENTER ALASKA ARMY NATIONAL GUARD" dated August 2021. The report summarizes groundwater monitoring sampling results. The report is requesting for cleanup complete. Rachael Petraeus
9/17/2021 Site Characterization Report Approved On September 17, 2021, ADEC approved the "DRAFT AKIAK 2021 LONG-TERM MONITORING REPORT FEDERAL SCOUT READINESS CENTER ALASKA ARMY NATIONAL GUARD" dated August 2021. ADEC is requesting a decommissioning groundwater monitoring well work plan. This is the final 2021 LTM report. Rachael Petraeus
4/27/2022 Document, Report, or Work plan Review - other The ADEC received the "AKIAK FSA MONITORING WELL DECOMMISSIONING LETTER WORK PLAN", dated November 30, 2021 and submitted April 14, 2022. The ADEC provided comments in response to the work plan and is waiting for a revised edition of the work plan to be submitted by May 26, 2022. Flannery Ballard
5/18/2022 Site Characterization Workplan Approved The ADEC approved the "AKIAK FSA MONITORING WELL DECOMMISSIONING LETTER WORK PLAN". Field activities will occur in the late spring of 2022 and a report will be submitted to the ADEC following the completion of work. Flannery Ballard
7/11/2022 Document, Report, or Work plan Review - other The AKARNG submitted the report for MW decommissioning activities that took place June 2022. The ADEC is reviewing. Flannery Ballard
7/21/2022 Site Characterization Report Approved The ADEC approved the "Akiak FSRC Monitoring Well Decommissioning Technical Memorandum". The report summarizes the decommissioning activities for MW1A, MW2A, and MW3A. All refuse was disposed of at the local Akiak landfill. The report is uploaded to the database. The site is being considered for closure. Flannery Ballard
1/19/2024 Cleanup Complete Determination Issued The DEC has completed a review of the environmental history at the AKARNG Akiak FSA and soil and groundwater contamination at the site has been cleaned up to concentrations below the approved cleanup levels. Lisa Krebs-Barsis

Contaminant Information

Name Level Description Media Comments
Benzene < Method 2 Most Stringent Soil
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil
GRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70)