Site Report: Crabbs Corner
Site Name: | Crabbs Corner |
---|---|
Address: | Mile 128 Steese Hwy, Central, AK 99730 |
File Number: | 160.26.003 |
Hazard ID: | 24572 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 65.571740 |
Longitude: | -144.802758 |
Horizontal Datum: | NAD83 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
File review in '97 indicates no SA rept in file. Rept submitted 11/4/98, Dick McManus, RPCON indicates soil samples tested for DRPH. Closure notice indicates USTs contained gasoline. PID readings ranged 6-1007 ppm. Hung was staff assigned.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
8/16/1993 | Leaking Underground Storage Tank Release Confirmed - Petroleum | LUST Site created in CSP for source area ID 77836 (2) 3,000-gallon gasoline USTs installed in 1984 were removed. PID readings ranged 6-1007 ppm | Former Staff |
8/16/1993 | Site Added to Database | Former Staff | |
8/18/1993 | Leaking Underground Storage Tank Cleanup Initiated - Petroleum | entered by JC | Former Staff |
8/18/1993 | Underground Storage Tank Site Characterization or Assessment | Soil samples analyzed for DRPH. No analysis for GRPH, BTEX & Lead done. All four soil samples analyzed for DRPH levels were <MDL | Former Staff |
2/3/1997 | Update or Other Action | Phone call to DEC from RP requesting closure letter as want to sell property. RP informed by DEC that file review reveals no SA report in file. Need to contact RPCON and submit a copy of rept. | Former Staff |
11/20/1997 | Update or Other Action | ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: CRABBS CORNER | Former Staff |
11/4/1998 | Update or Other Action | Site Assessment conducted 8/16-18/93 received by DEC. Brief review indicates SA rept. does not coincide with product USTs stored, lab analysis selected and PID readings. | Former Staff |
10/27/1999 | Update or Other Action | Some soil removed and tanks were pulled. However, problems with the SA and the lack of adequate sampling require additional testing. No work should be completed without a review of the sampling locations by a DEC representative. (JBC) | Former Staff |
1/28/2004 | Update or Other Action | Transferred DEC staff lead from John Carnahan | Cynthia Pring-Ham |
4/26/2007 | Exposure Tracking Model Ranking | Initial ranking complete | Evonne Reese |
9/16/2008 | Update or Other Action | Paul Miller agreed to take soil samples and possibly dww sample - Possible DEC assistance next summer (late). Need GRO and BTEX. | Neal Everson |
5/10/2010 | Update or Other Action | Received information that owner of the site had passed away. The owner had been in contact with PERP and CS about additional sampling during the summer of 2009 or 2010 with a backhoe. DEC was planning a site visit during this work. The current owner has not been identified or contacted yet. | Janice Wiegers |
5/17/2010 | Update or Other Action | Met with Jim and Sandy Crabb to discuss closure options for this site. The Crabb's plan to hire a consultant to collect soil samples to confirm that no gasoline release occured from the tanks. Based on their knowledge of the tank system and the conditions when the tanks were pulled, they do not believe any release existed other than some minor spillage around the fill pipe. | Janice Wiegers |
8/4/2010 | Update or Other Action | Meet with prospective purchaser to discuss information in administrative file and data needs at this site. | Janice Wiegers |
1/22/2016 | Update or Other Action | DEC sent letter to Mr. Crabb requesting workplan within 60 days to complete a site assessment on the property for the UST removal. Original site assessment did not evaluate all COCs. | Janice Wiegers |
1/25/2016 | Potentially Responsible Party/State Interest Letter | PRP letter sent to Mr. Crabb. | Janice Wiegers |
2/9/2018 | Potentially Responsible Party/State Interest Letter | PRP letter sent to current owners of the property based on a review of DNR land records. | Janice Wiegers |
3/15/2018 | Update or Other Action | Contacted by landowner's attorney; discussed site history and remaining requirements. | Janice Wiegers |
4/30/2018 | Update or Other Action | DEC has been contacted by the property owner and S&W regarding possible plans for completing site assessment this summer. | Janice Wiegers |
6/7/2018 | Document, Report, or Work plan Review - other | DEC received and reviewed a proposal for additional site assessment/release Investigation from Arctic Data Services. Proposal meets the requirements for the site. | Janice Wiegers |
8/22/2018 | Document, Report, or Work plan Review - other | UST Investigation Report submitted by Arctic Data Services for Crabb's Corner. Four soil borings were installed in the former UST and dispenser locations. The borings were installed to a depth of 15 feet bgs and sampled based on field screening results and to target soil directly beneath the former tank depth. One temporary well point was installed downgradient and groundwater samples were collected from the well point and the on-site drinking water well. Low levels of DRO were found in two soil borings and in the groundwater and drinking water wells. However, the DRO results were all below DEC's cleanup levels, and the laboratory indicated the DRO in groundwater may be due to laboratory cross-contamination. Chloromethane was also found in the well point, but did not exceed cleanup levels. | Janice Wiegers |
10/5/2018 | Cleanup Complete Determination Issued | Site closed and letter sent to current landowner. | Janice Wiegers |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | < Table C | SoilGroundwater |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) |
No associated sites were found.