Action Date |
Action |
Description |
DEC Staff |
11/12/1996 |
Underground Storage Tank Site Characterization or Assessment |
On November 1996 two 4500 gallon gasoline underground storage tanks and their associated piping were removed. 100 cubic yards of contaminated soil (up to 0.2 mg/kg benzene and 1100 mg/kg GRO) was excavated and is currently stockpile on-site. Up to 0.053 mg/kg benzene and 8.1 mg/kg GRO was left in the excavation. |
Robert Weimer |
11/12/1996 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 78066 Gasoline contamination. |
Former Staff |
11/12/1996 |
Site Added to Database |
|
Former Staff |
11/20/1997 |
Update or Other Action |
ADEC sends Notification of Intent to Cost Recover Letter to Current Owner: HAROLDS RENT-A-TRUCK, INC. |
Former Staff |
11/25/1997 |
Update or Other Action |
stockpile in backyard, sample next year; Nicki; 563-3988 |
Former Staff |
3/25/1998 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
|
Former Staff |
9/11/1998 |
Release Investigation |
Monitoring well installed near former tank location and sampled. Groundwater at 13 feet below ground surface. Up to 13.8 ug/l benzene in the groundwater. |
Robert Weimer |
9/25/1998 |
Document, Report, or Work plan Review - other |
September 25, 1998 groundwater monitoring event. Up to 29 ug/l benzene in the groundwater. Depth to groundwater was 10 feet below ground surface. |
Robert Weimer |
9/28/1998 |
Document, Report, or Work plan Review - other |
September 28, 1998 sampling of the on-property drinking water well located near the former tank excavation. The drinking water well sample was non-detect for all contamination. |
Robert Weimer |
5/24/1999 |
Update or Other Action |
DEC requests quarterly groundwater monitoring and stockpile sampling |
Former Staff |
5/30/2002 |
Update or Other Action |
Transferred to DEC staff Amanda Dreyer |
Robert Weimer |
6/26/2002 |
Update or Other Action |
Letter request for Quarterly Groundwater Monitoring Results |
Amanda Dreyer |
9/19/2002 |
Update or Other Action |
Contacted Anita Kay Van Buren (RP) she contacted a new Environ. Consultant from Restoration Science named Dave Nyman 278-1023. |
Amanda Dreyer |
9/27/2002 |
Document, Report, or Work plan Review - other |
September 27, 2002 groundwater monitoring event. Up to 7.1 ug/l benzene in the groundwater. |
Robert Weimer |
4/19/2005 |
Update or Other Action |
Request for site update letter sent to the attention of Ms. Van Buren. |
Lynne Bush |
4/26/2005 |
Update or Other Action |
Request for update letter returned. Additional investigation into contact and or RP needed. |
Lynne Bush |
5/9/2006 |
Update or Other Action |
Project management transferred from Bush to Weimer. |
Aggie Blandford |
6/2/2008 |
Exposure Tracking Model Ranking |
Site ranked on the new Exposure Tracking Model (ETM). The ETM is a new site ranking system that looks at, based on available data, the potential exposure pathways for the contamination remaining at the site. |
Robert Weimer |
12/21/2010 |
Update or Other Action |
Still have not received requested groundwater monitoring data. |
Robert Weimer |
10/28/2011 |
Update or Other Action |
Still have not received requested groundwater monitoring data. |
Robert Weimer |
1/30/2014 |
Update or Other Action |
Project manager changed to Amy Dieffenbacher, file transferred to Juneau |
Annie Ariel |
6/9/2014 |
Update or Other Action |
Site is currently used as Anchorage Auto Repair (A & A The Shop). |
Amy Rodman |
11/12/2014 |
Update or Other Action |
Mailed Corrective Action work plan request letter to RP via USPS Certified Mail. |
Amy Rodman |
1/5/2015 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78066 1996 UST contamination. |
Joshua Barsis |
4/21/2015 |
Document, Report, or Work plan Review - other |
Reviewed A&A The Shop Subaru Service Groundwater Monitoring Well Sampling Final Report, dated April 2015. Analytical samples were collected from one groundwater monitoring well, which was located adjacent to the formerly removed underground storage tank (UST). None of the sampling results exceeded ADEC groundwater cleanup levels. |
Joshua Barsis |
7/27/2015 |
Document, Report, or Work plan Review - other |
Reviewed the AA The Shop Subaru Service Monitoring Well Decommissioning Letter Report, dated July 27, 2015. One monitoring well (the only well) was decommissioned on July 23, 2015 in accordance with the approved work plan. |
Joshua Barsis |
7/30/2015 |
Document, Report, or Work plan Review - other |
Reviewed the Harold's Rent-A-Truck Stockpile Sampling Report, dated July 29, 2015. Five soil samples, including a duplicate soil sample, were collected and submitted for analysis of GRO and BTEX. GRO, toluene, and xylenes were present in one or more of the samples up to a maximum concentration of 2.46 mg/kg, 0.0166 mg/kg, and 0.0542 mg/kg, respectively. The ADEC cleanup level for GRO, toluene, and xylenes is 300 mg/kg, 6.5 mg/kg, and 63 mg/kg, respectively. |
Joshua Barsis |
8/3/2015 |
Exposure Tracking Model Ranking |
A new updated ranking with ETM has been completed for source area 78066 1996 UST contamination. |
Joshua Barsis |
8/6/2015 |
Cleanup Complete Determination Issued |
Reviewed the environmental records for the Harold's Rent-A-Truck site. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and this site will be closed. |
Joshua Barsis |