We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
Petroleum Contamination at site. Last staff assigned was Pexton.
Action Information
| Action Date | Action | Description | DEC Staff |
|---|---|---|---|
| 4/18/1996 | Site Added to Database | Petroleum contamination. | Jeff Peterson |
| 4/18/1996 | Site Ranked Using the AHRM | Initial ranking. | Bill Wright |
| 9/9/1997 | Site Ranked Using the AHRM | Site reranked. Changed Environmental/Recreation from 3 to 2. Former score was 28. | Scott Pexton |
| 7/14/1998 | Update or Other Action | Received Draft Site Sampling Plan prepared by CH2MHILL. | Scott Pexton |
| 8/13/1998 | Update or Other Action | Letter sent with comments on draft site sampling plan. | Scott Pexton |
| 9/8/1998 | Update or Other Action | Received Site Sampling Plan prepared by CH2MHILL. | Scott Pexton |
| 9/15/1998 | Site Characterization Workplan Approved | Letter sent with approval of Site Sampling Plan. | Scott Pexton |
| 2/8/1999 | Update or Other Action | Received Draft Remedial Investigation report prepared by CH2MHILL. | Scott Pexton |
| 6/23/1999 | Update or Other Action | Received Final Remedial Investigation Report prepared by CH2MHILL. | Scott Pexton |
| 10/20/1999 | Site Ranked Using the AHRM | Site reranked based on information in the 1999 Remedial Investigation Report. | Scott Pexton |
| 3/12/2004 | Update or Other Action | ADEC received draft Alternate Cleanup Level Demonstration Project. | Beatrice Egbejimba |
| 4/14/2004 | Update or Other Action | File number assigned: 360.38.007. | Sarah Cunningham |
| 6/2/2004 | Update or Other Action | ADEC received Final Interim Removal Action Plan. | Beatrice Egbejimba |
| 7/2/2004 | Update or Other Action | DEC issued a letter stating the following: DEC has completed review of the document titled: Final Interim Removal Action Plan, Federal Scout Armory, Wainwright, Alaska dated March 2004 and offers the following comments. DEC concurs with the general approach of the plan however, can not provide approval to the plan as written. The plan provides a general approach for the excavation, and handling of impacted petroleum contaminated soil but lacks site specific detail for DEC approval under 18 AAC 75. DEC understands that the AKARNG is performing this action to reduce risk to human health and the environment under 18 AAC 75.330, to provide for a partial cleanup at the site and not achieve cleanup levels. It is presumed that information gathered during this interim action will provide data to be used in determining any future actions required for site clean up. In conclusion, DEC has no objection to the interim removal approach provided and will defer any further regulatory decisions until review of the data collected from the site work. | David Pikul |
| 2/7/2005 | Update or Other Action | Staff reviewed the July 2004 final workplan that was recieved Oct 04 for the Alternate Cleanup Level Project. The work plan in general meets requirements. | Debra Caillouet |
| 2/18/2005 | Update or Other Action | A letter was sent to the AKANG providing conditional approval of the workplan. | Debra Caillouet |
| 12/20/2005 | Update or Other Action | Staff prepared significant comments on the draft Interim Removal Action Report for Wainwright FSA and forwarded them to the AKARNG. | Debra Caillouet |
| 5/23/2006 | Update or Other Action | Staff prepared a comment letter on the draft ACL Demonstration Project Report. | Debra Caillouet |
| 5/29/2007 | Cleanup Level(s) Approved | ACL approved based on 3.65% TOC | Debra Caillouet |
| 1/30/2008 | Update or Other Action | Staff review a contamination delineation report and advised the AKARNG of the expected content of a decision document. | Debra Caillouet |
| 5/12/2008 | Update or Other Action | Comments were sent to the AKARNG on the draft corrective action plan. | Debra Caillouet |
| 5/28/2008 | Cleanup Plan Approved | Cleanup plan approved | Debra Caillouet |
| 8/14/2008 | Update or Other Action | Staff reviewed preliminary site cleanup data. | Debra Caillouet |
| 12/3/2008 | Document, Report, or Work plan Review - other | Comments were sent to the Guard on the draft Corrective Action Report | Debra Caillouet |
| 1/5/2009 | Cleanup Complete Determination Issued | The final 2008 cleanup report demonstrates all contamination was removed. | Debra Caillouet |
Contaminant Information
| Name | Level Description | Media | Comments |
|---|---|---|---|
| DRO | < Method 2 Most Stringent | Soil |
Control Type
| Type | Details |
|---|---|
| No ICs Required |
Requirements
| Description | Details |
|---|---|
| Advance approval required to transport soil or groundwater off-site. |
| Document name | File Size | Document Date |
|---|---|---|
| Closure | 146 KB |
No associated sites were found.