Action Date |
Action |
Description |
DEC Staff |
4/3/1991 |
Underground Storage Tank Site Characterization or Assessment |
Site assessment found contamination. |
Robert Weimer |
4/3/1991 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 78056 |
Former Staff |
4/3/1991 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
|
Former Staff |
4/3/1991 |
Site Added to Database |
|
Former Staff |
2/17/1999 |
Leaking Underground Storage Tank Corrective Action Underway |
Additional Corrective Action report submitted. 197.7 tons of contaminated soil was removed. Additional contamination remains in-situ and the extent of the remaining contamination has not been defined. |
Robert Weimer |
2/17/1999 |
Release Investigation |
Partial release investigation conducted during removal of an additional 197.7 tons of contaminated soil. Additional contamination remains in-situ and the extent of the remaining contamination has not been defined. |
Robert Weimer |
4/16/1999 |
Update or Other Action |
ADEC granted request for a 30-day extension to submit a release investigation workplan. |
Former Staff |
12/1/1999 |
Update or Other Action |
Fax from RP (David-McCabe, Dawn Water Co.) stating the release investigation workplan will be submitted soon. |
Robert Weimer |
12/12/1999 |
Update or Other Action |
ADEC again requests release investigation workplan, schedule for conducting the work, and name of consultant to do the work. |
Robert Weimer |
1/10/2005 |
Update or Other Action |
No release investigation workplan has been submitted to date. |
Robert Weimer |
5/29/2008 |
Exposure Tracking Model Ranking |
Site ranked on the new Exposure Tracking Model (ETM). The ETM is a new site ranking system that looks at, based on available data, the potential exposure pathways for the contamination remaining at the site. |
Robert Weimer |
1/10/2011 |
Update or Other Action |
No release investigation workplan has been submitted to date. Need release investigation, possible corrective action, quarterly groundwater monitoring, and confirmation soil samples for closure. |
Robert Weimer |
10/28/2011 |
Update or Other Action |
Still no release investigation workplan has been submitted to date. Need release investigation, possible corrective action, quarterly groundwater monitoring, and confirmation soil samples for closure. |
Robert Weimer |
1/29/2014 |
Update or Other Action |
Project manager changed to Amy Dieffenbacher, transferred to Juneau |
Annie Ariel |
6/20/2014 |
Potentially Responsible Party/State Interest Letter |
PRP Notification Letter mailed. |
Amy Rodman |
6/26/2014 |
Potentially Responsible Party/State Interest Letter |
PRP Notification Letter mailed. |
Amy Rodman |
12/5/2014 |
Update or Other Action |
update site location (latitude and longitude) in ADEC Contaminated Sites Database for ADEC GIS public map of contaminated sites. |
Amy Rodman |
10/22/2015 |
Potentially Responsible Party/State Interest Letter |
Sent interest letter to Potentially Responsible Party, requesting that they contact ADEC and submit a work plan for contamination characterization and/or cleanup. |
Chelsy Passmore |
8/9/2018 |
Site Visit |
ADEC staff conducted a site visit to assess the current condition of the property. The site appeared to be abandoned and the "office" of the former gas station was unoccupied. Parts of the site was overgrown with vegetation, but the concrete pad still exists over most of the site. The drinking water well exists and is in good condition and is currently locked. One other structure exists on the East side of the site, which has an unknown purpose. This building has electric and is locked, but in good condition. |
Chelsy Passmore |
8/10/2018 |
Potentially Responsible Party/State Interest Letter |
State interest letter sent, requesting contact to discuss site. |
Chelsy Passmore |
9/5/2018 |
Update or Other Action |
30 day deadline extension granted via e-mail |
Chelsy Passmore |
2/22/2019 |
Site Characterization Workplan Approved |
The ADEC reviewed the 2019 BGES Site Characterization Workplan and has no objections provided conditions issued in the ADEC February 2019 workplan approval letter are met. |
Chelsy Passmore |
5/3/2019 |
Update or Other Action |
The ADEC reviewed the letter sent from the legal representative of the responsible party. The letter discussed current property ownership and also stated that cost may restrict the site from preforming work in 2019 as outlined in the ADEC approved workplan. The letter detailed ongoing efforts to secure funding for site cleanup through various insurance policies and former site ownership. |
Chelsy Passmore |
12/7/2021 |
Update or Other Action |
The ADEC contacted RPs representative to discuss potential funding sources for additional site work. |
Brandi Tolsma |
7/21/2022 |
Potentially Responsible Party/State Interest Letter |
On this date, Potentially Responsible Party/State Interest Letter issued. |
Brandi Tolsma |