Site Report: Justa Store

Site Name: Justa Store
Address: 446 CHENA PUMP ROAD, Fairbanks, AK 99775
File Number: 100.26.158
Hazard ID: 24974
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 64.847540
Longitude: -147.866070
Horizontal Datum:

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Excavation and removal of two 10,000 gallon gasoline tanks, one 5,000 gallon gasoline tank and related piping in 1998. Tanks were installed in 1983. Benzene exceeded ADEC cleanup levels for migration to groundwater (8.17 mg/kg) and was noted by the contractor to probably extend beyond limits of excavation. Lateral and vertical scope of contamination not determined. The soil samples from the tank excavation (15 bgs) detected GRO up to 584 milligrams per kilogram (mg/kg); toluene up to 50.3 mg/kg; ethylbenzene up to 23.4 mg/kg. Lead was not detected and lead scavengers (1, 2-Dichloroethane (DCA) and Ethylene dibromide (EDB)) were not tested for. Contamination likely from overfill and not a leaking system. A new, separate UST system was installed in 1997 east of the former store.

Action Information

Action Date Action Description DEC Staff
6/29/1992 Site Added to Database Former Staff
6/29/1992 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST Site created in CSP for source area ID 77409 Site assessment of area performed by Shannon & Wilson as part of the Parks Hwy/Chena Ridge interchange. Updated 5/25/06. Former Staff
11/17/1998 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Added to database May 25, 2006. ADEC/Suzzell Shannon Oelkers
11/17/1998 Underground Storage Tank Site Characterization or Assessment Excavation and removal of three USTs and associated piping. Site assessed for GRO, BTEX, and lead. Shannon Oelkers
5/25/2006 Update or Other Action Updated to reflect administrative file. Shannon Oelkers
8/2/2006 Conditional Closure Approved The contaminant levels remaining on site do not exceed the 18 AAC 75.341 Method 2 soil cleanup levels for human health pathways of ingestion and inhalation. Therefore, there is no unacceptable risk to human health via these pathways. The soil samples from the excavation detected GRO, benzene, toluene and ethylbenzene above ADEC cleanup levels for migration to groundwater. Groundwater was not encountered during excavation and no monitoring wells were installed to determine possible impacts. Therefore, there is a data gap on possible impacts to groundwater. However, the area is served by a community water system and restrictions on well installation will be addressed in the site specific conditions. Not all contaminants of concern (e.g. DCA and EDB) were tested for but remedial actions are considered effective in minimizing any unacceptable risk to human health or the environment. The soil contamination remaining on site does not pose an unacceptable risk to human health or the environment provided site specific conditions and/or controls are attached to the property. Shannon Oelkers
8/2/2006 Institutional Control Record Established 1.An Institutional Control will be added to the ADEC Contaminated Sites Database identifying the nature and extent of contamination remaining on site. 2. No groundwater wells may be installed on site without prior ADEC approval. There is no information related to groundwater quality and soil contamination exceeds the migration to groundwater levels which may indicate possible impacts. 3. In accordance with 18 AAC 78.274(b), ADEC approval must be obtained prior to removal and/or disposal of soil or groundwater from this site to an off-site location. Shannon Oelkers
3/29/2011 Institutional Control Compliance Review Performed an IC site review and added follow up requirements starting in August 2011. Evonne Reese
4/24/2014 Update or Other Action Staff name changed from Will Boger to IC Unit. Evonne Reese
5/2/2014 Institutional Control Update An IC reminder letter was issued to the responsible party on this date. Kristin Thompson
1/26/2018 Institutional Control Update Received unofficial ADOT notification that there may be a construction project during summer 2018 in the vicinity of this site, approximately 300 feet away and that dewatering will be required. I will set the reminder system to follow up with ADOT in the spring if we have not received an update on the dewatering discharge permit. Evonne Reese
5/22/2018 Update or Other Action I commented on a DEC Water Division dewatering permit. It is unlikely that contamination from this site will be encountered during the project. Evonne Reese
5/24/2018 Institutional Control Update Received the excavation dewatering authorization from DEC-Water Division for a project happening in the vicinity of this site. The documents have been saved in the electronic site file. Evonne Reese
6/19/2019 Institutional Control Update An Institutional Controls reminder letter mailed to the responsible party/landowner on this date. Mossy Mead
11/20/2019 Institutional Control Update A project is being planned by ADOT&PF during the summer of 2020 where a sound wall on the northeast corner of Dartmouth and Chena Pump Road will be replaced. A representative contacted me about this as part of their environmental planning on how to handle groundwater possibly encountered during the project. I commented that it was unlikely they will encounter contaminated groundwater due to the groundwater depth and also the age of the site record. I did provide the link to the DEC - Storm Water Discharge page which includes information about construction permits which will include the management of groundwater details. Evonne Reese
5/21/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was mailed to the landowner. The next review will be in five years’ time. Gaige Robinson

Contaminant Information

Name Level Description Media Comments
GRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
CS Database Notation And Letter To Landowner/RP

Requirements

Description Details
Groundwater Use Restrictions No groundwater wells may be installed on site without prior ADEC approval. There is no information related to groundwater quality and soil contamination exceeds the migration to groundwater levels which may indicate possible impacts. None
Advance approval required to transport soil or groundwater off-site. In accordance with 18 AAC 78.274(b), ADEC approval must be obtained prior to removal and/or disposal of soil or groundwater from this site to an off-site location. None
Periodic Review Five year review with RP to verify site condtions have not changed.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.