7/12/1997 |
Site Added to Database |
|
Former Staff |
7/12/1997 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST Site created in CSP for source area ID 78015 DRO contaminated soil (14,000 mg/kg) was found during the UST closure process. |
Former Staff |
7/12/1997 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Source Removal. UST removed from the ground 7/12/97. |
Tim Stevens |
2/5/1999 |
Update or Other Action |
ADEC project manager requested the US Air Force conduct a release investigation at the site to find the full extent of the DRO contaminated soil found during the UST closure site assessment. |
Tim Stevens |
1/12/2000 |
Underground Storage Tank Site Characterization or Assessment |
ADEC received the site assessment report. This site is one of 43 UST SA reports contained in the April 1998 Draft " Project Report" Eareckson AS. Final report dated June 11, 1999 and entitled "Project Report - UST Site Assessment Reports, AST Removal Reports, and Environmental Compliance Activities." Associated ADEC/STP comment letter dated January 12, 2000 prepared by Timothy Stevens. ADEC comment letter states that based on information and laboratory data contained in the site assessment reports, tank 3051-9 (ADEC #35) will need to have a release investigation done to determine the vertical and horizontal extent of the contamination found during the closure process. |
Gretchen Pikul |
11/16/2007 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to discuss the plan moving forward for Records of Decision and remedial alternatives. |
Jonathan Schick |
5/8/2008 |
Exposure Tracking Model Ranking |
Intitial Ranking Complete for Source Area: 78015 (Autogenerated Action) |
|
12/1/2010 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 78015 name: 3,000 gallon overflow UST |
Jonathan Schick |
1/6/2012 |
Cleanup Complete Determination Issued |
Contamianted Sites Staff submitted a letter to the USAF Remedial Project Manager stating that the LUST Site Tank 3051-9 will be administratively closed on ADEC's database as the residual contamination from this LUST is within the site bondaries of IRP site ST044 adn the contamianted media will be managed under that site moving forward.
|
Jonathan Schick |
11/21/2014 |
Site Reopened |
This site was administratively closed because it was planned to be managed under site ST044. However, the Record of Decision for site ST044 was signed in February 2014 and did not address Tank 3051-9. Site ST044 is limited to the area immediately surrounding UST 3051-1. |
Jessica Morris |
10/22/2015 |
Update or Other Action |
The ADEC Contaminated Sites Program reviewed and commented on a draft scope of work for investigation, remedial process optimization, and long term management studies at several sites for Eareckson Air Station. |
Jessica Morris |
8/31/2016 |
Site Characterization Workplan Approved |
The ADEC Contaminated Sites Program conditionally approved the 2016 Uniform Federal Policy - Quality Assurance Project Plan (UFP-QAPP) for Site Characterization at 14 Former POL Sites, Eareckson Air Station, Shemya Island, Alaska. The conditions for the UFP-QAPP are as follows: 1) We do not object to the long term monitoring work being completed as outlined in the UFP-QAPP; however ADEC cannot concur that efforts will be counted towards meeting the end point criteria outlined in the decision documents until an adequate monitoring program has been established. 2)The QAPP states that field screening results and field observations will be used to determine additional groundwater monitoring well locations. These locations should to be coordinated with ADEC. 3) The leaking underground storage tank (LUST) sites at Eareckson Air Station will need to be characterized and closed in accordance with LUST regulations that are included in 18 AAC 78. 4) The scope of work for this investigation may not be sufficient to fully characterize the sites listed in the work plan, and additional investigation may be necessary. |
Jessica Morris |
11/14/2016 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 4 days to conduct site visits and become familiar with the ecology and topography of the island. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
11/27/2017 |
Site Visit |
ADEC staff travelled to Eareckson Air Station for 3 days to conduct site visits and institutional control inspections. Site visits were conducted to all pertinent sites and meetings were held to with ADEC and USAF to discuss a path forward for the sites. |
Jessica Morris |
2/23/2018 |
Update or Other Action |
The ADEC Contaminated Sites Program submitted comments on the Draft Site Characterization Report at 13 Former POL Sites, Phase I, Eareckson Air Station, Alaska. |
Jessica Morris |
2/23/2018 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program provide comments on the Draft Site Characterization Report at 13 Former POL Sites, Phase I, Eareckson Air Station. |
Jessica Morris |
5/2/2018 |
Document, Report, or Work plan Review - other |
The ADEC Contaminated Sites Program submitted comments on the Draft Remedial Process Optimization Report for Eareckson Air Station. The purpose of the report was to present an evaluation of the effectiveness of the current selected site remedies and make recommendations for optimization of an island-wide monitoring and management program for contaminated sites at Eareckson. ADEC had numerous comments on the document, and requested a project team meeting to further discuss a more effective and efficient program at Eareckson. |
Jessica Morris |
2/4/2019 |
Site Characterization Workplan Approved |
The ADEC Contaminated Sites Program approved the Final Addendum Addendum Uniform Federal Policy – Quality Assurance Project Plan (UFP-QAPP) for Site Characterization at 13 Former POL Sites, Eareckson Air Station, Sheyma Island, Alaska. The QAPP Addendum was approved with the following conditions: 1)ADEC requests weekly field meetings during the effort. 2)the LUST regulations in 18 AAC 78 still need to be achieved. 3) the scope of work for this effort may not be sufficient to fully characterize the sites, and additional characterization may be necessary.
|
Jessica Morris |
4/27/2022 |
Update or Other Action |
On 4/27/2022 ADEC approved the Eareckson Air Station, Alaska, REMEDIAL PROCESS OPTIMIZATION REPORT dated April 2022.
This Remedial Process Optimization (RPO) Report presents an evaluation of the effectiveness of current selected site remedies and makes recommendations for optimization of the IWM Program, as appropriate to establish a more integrated groundwater monitoring program at Eareckson AS. RPO is a systematic approach for evaluating and improving the effectiveness of site remediation without increasing site risk. This RPO Report presents a site-by-site evaluation of effectiveness of the sites selected remedy and provides recommendations to:
• Streamline groundwater monitoring.
• Develop a holistic approach to site management.
• Maintain the remedial action objectives (RAOs) set forth in established Record of Decisions (RODs) and Decision Documents (DDs).
|