Skip to content Skip to content

Site Report: Alyeska Isabel Pass Construction Camp

Site Name: Alyeska Isabel Pass Construction Camp
Address: Mile 197 Richardson Hwy., Paxson, AK 99737
File Number: 330.38.042
Hazard ID: 2524
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 63.201547
Longitude: -145.511615
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

Site was utilized during construction of Alyeska Pipeline. Observed soil staining in various locations throughout the pad. Suspected buried wastes. ADNR has submitted this site to be assessed using the MOA between ADEC and ADNR. A phase I assessment is planned for 1995 to determine the extent of contamination. (MOA - FY95 = $45K)

Action Information

Action Date Action Description DEC Staff
3/13/1995 Site Added to Database Soil staining. Scott Rose
10/1/1995 Site Characterization Workplan Approved Site investigation workplan was approved and conducted during October 1995. Contamination was identified that warranted additional investigation. Jim Frechione
10/12/1995 Preliminary Assessment Approved Term Contractor (E&E) was contracted to perform a preliminary assessment on this site. Site is a DNR Memorandum of Agreement site. Scott Rose
4/21/1998 Site Ranked Using the AHRM Ranking action added now because it was not added when the site was originally ranked. Bill Petrik
10/1/1998 Site Characterization Report Approved Additional areas of contamination were identified that exceed the most stringent migration to groundwater levels. However, risk based cleanup levels may be applicable due to the remote nature of the site. Jim Frechione
12/8/1999 Update or Other Action ADNR owns and manages the property. They objected to the use of risk based cleanup levels because of the effect higher contaminant levels have on the value of the property. Jim Frechione
12/13/1999 Update or Other Action ADEC letter to Alyeska Pipeline Service Co. regarding need for additional information and request of landowner (ADNR) to require most stringent cleanup levels. ADEC requests Alyeska intentions on this matter. Jim Frechione
1/8/2001 Update or Other Action ADEC received a letter from Alyeska. IT completed a soil boring at the Isabel Pass Camp to confirm the depth to groundwater. According to the soil boring logs that were submitted with the letter, no groundwater was found down to 50' below ground surface. Deborah Williams
1/12/2001 Institutional Control Record Established Institutional Controls Established for the site. Deborah Williams
1/12/2001 Conditional Closure Approved ADEC issued a no further remedial action on this site. Alyeska paid for additional sampling in order to receive a NFRAP determination. The fact that no groundwater was detected 0 - 50' below ground surface, was applied to the October 2000 soil attenuation model using the maximum soil contamination identified at the site. It was concluded that the soil contaminant concentrations would not pose a risk to groundwater and other possible pathways (ingestion and inhalation). Deborah Williams
11/5/2003 Update or Other Action Changed Justification to "N" because the site is in NFRAP Status. Former Staff
12/1/2011 Update or Other Action The current project manager chose to retain management of this site with the Cleanup Complete Determination that has Institutional Controls. Kristin Thompson
11/12/2013 Update or Other Action Staff changed from Linda Nuechterlein to IC Unit. Kristin Thompson
3/2/2016 Institutional Control Compliance Review IC compliance review conducted. Scheduled to send an IC reminder letter in the near future. Nathan Maxwell
4/13/2017 Institutional Control Compliance Review Follow-up IC compliance review conducted. Contacted ADNR to verify the current lessee of this property. Will issue a reminder letter once the lessee is confirmed. Reminder system set to check back in two months. Kristin Thompson
6/25/2019 Institutional Control Compliance Review IC compliance review completed and a reminder letter was issued to Alyeska Pipeline Services Company and the DNR Pipeline Coordinator was copied. The next IC review will be in five years' time. Evonne Reese
7/9/2019 Institutional Control Compliance Review Received an IC confirmation letter from the responsible party acknowledging the IC requirements. All ICs are in compliance. Mossy Mead
6/28/2024 Institutional Control Compliance Review IC compliance review completed on this date. An IC reminder letter was issued to the responsible party and cc’d to the landowner. The next review will be in five years’ time. Gaige Robinson
9/25/2024 Institutional Control Compliance Review The landowner responded to the IC reminder letter and provided a written confirmation that land use has not changed Gaige Robinson

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
CS Database Notation And Letter To Landowner/RP

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site. Standard condition.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) Standard condition.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.