Skip to content Skip to content

Site Report: NPS Denali Nat'l Park HQ Bldg 34

Site Name: NPS Denali Nat'l Park HQ Bldg 34
Address: Headquarters Building 34, Denali Park, AK 99755
File Number: 220.38.017
Hazard ID: 25283
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 63.720757
Longitude: -148.962337
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

The National Park Service performed over-excavation and remediation of contaminated soils associated with the fuel oil AST and associated distribution lines. Approximately 60 cubic yards of DRO contaminated soil were excavated from the site of the single wall AST and its associated piping. Contamination was sporadic, therefore the frequency of the field screening was increased from one event for every 5 cubic yards to every cubic yard of soil removed. When the limit of excavation was reached, confirmation samples were taken from each side wall and one from the floor of the excavation. One wall sample at the interface with the asphalt drive way had a confirmation sample of DRO of 2000 mg/kg. All other soils were clean.

Action Information

Action Date Action Description DEC Staff
12/1/2008 Site Added to Database A new site has been added to the database Mitzi Read
1/25/2010 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78622 name: Building 34 AST Melody Debenham
5/23/2012 Site Visit Performed a site visit at the C-Camp Auto Shop site and the C Camp Emergency Services/Fire Management Building site in Denali National Park & Preserve. National Park Service (NPS) staff gave us a tour of the C-Camp sites, sites in the Headquarters area and the Hotel Powerhouse site. At the C-Camp site we observed drilling and soil sampling for the installation of a monitoring well. Melody Debenham
8/17/2012 Conceptual Site Model Submitted Received conceptual site model (CSM) for Building 34. The CSM identifies direct contact with contaminants in soil inhalation of outdoor and indoor air as potentially complete pathways. Melody Debenham
1/17/2013 Document, Report, or Work plan Review - other Approved the final 2012 Denali Headquarters Building 27, 28, and 34 Vapor Intrusion Assessment Report. As part of the vapor intrusion assessment, consultants for the NPS performed a building survey at Building 27 and interviewed NPS staff and building residents. During the building survey it was discovered that all three buildings have operating radon mitigation systems in place, which effectively controls the vapor intrusion pathway. Melody Debenham
9/30/2014 Potentially Responsible Party/State Interest Letter Potentially responsible party letter sent to the National Park Service. Melody Debenham
2/14/2017 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 78622 Building 34 AST. Melody Debenham
8/31/2017 Institutional Control Record Established Institutional Controls established and entered into the database. Gretchen Caudill
8/31/2017 Cleanup Complete Determination Issued Gretchen Caudill
5/30/2018 Institutional Control Compliance Review IC compliance review conducted. Staff changed from Gretchen Caudill to IC Unit. Closure/IC Details updated to reflect the 2017 Decision Document. Reminder system set to follow-up every three years. Kristin Thompson

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil Confirmation soil samples from the excavation detected DRO at 2,000 mg/kg at 6.5 feet below ground surface

Control Type

Type Details
Federal or State Agency GIS Database Note Identification of the location of remaining soil and groundwater contamination on the NPS GIS database and use of the internal NPS planning process for all projects that directs the user to the GIS database to determine if contamination is present within the project area.

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site. Standard condition.
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) Standard condition.
Excavation / Soil Movement Restrictions A requirement that proper field screening and characterization be conducted during any soil excavation, digging, or trenching in the areas where residual soil contamination exists and that any contaminated soil encountered be managed in accordance with regulations applicable at that time.
Groundwater Use Restrictions A restriction on installing groundwater wells or using groundwater from the site without prior DEC approval.
Other Standard condition.
Periodic Review ADEC will conduct a review of site conditions every three years.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.