Site Report: Maniilaq Association Family Crisis Center - Kotzebue
Site Name: | Maniilaq Association Family Crisis Center - Kotzebue |
---|---|
Address: | 668 Caribou Drive, Kotzebue, AK 99752 |
File Number: | 410.38.024 |
Hazard ID: | 25371 |
Status: | Active |
Staff: | Laura Jacobs, 9074512911 laura.jacobs@alaska.gov |
Latitude: | 66.898801 |
Longitude: | -162.577507 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
On 2/12/2008 ~300 gallons of diesel fuel were released from an aboveground heating oil tank at the Maniilaq Assocition Family Crisis Center (aka Women's Shelter), because of a broken 1/2 inch steel fuel line due to differential settling of the building and tank. Initial cleanup efforts were conducted by the responsible party without the assistance of an environmental consultant. Contaminated soil was excavated and bagged at an off-site location (Senior Center on Wolverine Drive; lat/lomg: 66.898189, -162.582370; datum: WGS84). Diesel range organics (DRO) and gasoline range organics (GRO) remain above cleanup levels.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
3/3/2009 | Spill Transferred from Prevention Preparedness and Response Program | Site transferred by PERP staff John Ebel. Spill no. 08389904301; spill date = 2/12/08; quantity = ~300 gallons; substance = diesel; PERP file no. 410.02.031. | Mitzi Read |
3/9/2009 | Site Added to Database | A new site has been added to the database | Mitzi Read |
3/9/2009 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 78733 name: ~300-gallon Release - AHOT Fuel Line | Mitzi Read |
4/15/2009 | Potentially Responsible Party/State Interest Letter | PRP and report review/informational request letter sent to Maniilaq Association. | Jim Fish |
2/16/2010 | Update or Other Action | Changed DEC project manager from Tamara Cardona-Marek to James Fish. | Janice Wiegers |
6/16/2010 | Document, Report, or Work plan Review - other | PERP approved a workplan for consultant to screen and sample 27 super-sacs of excavated soil from the spill, to determined suitability for landfill acceptance. | Jim Fish |
6/23/2010 | Document, Report, or Work plan Review - other | Reviewed PERP-approved work plan for super-sac soil screening; will coordinate with consultant on progress. | Jim Fish |
11/6/2014 | Potentially Responsible Party/State Interest Letter | A new information request/PRP letter sent to RP for site update. | Jim Fish |
11/25/2014 | Update or Other Action | Received a call from Maniilaq Association Maintenance Director who will look into records for past cleanup actions taken on the site. Super Sacs of contaminated soils were previously sent off-site. | Jim Fish |
11/25/2014 | Update or Other Action | Received brief letter from Maniilaq Association who searched available records and found that 42 super sacs of petroleum contaminated soil was disposed of at the Kotzebue landfill, and that there is no further knowledge of outstanding contamination issues associated with parcel. A new 320 sq ft meeting room building was constructed on the site in 2014. A new 500-gallon double-walled HHOT was installed in 2011. | Jim Fish |
6/29/2016 | Update or Other Action | Sent letter to RP requesting additional information with a response deadline of September 30. | Laura Jacobs |
1/26/2018 | Meeting or Teleconference Held | ADEC staff spoke with Maniilaq staff regarding additional work needs for site progress. | Laura Jacobs |
7/2/2018 | Update or Other Action | ADEC staff sent a letter to Maniilaq Association and Maniilaq Health Center to request site characterization by 90 days - September 27, 2018 | Laura Jacobs |
5/30/2019 | Update or Other Action | ADEC staff spoke with the environmental consultant that will be conducting site characterization work at another site in Kotzebue, for the IHS BIA site and wanted to gain more information on the Family Crisis Center site in case additional work could be conducted at the same time. | Laura Jacobs |
7/31/2019 | Document, Report, or Work plan Review - other | ADEC staff reviewed a draft work plan for site characterization efforts to be completed the first week of August. The work plan was approved with revisions. | Laura Jacobs |
8/1/2019 | Document, Report, or Work plan Review - other | ADEC staff reviewed a revised version (version 1) of the work plan for site characterization efforts at the Maniilaq Association Family Crisis Center. Five sample pits are planned to be field screened, with three or more analytical samples for Gasoline Range Organics (GRO), Diesel Range Organics (DRO), and benzene, toluene, ethylbenzene, and xylenes (BTEX). If contamination is found based upon field screening and odor or sheening, the sampler will step out to sample another sample pit until it is determined they have found the extent of contamination. Three temporary well points will be installed in the sample pits with the highest screening numbers and sampled for groundwater. | Laura Jacobs |
11/26/2019 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 78733 ~300-gallon Release - AHOT Fuel Line. | Laura Jacobs |
Contaminant Information
Name | Level Description | Media | Comments |
---|
Control Type
Type | Details |
---|
Requirements
Description | Details |
---|