Site Report: BPX Southeast Eileen State 1 & 2

Site Name: BPX Southeast Eileen State 1 & 2
Address: 1.5 Miles East of Pad 37, Prudhoe Bay, AK 99734
File Number: 300.38.283
Hazard ID: 25389
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 70.265600
Longitude: -149.022500
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

2000 soil sample contained DRO at 2,330 mg/kg.

Action Information

Action Date Action Description DEC Staff
4/8/2009 Site Added to Database A new site has been added to the database Mitzi Read
4/9/2009 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78751 name: Historic diesel contamination Bill O'Connell
4/10/2009 Site Characterization Workplan Approved Received Phase II Site Assessment Work Plan Southeast Eileen State 1&2. Most of the pad was removed during a crude oil cleanup in 1991, but patches of gravel remain. Two wells were drilled at the site, Southeast Eileen State 1 which was P&A’d in 1969, and a sidetrack well, Southeast Eileen State 2 which was P&A’d in 1991. The primary background investigation occurred in 2000 with a visual inspection and discrete soil and surface water samples. DRO was detected up to 2,330 mg/kg in soil samples. The 2009 investigation will include 6 boreholes in the former gravel pad areas with additional boreholes in the reserve pit and flare pit. Samples will be analyzed for DRO/RRO with about 25% of the samples also analyzed for BTEX. Additional site inspection will occur later in 2009. Bill O'Connell
11/2/2009 Document, Report, or Work plan Review - other Reviewed SE Eileen Phase II and Corrective Action Plan. Phase II sampling was primarily focused on the former reserve pits. One tundra sample contained DRO at 617 mg/kg, but neither this area, nor the contaminated area identified in 2000, are going to be addressed during the corrective action. Bill O'Connell
11/16/2009 Exposure Tracking Model Ranking A new updated ranking with ETM has been completed for source area 78751 Historic diesel contamination. Bill O'Connell
11/24/2009 Cleanup Complete Determination Issued The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with BP Exploration (Alaska) Inc. (BPX) Southeast (SE) Eileen State 1 & 2 located near Prudhoe Bay, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and this site will be closed. Bill O'Connell
9/21/2010 Site Visit Site visit with BPXA and consultant Bill O'Connell

Contaminant Information

Name Level Description Media Comments
DRO Other Soil

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.