Site Report: Alyeska PS 05 Turbine Fuel Spill
Site Name: | Alyeska PS 05 Turbine Fuel Spill |
---|---|
Address: | Mile 137 Dalton Highway, Coldfoot, AK 99701 |
File Number: | 330.38.120 |
Hazard ID: | 25440 |
Status: | Cleanup Complete - Institutional Controls |
Staff: | IC Unit, 9074655229 dec.icunit@alaska.gov |
Latitude: | 66.813056 |
Longitude: | -150.665028 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
On March 25, 2009, Alyeska personnel noticed smoke and observed discoloration of snow at the Solar™ generator. Turbine fuel, which is used to power these generators, was observed leaking from the Solar™ generator enclosure onto the snow covered ground. The spill volume was estimated by Alyeska to be 15 gallons. The following month, Alyeska excavated contaminated soil but impacted soil beneath and directly adjacent to the Solar™ generator was not excavated because removal of this soil would have undermined the footings. Confirmation samples were collected with concentrations up to 0.386 mg/kg benzene, 10.7 mg/kg toluene, 21.7 mg/kg ethylbenzene, 141.2 mg/kg xylenes, 1,560 mg/kg GRO, 4,060 mg/kg DRO, and 26,000 mg/kg RRO.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
7/29/2009 | Spill Transferred from Prevention Preparedness and Response Program | Spill transferred by PERP staff John Ebel. Spill number = 09309908401; spill date = 3/25/09; substance = turbine fuel; quantity = ~20 gallons. | Mitzi Read |
8/4/2009 | Site Added to Database | A new site has been added to the database | Mitzi Read |
9/22/2009 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 78803 name: Alyeska PS 05 Turbine Fuel Spill based on concentration information in site description alone. | Keather McLoone |
10/26/2009 | Document, Report, or Work plan Review - other | Completed review of report turned over from PERP. Review included laboratory review checklist. Earlier review had been conducted to determine only that this was a candidate for CC with ICs and that the work was generally conducted according to regulation. Impacted soil beneath and directly adjacent to the Solar generator was not excavated because this would have undermined the building's footings. Approximately 36 cubic yards of soil were removed for transportation at OIC. 29 soil samples were collected and field screened using PID. Ten soil samples were sent to the laboratory for analytical confirmation. Extent of potentially accessible contamination deminimis. | Keather McLoone |
10/28/2009 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 78803 Alyeska PS 05 Turbine Fuel Spill. | Keather McLoone |
11/12/2009 | Institutional Control Record Established | Institutional Controls established and entered into the database. | Keather McLoone |
11/12/2009 | Cleanup Complete Determination Issued | The Alaska Department of Environmental Conservation, Contaminated Sites Program (ADEC) has completed a review of the environmental records associated with Alyeska PS 05 Turbine Fuel Spill site located near Coldfoot, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required as long as the site is in compliance with established institutional controls. | Keather McLoone |
12/1/2011 | Update or Other Action | The current project manager chose to retain management of this site with the Cleanup Complete Determination that has Institutional Controls. | Kristin Thompson |
11/12/2013 | Institutional Control Compliance Review | IC compliance review conducted and staff changed from Linda Nuechterlein to IC Unit. Reminder system set-up to follow-up with the responsible party in late 2014. | Kristin Thompson |
1/2/2015 | Institutional Control Update | An IC reminder letter was issued to the responsible party on this date. | Kristin Thompson |
2/2/2015 | Institutional Control Update | The responsible party responded to ADEC's Institutional Controls reminder letter. The site remains in compliance with all institutional controls. There have been no changes in land use or ownership since the 2009 Record of Decision was issued. | Kristin Thompson |
3/19/2018 | Institutional Control Periodic Reporting | Received the 5-year ICs reporting letter. The generator shed remains intact, accessibility to contaminated soil remains unchanged, no movement or use of contaminated material has occurred, and there have been no changes in land use or ownership at the site. Reminder system re-set for the next 5-year reporting that will be due in 2023. | Kristin Thompson |
6/20/2018 | Institutional Control Compliance Review | IC compliance review conducted. Closure/IC Details updated. | Kristin Thompson |
9/29/2023 | Institutional Control Compliance Review | Received confirmation from Alyeska that there have been no land use changes and they are complying with all IC requirements. | Evonne Reese |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
BTEX | > Human Health/Ingestion/Inhalation | Soil | original spill volume was estimated to be 15 gallons and then 36 cubic yards of accessible contamination removed - extent of contamination is considered de minimis |
GRO | > Human Health/Ingestion/Inhalation | Soil | original spill volume was estimated to be 15 gallons and then 36 cubic yards of accessible contamination removed - extent of contamination is considered de minimis |
RRO | > Human Health/Ingestion/Inhalation | Soil | original spill volume was estimated to be 15 gallons and then 36 cubic yards of accessible contamination removed - extent of contamination is considered de minimis |
Control Type
Type | Details |
---|---|
Signed CS Determination |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | Standard condition. |
When Contaminated Soil is Accessible, Remediation Should Occur | Soil contamination is remaining under the generator shed. When the building is removed and/or the soil becomes accessible, the soil must be evaluated and contamination addressed in accordance with an ADEC approved work plan. |
Other | Alyeska shall report to ADEC every five years to document land use, or report as soon as they become aware of any changes in land ownership and/or use. |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) | Standard condition. |
No associated sites were found.