Skip to content Skip to content

Site Report: Alyeska VMT West Metering Building

Site Name: Alyeska VMT West Metering Building
Address: Valdez Marine Terminal, Valdez, AK 99686
File Number: 1200.38.057
Hazard ID: 25525
Status: Cleanup Complete - Institutional Controls
Staff: IC Unit, 9074655229 dec.icunit@alaska.gov
Latitude: 61.084500
Longitude: -146.400000
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

On November 20, 2009, crude oil-contaminated soil was discovered during a construction project beneath the pipe headers at the West Metering Building at the Valdez Marine Terminal. An immediate response was conducted and additional effort is planned for 2010. This is believed to be a historic release.

Action Information

Action Date Action Description DEC Staff
6/17/2010 Document, Report, or Work plan Review - other Receipt of Valdez Marine Terminal West Metering Spill Remediation Workplan. Excavation will be guided by screening. Confirmation samples will be collected and analyzed for GRO/DRO/RRO and VOCs as well as 10 percent for PAHs. Keather McLoone
6/18/2010 Spill Transferred from Prevention Preparedness and Response Program Assigned PERP staff: John Engles. Spill no. 09229932401; spill date = 11/20/09; substance = crude oil; quantity = unknown. Mitzi Read
6/21/2010 Site Added to Database A new site has been added to the database Mitzi Read
7/12/2010 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78916 name: potential crude, diesel, gas Keather McLoone
8/13/2010 Update or Other Action Receipt via email of photos from PERP staff (Engles) of ongoing cleanup efforts. Keather McLoone
11/29/2010 Document, Report, or Work plan Review - other Date of receipt of Valdez Marine Terminal West Metering Spill Remediation Report. Review included Laboratory Data Review Checklist. In July and August of 2010, about 238 cubic yards of contaminated soil was removed. Extent of excavation was limited by bedrock. One confirmation sample exceeded ADEC most conservative criteria. Benzene was found at 0.148 mg/kg. Aquazyme was added to the excavation before it was backfilled. Prior to excavation, test pits were advanced to determine the extent of contamination and to further characterize the site. There were data quality issues with benzo(a)pyrene and anthracene, however a request for additional information from the laboratory showed that MS/MSD non-client samples had acceptable recoveries for these compounds. Also, downgradient surface water monitoring has not detected these compounds (groundwater daylights repeatedly as surface water before leaving the VMT). Also, methylene chloride was reported by the laboratory in some test pit samples as above the DL but below the LOQ and therefore was J flagged as an estimated result. The laboratory is currently not able to meet our cleanup levels and these results are above cleanup levels but not likely to really be COPCs. These factors in combination with the fact that the confirmation samples were also mostly non-detect, some present at very low levels and only one above the most conservative criteria for benzene only - leads me to conclude that this site may still be a candidate for a CC with ICs. Keather McLoone
1/10/2011 Cleanup Complete Determination Issued Contaminated Sites staff has completed a review of the environmental records associated with Alyeska VMT West Metering Building site located at the Valdez Marine Terminal in Valdez, Alaska. Based on the information provided to date, it has been determined that the contaminant concentrations remaining on site do not pose an unacceptable risk to human health or the environment and no further remedial action will be required as long as the site is in compliance with established institutional controls (ICs). Keather McLoone
1/12/2011 Institutional Control Record Established Institutional Controls established and entered into the database. Keather McLoone
12/1/2011 Update or Other Action The current project manager chose to retain management of this site with the Cleanup Complete Determination that has Institutional Controls. Kristin Thompson
1/14/2013 Institutional Control Periodic Reporting Alyeska continued to use this facility as of 1/14/2013, so assumptions of site closure have not changed. Richard Bernhardt
11/6/2013 Institutional Control Compliance Review Staff changed from Richard Bernhardt to IC Unit. IC compliance review conducted. Reminder system set-up to follow-up with the responsible party in 2016. Kristin Thompson
1/7/2016 Institutional Control Compliance Review We received verification from Alyeska Pipeline Service Company in writing that land use for this property has not changed. The reminder system has been set to do another compliance review in 2021. Evonne Reese
2/5/2021 Institutional Control Update We received verification from Alyeska Pipeline Service Company in writing that land use for this property has not changed. The reminder system has been set to do another compliance review in 2026. Evonne Reese
2/5/2021 Institutional Control Compliance Review IC compliance review completed. All IC requirement are being complied with by the responsible part. Evonne Reese

Contaminant Information

Name Level Description Media Comments
Benzene Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil

Control Type

Type Details
Signed CS Determination
Other

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close