Site Name: | Manley Village Council Clinic & Washeteria |
---|---|
Address: | Elliott Highway; 1 Mile East of Manley Hot Springs, Manley Hot Spgs, AK 99756 |
File Number: | 180.38.005 |
Hazard ID: | 25559 |
Status: | Active |
Staff: | Jamie McKellar, 9074515175 jamie.mckellar@alaska.gov |
Latitude: | 65.006632 |
Longitude: | -150.590941 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
On May 7, 2010 ADEC received a spill report stating a 300-gallon release of diesel had occurred as a result of an overfilled aboveground day tank at the Manley Village Council (MVC) Clinic & Washeteria. On May 11, 2010, ADEC and Shannon & Wilson responded to the heating oil spill. ADEC assisted the MVC with the excavation of ~120 cubic yards of diesel-contaminated soil, some of which was temporarily staged at the west end of the landfill and some on-site near the MVC shop. During excavation activities, deeper contamination was discovered in and below the frozen silt layer, likely the result of historic spills. Results of the sample taken from the on-site drinking water well on 5/11/2010 revealed benzene was present above the ADEC cleanup level. Due to the unanticipated volume of contaminated soil and water, and issues with the placement of the biocell at the landfill, excavation activities were halted on 5/13/2010 to re-evaluate the plan for corrective action. On 5/13/2010 DEC staff attended an emergency community meeting to resolve land use issues regarding the biocell at the landfill. On 7/13/2010 ADEC and Shannon & Wilson returned to Manley to finish the biocell construction and excavation. In addition to the contaminated soil from the May 7, 2010 heating oil release, the biocell also contained a small amount of soil excavated from a leak originating at the generator shed on site. ADEC Prevention and Emergency Response Program (PERP) staff will continue to manage the biocell.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
9/1/2010 | Spill Transferred from Prevention Preparedness and Response Program | Spill transferred by PERP staff Brian Jackson. Spill no. 10309912701; spill date = 5/7/10; substance = diesel; quantity = ~300 gallons; PERP file no. 180.02.002. | Mitzi Read |
9/16/2010 | Site Added to Database | A new site has been added to the database | Mitzi Read |
12/27/2010 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 78950 name: Day Tank Overfill | Mitzi Read |
12/17/2013 | Update or Other Action | Received bio-cell sampling results. All soil samples were below the most stringent cleanup level for DRO and BTEX. (M.Hooper) | Willett Boger |
7/5/2014 | Update or Other Action | Received report with design of groundwater pump and treat system. (M.Hooper) | Willett Boger |
7/11/2014 | Update or Other Action | Technical Memorandum received from consultant on an update to the protective remediation system modifications made. | Willett Boger |
4/1/2015 | Update or Other Action | Discussed status of remediation system and maintenance procedures with consultant. Ongoing maintenance and sampling of treated water as well as sampling of well water is in question. | Willett Boger |
4/7/2015 | Update or Other Action | Received confirmation of the location of contaminated stockpile from excavations to install the well water remediation system. | Willett Boger |
7/17/2015 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 78950 Day Tank Overfill. | Willett Boger |
8/2/2017 | Update or Other Action | Mailed letter with October 31 deadline for update on status of soil and groundwater remediation, drinking water sampling, and cleanup plans. | Michael Hooper |
9/4/2019 | Site Visit | Conducted Site visit to evaluate current site conditions, no staining or surface contamination was seen. ADEC will contact geophysical consultant about well water samples. | Michael Hooper |
10/17/2022 | Update or Other Action | Site assigned to Alyssa Wood | Alyssa Wood |
Contaminant Information
Name | Level Description | Media | Comments |
---|
Control Type
Type | Details |
---|
Requirements
Description | Details |
---|
There are no documents for this site report.
No associated sites were found.