We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

In September 2009 a 500-gallon unregistered underground gasoline tank was removed from the property at 1952 Ada Street. Soil samples were analyzed for gasoline range organics (GRO) and benzene, toluene, ethylbenzene, and xylenes (BTEX) and none of the results were detected above cleanup levels. Groundwater samples were collected and analyzed for GRO, BTEX, volatile organic compounds (VOCs) and lead. Benzene, ethylbenzene, xylenes, naphthalene, and GRO were detected above current DEC cleanup levels in groundwater. Additional monitoring wells were installed up- and down- gradient of the source area, samples from these wells were collected and analyzed for GRO and BTEX and no results were detected above DEC cleanup levels.

Action Information

Action Date Action Description DEC Staff
10/23/2009 Update or Other Action Site Assessment Report completed by Nortech. Janice Wiegers
9/14/2010 Spill Transferred from Prevention Preparedness and Response Program Spill transferred by PERP staff Tom DeRuyter. Spill no. 09309924801; substance = gasoline; quantity = unknown; PERP file no. 102.02.001. Mitzi Read
9/15/2010 Site Characterization Workplan Approved DEC reviewed and approved workplan submitted by Nortech for stockpile and groundwater characterization. DEC requested sampling for EPA method 8260 to check for lead scavengers in the soil and groundwater. Janice Wiegers
9/15/2010 Document, Report, or Work plan Review - other DEC reviewed Nortech's Stockpile and Groundwater Characterization report, dated september 13, 2010. Janice Wiegers
9/20/2010 Site Added to Database A new site has been added to the database Mitzi Read
9/20/2010 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 78952 name: Unregistered Gasoline UST Mitzi Read
3/4/2011 Document, Report, or Work plan Review - other Received groundwater assessment report from Nortech Environmental. Three monitoring well points have been installed at the site. Benzene was the only contaminant in the groundwater exceeding cleanup levels during the 9/24/10 sampling event. This exceedence was in MW#-1, the well placed in the former excavation. Lead was detected in the soil stockpiled soil, but was below cleanup levels. Janice Wiegers
11/17/2011 Update or Other Action The UST Program reviewed the site assessment report and determined this tank should have been a regulated UST. A new UST facility was added to the UST database, and this LUST site was associated with that facility. Janice Wiegers
11/17/2011 Leaking Underground Storage Tank Release Confirmed - Petroleum LUST site created in CSP database for source area Unregistered Gasoline UST, 78952 Janice Wiegers
11/18/2011 Update or Other Action Emailed Robert Gerondale about possibility of conditional closure. Janice Wiegers
11/30/2011 Potentially Responsible Party/State Interest Letter Sent state interest letter to CMI in Anchorage. Nortech called and said CMI is planning to collect water samples this year from this site and the injection well site at 1949 Ada Street. CMI is discussing whether they would like to continue monitoring until a cleanup complete can be obtained, or request a conditional closure with monitoring requirements. Janice Wiegers
12/22/2011 Leaking Underground Storage Tank Cleanup Initiated - Petroleum Adminstrative action addition for grant reporting purposes. Evonne Reese
3/7/2014 Update or Other Action DEC met with Nortech. Nortech indicated ground water samples were collected 12/2012. Report will be submitted by April. Laurel Gale
5/3/2017 Update or Other Action Emailed consultant to check on status of overdue monitoring report. Janice Wiegers
4/26/2019 Workplan Requested DEC sent correspondence requesting site characterization work plan by June 15, 2019. Megan Roberts
7/8/2019 Update or Other Action Deadline for site characterization workplan was extended to July 13, 2019. Megan Roberts
7/11/2019 Document, Report, or Work plan Review - other DEC accepted and reviewed the March 2012 Groundwater Sampling Results report in lieu of a site characterization work plan. The report describes groundwater sampling results that took place in the spring of 2012. All contaminants were below cleanup levels and previously, there were three fall annual sampling events that showed decreasing contaminant concentrations. Megan Roberts
12/20/2019 Document, Report, or Work plan Review - other Sent letter commenting on the March 2012 Groundwater Sampling Results submitted by NORTECH on July 11, 2019. Requested work plan for additional groundwater sampling to analyze for GRO, BTEX, PAHs, and VOCs. Rebekah Reams
6/30/2021 Workplan Requested DEC sent correspondence to Construction Machinery Inc. (via email and mail) requesting a work plan to collect and analyze a groundwater sample from MW-1 for GRO, BTEX, PAHs, and VOCs be submitted by a deadline of August 15, 2021. Rebekah Reams
8/25/2021 Workplan Requested DEC sent correspondence to Construction Machinery Inc. (via email and mail) requesting a work plan to collect and analyze a groundwater sample from MW-1 for GRO, BTEX, PAHs, and VOCs be submitted by a deadline of August 15, 2021. Rebekah Reams
9/3/2021 Update or Other Action DEC received a response to the June 30th, 2021 and August 25th, 2021 correspondence. The responsible party and their consultant will submit a proposed approach for the site to DEC by September 10th, 2021. Rebekah Reams
11/21/2024 Workplan Requested DEC requested a work plan to sample the existing monitoring well MW-1 for GRO, PAH, and VOC (including BTEX) analysis to confirm contaminant concentrations are below DEC cleanup levels prior to site closure be submitted to DEC for review by a deadline of December 20, 2024. Rebekah Reams

Contaminant Information

Name Level Description Media Comments

Control Type

Type Details

Requirements

Description Details

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.
Continue     Close