Site Report: Commercial Property - 9351 Glacier Highway

Site Name: Commercial Property - 9351 Glacier Highway
Address: 9351 Glacier Highway, Juneau, AK 99801
File Number: 1513.38.084
Hazard ID: 25608
Status: Cleanup Complete
Staff: No Longer Assigned, 9074655229 dec.icunit@alaska.gov
Latitude: 58.366367
Longitude: -134.591250
Horizontal Datum:WGS84

We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.

Problems/Comments

On or about 11/10/2010, a release of diesel fuel from an aboveground heating oil tank system occurred at 9351 Glacier Highway. At the time of the release the building was occupied by a hair and nail salon. Diesel range organics (DRO) were dectected above cleanup levels in surface soil. About a cubic yard of sandy contaminated soil was removed from the site and taken to Bicknell Construction for incorporation into asphalt. The two original soil samples were taken after excavation.

Action Information

Action Date Action Description DEC Staff
2/10/2011 Spill Transferred from Prevention Preparedness and Response Program Spill transferred by PERP staff Sarah Moore. Spill no. 10119931401; spill date = 11/10/10; substance = diesel; quantity = ~150 gallons; source = fuel filter and damaged compression fitting on line from aboveground heating oil tank system. Mitzi Read
2/11/2011 Site Added to Database A new site has been added to the database Mitzi Read
2/11/2011 Exposure Tracking Model Ranking Initial ranking with ETM completed for source area id: 79041 name: Heating Oil AST System - Diesel Mitzi Read
4/29/2011 Site Visit Site visit with PERP Representative to become familiar with site. No oil sheen noted on pavement or a diesel smell detected. It was also noted that the site and parking lot run off flows away from Duck Creek. Erik Norberg
8/29/2011 Cleanup Complete Determination Issued Remediation complete at this site. Cleanup complete determination issued. Erik Norberg
8/29/2011 Institutional Control Record Established Institutional Controls established and entered into the database. Erik Norberg
9/11/2013 Update or Other Action Staff changed from Erik Norberg to Denise Elston. Kristin Thompson

Contaminant Information

Name Level Description Media Comments
DRO Between Method 2 Migration to Groundwater and Human Health/Ingestion/Inhalation Soil A small amount of heating fuel contamination remains underneath the foundation stem wall of the building, but this layer of soil is de minimis and could not be excavated without undermining the foundation.

Control Type

Type Details
No ICs Required

Requirements

Description Details
Advance approval required to transport soil or groundwater off-site.

No associated sites were found.

Missing Location Data

Because the GIS location data for this site has not been entered, we cannot direct you to its position on the map. Click "Continue" to proceed to the Contaminated Sites Web Map or "Close" to return to the site report.