5/20/2009 |
Document, Report, or Work plan Review - other |
DEC received and reviewed UST Site Assessment/Release Investigation/Corrective Action Plan (SA/RI/CAP) for the FNSB School District Areawide UST Improvements Project/Contract No. 08-SDGPRJ-01, prepared by Independent Consultants Associated (ICA). (MBarnes) |
Janice Wiegers |
6/3/2009 |
Update or Other Action |
DEC provided ICA comments and regulatory reminders for the SA/RI/CAP. (MBarnes) |
Janice Wiegers |
5/27/2010 |
Leaking Underground Storage Tank Cleanup Initiated - Petroleum |
Soil and groundwater contamination was found during UST removal. (MBarnes) |
Willett Boger |
6/7/2010 |
Site Visit |
DEC met with ICA, FNSB, and GNI to discuss limits of removing contaminated soil due to proximity of permanenant features. (MBarnes) |
Janice Wiegers |
11/30/2010 |
Document, Report, or Work plan Review - other |
DEC received Badger Elementary School Facility ID #3498 8,000-Gallon Diesel Underground Storage Tank Site Assessment/Tank Closure Report dated Nov 2010, prepared by ICA.
The tank system was removed and recycled "as is" for future use. Approximately 245 cy of diesel contaminated soil and approximately 233 gallons of diseil contaminated water were removed and tranported to OIT for thermal remediation. Approximately 2-4 cy of contaminated soil (2,260 mg/kg) remains in the excavation, 3 to 5 feet bgs; soil could not be removed without jeopardizing the transformer. A shallow groundwater monitoring well (MW-1) was installed adjacent to the new tank. Clean (below ADEC cleanup levels) stockpiled soil may remain on site. (MBarnes) |
Willett Boger |
6/3/2011 |
Update or Other Action |
DEC sent a letter to Borough commenting on work completed on LUST removal project. Addition characterization and release investigation needed to define extent of soil and ground water contamination. |
Willett Boger |
7/6/2011 |
Site Added to Database |
A new site has been added to the database |
Mitzi Read |
8/25/2011 |
Leaking Underground Storage Tank Release Confirmed - Petroleum |
LUST site created in CSP database for source area 8,000-Gal Dual Use Diesel UST #1, 79144 |
Mitzi Read |
8/29/2011 |
Exposure Tracking Model Ranking |
Initial ranking with ETM completed for source area id: 79144 name: 8,000-Gal Dual Use Diesel UST #1 |
Mitzi Read |
10/14/2011 |
Potentially Responsible Party/State Interest Letter |
Sent PRP letter to Rob Bizarro at the Fairbanks North Star Borough. Informed Mr. Bizarro that letter was sent. |
Willett Boger |
11/10/2011 |
Meeting or Teleconference Held |
Met with Borough Engineering Department to discuss the work plan being developed and to discuss the UST removal projects from the last two summers. |
Willett Boger |
5/9/2012 |
Document, Report, or Work plan Review - other |
DEC received and reviewed Release Investigation Work Plan FNSB Elementary School USTs: Wood River and Badger, prepared by Shannon & Wilson, Inc. (MBarnes) |
Willett Boger |
6/19/2012 |
Site Characterization Workplan Approved |
DEC sent letter to FNSB approving work plan for summer 2012 with an additional consideration for sample collection. (MBarnes) |
Willett Boger |
11/27/2012 |
Document, Report, or Work plan Review - other |
DEC received and reviewed Release Investigation Report FNSB Elementary School USTs: Wood River and Badger dated Nov 2012, prepared by Shannon&Wilson, Inc.
Groundwater samples from MW-1 contained DRO and benzene exceeding ADEC groundwater cleanup levels. Extent of soil and groundwater contamination is unknown. Further delineation near MW-1 would require additional boring and monitoring wells. (MBarnes) |
Willett Boger |
7/17/2013 |
Document, Report, or Work plan Review - other |
Reviewed and approved an addendum to the work plan for installation of two new monitoring wells with soil samples taken during installation. These wells will be NW of the original release and will also assist in determining ground water gradient. |
Willett Boger |
2/22/2017 |
Meeting or Teleconference Held |
Met with Borough Division of Public Works and briefly discussed the active FNSB CSP and LUST Sites. Preparing information request letter including 22 sites. |
Michael Hooper |
4/25/2017 |
Update or Other Action |
Sent the FNSB a letter addressing 22 active CSP/UST sites.
For Badger UST 1 the letter requested information about abandoned UST piping and ADEC notification prior to the next sampling event in late 2017. |
Michael Hooper |
6/23/2017 |
Update or Other Action |
Received a letter from the Borough with a contractor cost estimate for a phase 1 project scoping and file review for all active Fairbanks North Star Borough sites. |
Michael Hooper |
9/12/2017 |
Update or Other Action |
Received phonecall from FNSB deputy director of public works. A report containing the information requested in the April 21, 2017 letter should be coming by end of October. |
Michael Hooper |
12/21/2017 |
Update or Other Action |
Received memo with site summary in response to ADEC letter dated April 21, 2017. |
Michael Hooper |
5/22/2019 |
Document, Report, or Work plan Review - other |
Reviewed report for 2018 groundwater monitoring event. Groundwater data to date in the source area is inconsistent and a stable or decreasing trend cannot be established. Mailed letter requesting semi-annual groundwater monitoring. |
Michael Hooper |
3/25/2020 |
Document, Report, or Work plan Review - other |
Approved Workplan for groundwater monitoring through 2021. |
Michael Hooper |
3/19/2021 |
Update or Other Action |
Sent Email regarding future requirements at Borough sites. |
Michael Hooper |
1/25/2022 |
Site Characterization Report Approved |
Reviewed groundwater monitoring report. Contaminant concentrations still exceed ADEC cleanup levels in groundwater at this site. Agreed with recommendation for periodic sampling until cleanup levels are achieved. |