Site Report: FNSB - Weller Elementary School
Site Name: | FNSB - Weller Elementary School |
---|---|
Address: | 635 Elementary Drive, Fairbanks, AK 99712 |
File Number: | 100.38.235 |
Hazard ID: | 25684 |
Status: | Cleanup Complete |
Staff: | No Longer Assigned, 9074655229 dec.icunit@alaska.gov |
Latitude: | 64.887369 |
Longitude: | -147.590150 |
Horizontal Datum: | WGS84 |
We make every effort to ensure the data presented here is accurate based on the best available information currently on file with DEC. It is therefore subject to change as new information becomes available. We recommend contacting the assigned project staff prior to making decisions based on this information.
Problems/Comments
On 7/27/2011 a 2,500-gallon underground heating oil tank was removed from the portable music building at Weller Elementary School. During initial excavation and assessment activities, petroleum-contaminated soil was noted due to releases from the fill and vent pipes of the tank.
Action Information
Action Date | Action | Description | DEC Staff |
---|---|---|---|
6/6/2011 | Document, Report, or Work plan Review - other | DEC received and reviewed UST/Unregulated Buried Hot Cloure Work Plan & Site Assessment/Release Investigation/Corrective Action Plan (SA/RI/CAP) prepared by Independent Consultants Associated (ICA). (MBarnes) | Willett Boger |
8/2/2011 | Spill Transferred from Prevention Preparedness and Response Program | Spill tranferred by PERP staff Ashley Anderson. Spill no. 11309920802; spill date = 7/27/11; substance = diesel; quantity = unknown. | Mitzi Read |
8/5/2011 | Site Added to Database | A new site has been added to the database | Mitzi Read |
8/5/2011 | Exposure Tracking Model Ranking | Initial ranking with ETM completed for source area id: 79116 name: Portable Music Bldg - 2,500-Gal Underground HOT | Mitzi Read |
5/1/2012 | Document, Report, or Work plan Review - other | DEC received and reviewed Weller Elementary School Unregulated 2,500-Gallon Diesel Buried Heating Oil Tank Site Assessment/Removal Report dated April 2012, prepared by ICA. Fieldwork for the 2,500-gallon HOT removal was completed on July 27 and July 28, 2011. The tank and removed piping were disposed of at GNI for future recycling. Approximately 13 cy of contaminated soil was hauled offsite for thermally remediation. Approximately 20 cy of clean (below cleanup level or non-detect) soil was used to backfill. Soil sampled at the limit of the excavation was non-detect for DRO and BTEX, except near the vent stickup below building excavations (4,490 mg/kg DRO and below cleanup level for BTEX). Approximately 2-5 cy of contaminated soil remains on site. (MBarnes) | Willett Boger |
4/22/2015 | Update or Other Action | Received UST tank site assessment report dated December 5, 2014. As of 2013, the building, transformer, and replacement AST have all been removed. (MHooper) | Willett Boger |
1/31/2017 | Potentially Responsible Party/State Interest Letter | A PRP letter addressing several FNSB sites was mailed and the FNSB was notified. | Michael Hooper |
2/3/2017 | Exposure Tracking Model Ranking | A new updated ranking with ETM has been completed for source area 79116 Portable Music Bldg - 2,500-Gal Underground HOT. | Michael Hooper |
2/22/2017 | Meeting or Teleconference Held | Met with Borough Division of Public Works and briefly discussed the active FNSB CSP and LUST Sites. Preparing information request letter including 22 sites. | Michael Hooper |
4/25/2017 | Update or Other Action | Sent the FNSB a letter addressing 22 active CSP/UST sites. For the Weller Portable Music Buildings the letter notified them that the site file is being reviewed for possible closure. | Michael Hooper |
5/15/2017 | Cleanup Complete Determination Issued | A Cleanup complete determination was issued with concurrence from CS EPM I. All remaining soil is below the most stringent method 2 cleanup levels. | Michael Hooper |
Contaminant Information
Name | Level Description | Media | Comments |
---|---|---|---|
DRO | < Method 2 Most Stringent | Soil | All soil remaining on site is under the most stringent cleanup level for DRO. |
Control Type
Type | Details |
---|---|
No ICs Required |
Requirements
Description | Details |
---|---|
Advance approval required to transport soil or groundwater off-site. | |
Movement or use of contaminated material (including on site) in a manner that results in a violation of the water quality standards is prohibited (18 AAC 70) |
Hazard ID | Site Name | File Number |
---|---|---|
25535 | FNSB - Weller Elementary School UST 1 | 100.26.202 |